• Title/Summary/Keyword: 미집행 도시계획시설

Search Result 15, Processing Time 0.018 seconds

A Study on the Actual Conditions of Neighborhood Parks : A Case of Busan Metropolitan City (근린공원시설 조성실태에 관한 조사연구 - 부산광역시를 사례로 -)

  • Kim, Gyeung-Su;Baek, Tae-Kyung
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.8 no.2
    • /
    • pp.68-80
    • /
    • 2005
  • Parks became a matter of concerned among urban planning facilities that have not been executed for a long time because of the judgement of constitutional disagreement. This study deals with actual condition of constructing neighborhood park at the level of urban planning. In order to enhance the coefficient of citizens' utilization of parks. This study analyzes current situation of neighborhood parks and developing condition in Busan, revealing problems by investigating types of facilities under construction as well as by comparing size and progress of the parks under construction. This study tries different kind of access to the problems with the emphasis on estimation of planning and establishing neighborhood parks on the basis of the coefficient of citizens' utilization. Through the various examinations, this study brings into relief the problems being created in the course of establishment of parks which functions only as green tracts of land at present. As a result, the following conclusions could be made. First, from the viewpoint of location the parks, Busan parks are mostly located in the mountain areas adjacent to urban districts. Secondly, establishment of neighborhood parks is usually for development projects and the facilities introduced in them are monotonous. Thirdly, there is a tendency towards expansion of size and standardization of facility. Forthly, establishment plan of parks lacks profitability. Lastly, there is serious limitation in the size of land for developing neighborhood parks, and what is worse, there is no management of them.

  • PDF

Change of Carbon Fixation and Economic Assessment according to the Implementation of the Sunset Provision (도시공원 일몰제에 의한 탄소고정량과 경제성 분석에 대한 연구)

  • Choi, Jiyoung;Lee, Sangdon
    • Ecology and Resilient Infrastructure
    • /
    • v.7 no.2
    • /
    • pp.126-133
    • /
    • 2020
  • In accordance with the implementation of the sunset provision to cancel the designations of urban park sites that remained unexecuted for a prolonged period until 2020, the park sites in the city center, which account for 90% of the long-term unexecuted urban facilities subjected to the provision, are currently on the verge of development. The total area of the 204 park sites that will disappear in Seoul as a result of this provision is 95 ㎢; moreover, 116 of these are privately-owned. It is expected that the possible changes in the use of these park sites could result in reckless development and reduction of green space, which would ultimately affect the ecosystem. This study applied the InVEST model to calculate the changes in the fixed carbon amount before and after the implementation of the sunset provision to estimate the economic value of these changes. The study focused on Jongno-gu in Seoul because it has the most unexecuted park sites subjected to the lifting of the designation. The research findings show that the fixed carbon amount provided by the unexecuted park sites in Jongno-gu was 374,448 mg, prior to the implementation of the sunset provision; however, the amount was estimated to decrease by 18% to 305,564 mg after its execution. When calculated in terms of average value of the real carbon price, this translated into a loss of approximately 700 million won. In addition, considering the social costs including both climate change and the impact on the ecosystem, an economic loss of approximately 98 billion won was projected. This study is meaningful because its predictions are based on the estimation of fixed carbon amount according to the implementation of the sunset provision in Jongno-gu and scientifically calculates the value of ecological services provided by the parks in the city. This study can serve not only as a basis during the decision-making process for policies related to ecosystem conservation and development, but also as an evidentiary material for the compensation of privately-owned land that is designated as urban park sites and was unexecuted for a prolonged period.

Research on the Importance-Satisfaction Perception of Users of Private-Initiated Park Development Project - Focused on Jikdong Neighborhood Parks in Uijeongbu City - (민간공원 특례사업 추진 대상지 이용객의 중요도-만족도 인식에 관한 연구 - 의정부 직동근린공원을 대상으로 -)

