A Study on the Institute Warranties in the Institute Time Clauses-Hulls 1/10/83 (선박보험약관상 협회항행제한담보약관(協會航行制限擔保約款)에 관한 연구)

  • Park, Sang-Kab;Kim, Jong-Rak;Shin, Young-Ran
    • Journal of Navigation and Port Research
    • /
    • v.36 no.5
    • /
    • pp.329-338
    • /
    • 2012
  • The Institute Time Clauses-Hulls 1/10/83 has been using widely with attachment and/or endorsement of the Institute Warranties 1/7/76 stipulating vessel's trading limits. Taking into consideration of several changes and renewals on the contents of the Institute Time Clauses-Hulls for clarifying the clauses themselves with development on technology of vessel's construction and navigational equipments up to the present, the clauses on the Institute Warranties 1/7/76 should have been changed and/or renewed. Moreover, the insured still has been burdening additional premium in vessel's navigating and / or calling to the areas stipulated in the Institute Warranties 1/7/76 regardless of any changes of marine business environments. Thus, this study aims to analyze the Institute Warranties 1/7/76 as well as to suggest a reasonable level of additional premium for breach of Institute warranties through not only a comparative analysis between the Institute Warranties clauses and those of the corresponding Institute Warranties using in the Japanese Fire and Marine Insurance companies but also consideration of current circumstances on changes in climatic conditions, vessel design, navigation and communication requirements and capabilities.

손해보험 분쟁조정사례 - 약관 교부.명시를 둘러싼 제 쟁점

  • Lee, Seung-Won
    • 방재와보험
    • /
    • s.148
    • /
    • pp.44-51
    • /
    • 2013
  • 대리운전업체에 소속되어 있는 대리운전자가 대리운전 보험에 가입한 경우, 보험료는 대리운전자가 직접 부담하는 경우가 대부분이나 계약당사자인 보험계약자는 대부분 대리운전업체로 되어 있다 보니 약관내용에 대해 제대로 설명을 듣지 못했다는 이유로 보상범위 등을 둘러싼 분쟁이 발생하는 경우가 많다. 본고에서는 차주가 동승하지 않은 채 대리운전자가 차량을 운전하던 중 발생한 사고를 대리운전보험에서 담보하는 '대리운전 중 사고'로 볼 수 있는지 여부를 다룬 사건을 소개하고자 하는데, 쟁점 가운데 약관의 설명의무와 관련 사항을 일부 언급하고 있어 동 내용을 살펴보고 나아가 약관 설명의무의 법적 성격 및 유사 분쟁사례 등을 개관하고자 한다.

  • PDF

A Study on Assuring the Effectiveness of Administrational Regulation and Supervision in Korea Private Security (민간경비에 대한 행정규제 및 감독의 실효성 확보 방안)

  • Lee, Sang-Chul;Shin, Sang-Min;Lee, Min-Hyong
    • Korean Security Journal
    • /
    • no.12
    • /
    • pp.245-269
    • /
    • 2006
  • The suggestions that follow are about the device to assure the effectiveness of administrational regulation and supervision in Korean private security. First, government clearance should be reinforced. For this it is necessary that the qualification for security dealer-careers and academic backgrounds with security etc.- should be elucidated in Security Law. Also it should be achieved to increase the capital fund and to keep security guards for insuring substitutional manpower. Second, after legal permission governmental supervision should be done in quality by means of setting up the competent institutions independently. Third, the punishment for obtaining security license mendaciously, carrying out illegal or unfair task and assigning Security Guard Supervisors expediently should be strengthened. Also to prevent expedient acts it is necessary to prescribe illegal or unfair acts in the concrete in Security Law and violators should be legally responsible. Fourth, to lay the foundation for security industry itself and make up for perfunctory governmental direct System for Professional License (of private security guard) should come into effect.

  • PDF

A Study on 'Romalpa' Clause under SGA (SGA상 'Romalpa' 조항에 관한 연구)

  • Min, Joo-Hee
    • Korea Trade Review
    • /
    • v.42 no.2
    • /
    • pp.391-410
    • /
    • 2017
  • This study examines Romalpa clause as an extended or enlarged retention of title clause under SGA. Under a simple retention of title clause, the seller retains title to goods supplied until the goods have been paid. A simple retention of title gives the seller super-priority interest in other creditors of the buyer without registering a charge. Aluminium Industrie Vaassen BV v. Romalpa Aluminium Ltd introduced the concept of 'extended reservation of title(so called 'Romalpa clause') in English law. It is because the Court of Appeal held that under an extended reservation about title clause the seller can trace his title into money which constitutes the proceed of sale by the buyer of goods supplied by the seller. However, since Romalpa case, the courts are reluctant to uphold the seller's extended title. Under Romalpa clause, the seller attempts to extend his protection by laying claims to new products manufactured from his goods or to proceeds of sale by the buyer. Where the seller's goods are lawfully used by the buyer to create new goods, the property in the new goods will generally vest in the buyer. It is because there has been discomfort if the seller gains the windfall profit of the new goods. Moreover, regarding tracing proceeds of sale by the buyer, the courts held that the seller must establish fiduciary relationship with the buyer. If the fiduciary requirement cannot be established, the extended retention of title clause is seen as a charge over the proceeds, and void if not registered. For these reasons, it is difficult that the claims based on the extended retention of title clause would be upheld.

