• Title/Summary/Keyword: 발주자 특성 분석

Search Result 58, Processing Time 0.025 seconds

Commissioning Model for CM Services Considering Project and owner Properties (프로젝트 및 발주자 특성을 고려한 CM업무 위탁모델)

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.632-636
    • /
    • 2007
  • These days, Construction industries are getting bigger, more specialized and complicated. Accordingly, the items of management is increased, also owner's organization is reduced. For this reason, various a method of construction management is introduced in the domestic construction industry. But introduction of construction management have caused increase cost because role duplication of managers. This role duplication is caused by confusion of trial and error, irrationality of system. And every construction project have peculiar properties, also owner's organization of project have various properties. This various properties is not reflected in the construction management , and the regimental method of construction management applied. In order to solving these problems, this study suggested the commissioning model for CM service reflected the properties of project and owner. This study have to selection of the critical service, service item of construction management and definition of owner's role through analysis of the properties of project, owner's capacity and requirement.

  • PDF

A Study on Optimal CM Service and Practice Considering the Characteristic of Owner (발주자의 특성을 고려한 CM업무 최적 활용에 관한 연구)

  • Kim Hae-Sun;Park Young-Ho;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.638-641
    • /
    • 2003
  • This paper suggests that construction management services should be performed considering the owner's and the project's characteristics through the examples of the successful projects. For this study, the critical CM services in each phase regarding schedule management, cost management and information management are presented and the problems of the CM delivery system in Korea are analyzed with respect to policies, users, suppliers/CMrs and construction environments. Besides, the situation of the delivery systems in Korea and the differences of each delivery system are presented. It is concluded that, for the settlement of CM delivery system in public construction market and, ultimately, the successful execution as an agent of the owner, CMr should diversify the services and give the optimum CM services appropriate for each project's characteristics.

  • PDF

A Study on the Selection Method of Project Procurement System based on Owner's Requirement (발주자의 요구사항을 고려한 발주방식 선정 방법에 관한 연구)

  • Nam, Hye-Won;Ahn, Kyung-Hwan;Kim, Chang-Gyo;Lee, Jea-Sauk;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.126-135
    • /
    • 2009
  • Recently, operation of highway is the complex digital Infrastructure based on complicated IT. The application of IT is increasing more and more in digital Infrastructure. Though IT is very convenient, if unpredicted operating risk of highway occurs, widespread damage can be large. When operating risk of highway occurs, road users are out of smoothly-run service because of the operating interruption. This risk causes unpredicted operating management cost and additional maintenance cost. It will excess over the planned operating cost, which may leads to users's unsafety and operator's insolvency because of income loss. Until now, related studies to find out the risk are not sufficient. The purpose of this study is to suggest risk cost items and to estimate the reasonable risk cost by using simulation method in case of occurring the huge power failure at the operating digitalized highway. This study indicates the several plans to hedge against risk cost and the management of highway project. From now on, it will be used as basic data to confirm the soundness of operating system in Digital Infrastructure.

Assessment of Owner Organization's Business Function for Successful Application of CM (발주자 유형별 CM 업무기능 특성 분석)

  • Kang Seung-Hee;Jung Young-Soo;Woo Sung-Kwon;Park Ji-Ho;Lee Young-Hwan;Lee Bok-Nam
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.388-393
    • /
    • 2003
  • Since the Construction Management(CM) was introduced into the Korea construction industry, the efforts for acceleration of CM adaption have been continued. The fact that an owner organization has the essential key to successful application of CM delivery method is true, but there has been no study on owner's organization. An owner should decide their organization type and measure their current needs of each CM business functions for successful application of CM. After the needs of CM business functions are measured, the owner should reinforce their required business functions through strengthening their in-house capability or outsourcing. Thus, this paper defines four kinds of owner organization type and suggest the form for evaluation of owner's CM ability and analyze about needs of each type's CM ability through making up question.