  • Kim, Jong-Ho;Kim, Gun-Woo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.63-76
    • /
    • 2022
  • This study was conducted to compare the perceptions of the park use status, importance, and satisfaction of users in the first implemented and completed Uijeongbu Jikdong Neighborhood Park among the private park special projects carried out as a countermeasure for long-term non-execution of urban parks. To this end, in the initiated project, apartment residents and non-residents were classified according to the promotion plan, and a questionnaire research on importance and satisfaction was conducted to analyze the park use status and IPA(importance-performance analysis). First, as a result of the analysis of the current situation in terms of locational characteristics that occur during the promotion of special projects for private parks, unlike the mountainous areas, the targeted site was close to flat land, indicating that users' satisfaction with the landscape was high. Second, the access of the apartment residents in the initiated project site was easy. Thus, the use rate of residents was relatively higher than that of the non-residents. Third, differences in perception by item were identified through the analysis of IPA and the establishment of strategies. In quadrant I, among the facilities and services, installing restrooms was the priority for residents, and parking facilities and rest facilities were the priority than installing restrooms for non-residents. In quadrant II, overall scores for residents and non-residents were similar, but the distance to the park was in quadrant III due to the low level of satisfaction among non-residents. In this study, the difference in perception between residents and non-residents may cause problems in access and facilities in managing the park in the future. Therefore, it would be necessary to find a way to improve it by establishing a management strategy that takes into account the difference in the perception of residents after construction. In addition, through the results of this study, it was judged that the purpose of park development, the selection of types of parks, and the selection of plans and management indicators for each kind would be significant in the promotion of initiated projects in the planning of park development.

Spatial Decision Support System for Development and Conservation of Unexecuted Urban Park using ACO - Ant Colony Optimization - (장기 미집행 도시계획시설 중 도시공원을 위한 보전/개발 공간의사결정 시스템 - 개미군집알고리즘(ACO)를 이용하여-)

  • Yoon, Eun-Joo;Song, Eun-Jo;Jeung, Yoon-Hee;Kim, Eun-Young;Lee, Dong-Kun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.2
    • /
    • pp.39-51
    • /
    • 2018
  • Long-term unexecuted urban parks will be released from urban planning facilities after 2020, this may result in development of those parks. However, little research have been focused on how to develop those parks considering conservation, development, spatial pattern, and so on. Therefore, in this study, we suggested an optimization planning model that minimizes the fragmentation while maximizing the conservation and development profit using ACO (Ant Colony Optimization). Our study area is Suwon Yeongheung Park, which is long-term unexecuted urban parks and have actual plan for private development in 2019. Using our optimization planning model, we obtained four alternatives(A, B, C, D), all of which showed continuous land use patterns and satisfied the objectives related to conservation and development. Each alternative are optimized based on different weight combinations of conservation, development, and fragmentation, and we can also generated other alternatives immediately by adjusting the weights. This is possible because the planning process in our model is very fast and quantitative. Therefore, we expected our optimization planning model can support "spatial decision making" of various issue and sites.

A Study on the Village Improvement Plan by Typological Analysis of Greenbelt-lifted Villages (개발제한구역 해제취락 유형분석을 통한 취락정비방안 연구)

  • Yoon, Jeong-Joong;Choi, Sang-Hee
    • Land and Housing Review
    • /
    • v.4 no.1
    • /
    • pp.77-87
    • /
    • 2013
  • About 1,800 villages have released from Greenbelt since Greenbelt-reform-policy for readjustment of the area was promoted after 1997. Even though the government intended to attract planned development & improvement of these lifted villages through District Unit Plan and designating the lifted area as low-rise and low-density zoning considering the characteristics of the Greenbelt region, there are still many problems to be solved: a lack of funds, insufficient capability for self-improvement and unexecuted SOCs in long-term etc. It seems that these problems are caused by focusing on the lifting areas itself instead of researching deeply the condition and characteristics of the villages and searching proper direction/plans of improvement before lifting Greenbelt In addition, the existing plan of village improvement and management was not considering physical and spacial characteristics of the areas, social and economic situation of residents and relationship between the villages and surrounding cities, though these conditions are different among each villages, and the related regulations are applied uniformly across all the villages and those have been causing many civil appeals and environmental problems. In these respects, this study aims to consider the problems of the lifted villages using the existing researches on them and to make typology by characteristics-data of the villages and to establish improvement strategies of each types. In this study, the villages were classified into 5 types as a result of cluster analysis on 424 villages among all 1,800 through variables of locational potentiality : location, accessibility, size and form of village, condition of regulations etc. According to function of the villages, they were divided into 4 types: urban-type, rural-type, industrial-type and neighborhood-centered-type. This study also drew 4 improvement-strategy-types by combination of locational potentiality and village-function : type of improving life-environment, type of improving production-infra, type of inducing-planned-improvement and type of constructing center-of living-circle. Finally, this study suggested the directions of the each 4 types to desirable improvement and management which could be used to make and complement plans for village improvement.