Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.638-641
/
2003
This paper suggests that construction management services should be performed considering the owner's and the project's characteristics through the examples of the successful projects. For this study, the critical CM services in each phase regarding schedule management, cost management and information management are presented and the problems of the CM delivery system in Korea are analyzed with respect to policies, users, suppliers/CMrs and construction environments. Besides, the situation of the delivery systems in Korea and the differences of each delivery system are presented. It is concluded that, for the settlement of CM delivery system in public construction market and, ultimately, the successful execution as an agent of the owner, CMr should diversify the services and give the optimum CM services appropriate for each project's characteristics.
Korean Journal of Construction Engineering and Management
/
v.21
no.2
/
pp.70-78
/
2020
Construction program management requires more systematic management than traditional management methods due to the complexity of the project and various stakeholders. In particular, the systematization of closure phase of the process is in urgent need as there is a difference between the owner's expectations and the contractor's deliverables, resulting in delayed handovers, conflicts, frictions, and increased legal disputes. This study identified the process and activities of closure phase through domestic and international literature and case studies for the successful closure of the construction program. Further, the proposed processes and activities were verified through expert verification for appropriateness and the possibility of application to the site. By utilizing the processes and activities proposed in this study, the project aims to overcome the limits of closure phase and improve the satisfaction of the owner, as well as to enhance the global competitiveness of domestic construction companies.
Korean Journal of Construction Engineering and Management
/
v.18
no.4
/
pp.17-26
/
2017
The sustainable growth of Construction Management(CM) market depends on clients'acceptance from positive project outcomes of CM services. Achieving the positive outcomes requires CM firms'competency and efforts. Equally, it is critical to understand and overcome barriers of CM performance, which cause inefficiencies and under-performance of CM services. The objective of the study is to identify and discuss the barriers of CM performance during pre-construction stages in private CM projects based on the FMEA technique. Major findings basically suggest that clients and CM firms have roles to play, individually and collaboratively, in order to improve CM performance by eliminating performance barriers.
Korean Journal of Construction Engineering and Management
/
v.6
no.4
s.26
/
pp.122-132
/
2005
The importance of design value engineering in construction projects recently is rising, which deal about in reduction of cost and improvement of quality. Especially, From half of this year 2005, It is predicted that the value engineering is necessary to be carried out in the projects having project cost more than 10 billion won. In increasing importance of value engineering, we require a way by which we accomplish value engineering systemically and effectively though it is not common in domestic situation. So, this case study shows a way in carrying out value engineering effectively. As the way is to apply QFD(Quality Function Deployment) in pre-study work of design value engineering, this is expected to contribute as function analysis and reflect the requirement of users or owners.
Proceedings of the Korea Information Processing Society Conference
/
2017.04a
/
pp.595-597
/
2017
Despite rapid growth of the global SW market, the Korean market still has a long way to go to impact global power nations. What is the reason that holds back of the No. 1 high-speed Internet country in terms of SW development? It is lack of the foundation for development of the Korean SW industry. In this context, the Korean government declared SW-oriented society and developed polices for each sector; Regarding movement that tries to apply the SW partitioning order institution in public sector to IT projects, this research aims to study SI project problems expected when conducting the SW partitioning order institution and improvements focusing on the public sector that accounts for about 30% of the entire SW industry. SW partitioning order institution is divided into planning-design and development-realization stages, which may cause problems when it is applied to SI projects. As such, the study analyzed SI projects and separate and partitioning order, exemplary cases and examples of industrial projects related to partitioning order, and drew improvement measures from institutional, technological and managerial viewpoints. The research aims to help people involved in IT projects sell SW at proper prices and improve the environment, and presents directions to create a system that strengthens competitiveness of the SW industry and SI projects by providing solutions to problems that suppliers and demanders should recognize before implementing the SW partitioning order institution.