  • PDF

A Fundamental Study on the Development of Indicators for the Assessment of Design Quality (건축설계 품질 평가지표 개발을 위한 기초연구)

  • Choi, Yeon-Ju;Yi, June-Seong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.584-587
    • /
    • 2006
  • Quality assessment of the building is strongly dependent upon satisfying owner's requirements. To develop indicators for the assessment of design quality, survey on current situation of design process and analysis of Design Quality Indicator(DQI) is performed. The survey revealed that the main cause of frequent design changes is variability feature of owner's requirements. DQI, an indicator developed in UK, questionnaire encompasses questions which are relevant throughout the development stages of a building, and can be used at every key stage of the process. Further research will focus on the development of indicators for the assessment of design quality applicable to Korean market. In addition, research on the visualization method to present assessment results and supporting tools to facilitate assessment will be considered.

  • PDF

Determining Decision-making Factors for the Selection of Contract Methods in Public Construction (공공공사의 발주방식선정을 위한 의사결정요인 연구)

  • Kim, Dae-Gil;Lee, Ung-Kyun;Lee, Hak-Ju
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.405-412
    • /
    • 2015
  • The procurement of public construction, which has been selected mainly on the basis of the work experience of a department of public agencies that award construction contracts or those in charge of ordering, has not been executed through an objective selection process considering the construction types or characteristics. Thus, as a preliminary study on developing a model for the selection of contract methods, this study intends to analyze and present the key factors affecting the selection of procurement methods in public construction. Through a literature review on the existing methods, foundational factors were first presented, based on the analysis of these factors, the final influence factors were proposed. As a result, 6 factors contractor's characteristics, the environment of the construction market, relevant organization, the characteristics of a project, costs, and responsibility factors were determined, and 14 sub-factors were selected. The factors presented in this study will be used as base data for developing a decision making support model for the selection of contract methods in public construction.

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Construction Management) Considering Safety (안전을 고려한 건설사업관리용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Kim, Baek-Joong;Shin, Yoon-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.6
    • /
    • pp.557-566
    • /
    • 2019
  • The construction industry has the most safety accidents of any of the domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening their regulations on safety management. In particular, the OSHA (Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on the client's responsibility for safety management is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

Requirements Management Framework for Design Management and Information Characteristics (건설 발주자 설계 요건관리 체계화를 위한 개념적 틀 및 정보특성)

  • Jeong, Yeheun;Lee, Yunsub;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.3-15
    • /
    • 2020
  • For a successful construction project, the requirements of the client should be clearly defined and this should be reflected in the project based on the expertise of each project participant throughout the entire life-cycle. Therefore, it is necessary to establish the concept of Requirements Management to systematize and manage project requirements in terms of information management. This study aims to comprehensively define the concept of requirements management in the architecture industry and to provide a methodological basis for efficiently managing design requirements information by suggesting category of requirements information type and information analysis criteria. In addition, based on the case study, the requirements information was analyzed to propose a systemization methods of requirements management for PMO' design management and information management.

사업관리 절차서 개선 효율화 방안

  • Yun, Jae-Ho
    • Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.58-64
    • /
    • 2003
  • 건설 프로젝트를 수행함에 있어서 사업관리운영 절차서는 매우 중요하다. 국내에서는 일부 대형 공공 사업을 제외하고 프로젝트의 특성에 맞는 절차서를 개발하여 적용한 예는 드물다. 이러한 점을고려하여 현재 공사가 진행죽인 대표적인 국내민간자본 SOC사업을 표본으로 삼아 절차서의 활용현황을 검토분석하고 그에 따른 효율화 방안을 구하여 보았다. 이를 위해서 사업수행주체인 발주자, 사업관리자, 감리자, 설계자, 시공계약자 등을 대상으로 현재 보유/사용하고 있는 절차서에 대한 이해도, 사업관리지식체별 업무절차에 대한 이해도를 설문조사하였다. 설문조사의 분석결과를 토대로 건설사업관리수행상 업무수행절차의 전반적인 이행실태를 점검하여 문제점을 도출함으로서 향후 사업관리운영절차서의 체계적인 개발을 위한 추진방향을 설정하고 사업관리전반에 대한 인식제고와 효율적인 사업관리체계의 적용방안을 모색하여 제시하였다.

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.