Korean Journal of Construction Engineering and Management
/
v.16
no.2
/
pp.12-20
/
2015
The public employers are faced the mounting importance of decision process to settle the optimum VE delivery system of such public facilities buildings and etc. The elements of decision process of the public employer are formed in the various relationships of the concerned and when the projects are coming into effect, the decision process in the VE delivery method and the selection of contractor will be the name of the game. The decision process in the VE delivery method and the selection of contractor are created a case to be one and the same as well as initiates a consistency for the performance. However, the function and role of the public employer are projective accordingly to the organization of employer and the employer especially no system is equal to the capability of perfect evaluation and verification of the ability of the employer. Especially the lowest bidder policy that started with justification to increase the competitiveness and technical capability of the contractors through the completion in between contractors has been providing the hotbed for insolvency, irregularity and irrationality as a result. From this point of view it is declared that the buildup the edifice of supporting system in the process of decision to recover the mutual trust and respect of the concerned in the VE delivery system with the technostress and the systematization based on drawing the elements which affect the decision process of public employer.
Korean Journal of Construction Engineering and Management
/
v.18
no.1
/
pp.3-16
/
2017
Integrated project delivery (IPD) is suggested as an alternative to traditional delivery methods such as design-build (DB), design-bid-build (DBB), and construction management at risk (CMR). Many foreign research studies have approached IPD not only in the contractual aspect but also the work implementation method aspect. However, most research projects in Korea have focused on the contractual aspect of IPD for asserting that the characteristics are the critical matter. The Korean institutional and legal system does not permit the multi-party agreement; therefore, it is difficult to adopt IPD in Korea's construction industry. The researchers do not wait the system to be changed, but we do identify the possibility of adopting IPD in Korea in the perspective of work implementation method, except the contractual characteristics. Thus, the goal of this research is to identify one project that does not include IPD agreement but utilizes other IPD characteristics whose contractual results have similar performance to those that utilize all characteristics of IPD including agreement. This research is expected to enhance performance of the construction project in a Korean construction environment by embracing IPD characteristics as overcoming limits and bounds of the traditional delivery method.
Kim, Sung-Hoon;Lee, Sang-Ho;Nam, Sang-Hyeok;Sun, Oh-Young
Journal of the Computational Structural Engineering Institute of Korea
/
v.24
no.4
/
pp.463-469
/
2011
BIM(Building Information Modeling) technologies should be applied for the construction life cycle to maximize its efficiency, but the utilization for the construction phase has been significantly lower than that for the planning and design phase. Recently, some of BIM techniques such as 3D design review, 4D schedule management and so on are being introduced for efficient managing to the big national construction projects. In this study, the utilization plans of BIM are presented for the construction phase of civil engineering facilities. The methods of utilization of BIM are discussed for each type of construction, and the techniques applied to the Seoul Subway Lot No. 919 are analyzed for checking the applicability and usability. In particular, a web construction management system based on BIM can help field engineers, headquarters and contractors to use BIM more effectively, and it can be extended to maintenance phase for more efficiencies.
Proceedings of the Safety Management and Science Conference
/
2002.05a
/
pp.23-30
/
2002
최근 우리나라의 건설산업은 Project의 규모가 대형화됨에 따라 기계화 시공 신공법 도입등 공정작업이 다양해지고 새로운 방법들이 많이 시도되고 있으며 건설산업도 기획, 설계, 발주, 시공, 유지관리라는 연속적 단계를 통하여 각 단계가 상호 유기적 연관성을 가지므로 건설현장의 근원적 안전성 확보를 위해서 건설 시설물의 Life cycle 전 단계를 걸쳐 안전관리 개념과 기법이 도입되어야 한다. 따라서 본 연구에서는 CM에 의한 단계로 안전성 확보에 주력하고 미국 CMAA의 단계별 기능별(phase, 6Function) 업무내용에서와 같이 Safety Management를 한다. 또한 CM제도 정착에 따른 초기단계를 규정하는 안전관리 법령 재정을 하여 단계적으로 자율적 안전 관리를 유도하여 재해예방을 하도록 해야한다.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.270-273
/
2003
Injuries and fatalities at construction site have been rated higher than other industries in Korea and moreover safety management performance has been driven at the construction site only now days. Some of the foreign countries have recently begun to drive safety management performance of the owners and designers from an early phase of the legislated and researched projects As a result, they can get rid of injury and fatality risks at an earlier phase and then they are able to prevent those accidents in the construction site. Accordingly, it is required to introduce the concept of Safety Through Design applied in these foreign countries as a part of the collaborative safety management of our domestic construction site. Therefore this study aims to suggest the role of domestic owners and designers on the basis of the foreign safety concept and to apply it as an essential part of their roles in the domestic construction projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.