  • PDF

Software Development Methodology-based Instruction Process Modeling (소프트웨어개발방법론에 기반한 교수-학습프로세스모델링)

  • Park, ChoongShik;Lee, SaeNa;Kim, JaeHong;Bak, YongWhan
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2009.05a
    • /
    • pp.822-826
    • /
    • 2009
  • 학습 프로세스는 학습참여자인 학습자들과 교수자의 상호적인 활동에 의하여 교수-학습이 이루어지는 과정이라고 할 수 있다. 이러한 과정에서 일련의 학습자료들이 제공되고 만들어진다. 교수-학습이론에서 여러 가지 모델이 제안되어 이용되고 있지만 각 학습참여자의 역할과 학습자료간의 관계가 명시적으로 정의되어 운영되지 못하는 점이 있다. 한편 서비스제공이나 소프트웨어개발과 같은 추상적인 결과물을 생산해야하는 경영학이나 소프트웨어공학에서는 프로세스(과정)의 관리만이 그 결과물의 질을 담보할 수 있다고 생각한다. 결과물의 질관리를 위한 프로세스의 관리는 프로세스의 역할별 활동에 의한 투입/산출물, 프로세스들의 관계를 명시하고, 그에 따른 측정가능한 지표를 개발-분석함으로써 이루어진다. 본 논문에서는 소프트웨어 개발 방법론에 기반하여 구성주의적 교수-학습 프로세스를 정의함으로써 교수활동에 구성주의적 교수-학습이론을 용이하게 적용할 수 있는 지침을 제공하고, 향후 프로세스를 기반으로 하는 교육 서비스사이언스의 기본적 구성요소를 제공하고자 한다.

  • PDF

법령과 고시 - 건설산업기본법 개정

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.302
    • /
    • pp.82-86
    • /
    • 2015
  • 정부는 건설산업기본법 일부 개정안을 지난 8월 11일 공포했다. 개정된 건산법은 앞으로 수급인이 일방적으로 하도급계약을 해제 해지하면 계약이행보증금 지급을 요청할 수 없고 하도급공사에 추가 변경사유가 발생한 경우 그 내용과 금액, 기간 등을 명시한 서면을 교부하도록 의무화했다. 한편 하자담보책임기간은 원칙적으로 법정기간으로 하되, 공사특성 등을 고려해 도급계약에서 따로 정할 수 있도록 하는 한편, 그동안 논란이 됐던 '완공일'의 개념도 '목적물의 관리 사용을 개시한 날과 준공검사를 완료한 날 중에서 먼저 도래한 날'로 명확히 규정했다. 이밖에 건설 관련 법령의 이해도 및 윤리의식 제고를 위해 신규 건설업자에 대한 교육제도를 신설하였으며, 건설 관련 공제조합 운영위원 수 상한을 확대하여 보다 많은 대표성 있는 조합원이 운영위원회에 참여할 수 있도록 했다. 개정된 건설산업기본법은 2016년 2월 12일부터 시행된다.

  • PDF

A Study on the Implied Terms of Safe Berth under Voyage Charterparty (항해용선계약상 안전선석의 묵시조건에 관한 연구)

  • Han, Nak-Hyun;Kim, Eun-Joo
    • Journal of Korea Port Economic Association
    • /
    • v.26 no.3
    • /
    • pp.92-113
    • /
    • 2010
  • The purpose of this study aims to analyse the implied terms of safe berth under Voyage charterparty with the Rebon case. Where the safety of the berth is warranted, but not the safety of the port, then the charterer's obligation is to nominate a berth which can be approached safely from within the port and which was itself, save insofar as affected by hazards or risks which affect the port as a whole or all of the berths within it. This case is an appeal from an order made by the judge dismissing an appeal from a final declaratory award on preliminary issues made by arbitrators. The judge expressed the question for decision somewhat differently as follows: if a specific load port is named in a voyage charterparty and there are several possible berths within that port to which a vessel could be directed to load by the charterers and there is no express warranty in the charterparty of the safety of either the port or the berth to which the vessel is to be directed by the charterers, is the charterparty subject to an implied term that the charterers must nominate a safe berth at that load port?

Some Considerations on Aviation Insurance : With a focus on coverage of aviation insurance (항공보험에 대한 약간의 고찰 -항공보험의 담보범위를 중심으로)

  • Kim, Sun-Ihee;Jung, Da-Eun
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.25 no.2
    • /
    • pp.43-77
    • /
    • 2010
  • The development of the aviation industry has exponentially increased the volume of passengers and cargo and gradually expanded the damage scope of all kinds of accidents in the process of transportation. As a result, the need for aviation insurance has accordingly grown bigger and bigger every day. That is why most nations have a law to force mandatory insurance on the aviation industry. However, the Montreal Convention of 1999, which Korea also signed and today has the most extensive effect in the international civil aviation community, offers no clear interpretations about the coverage of aviation insurance along with the Air Transport Business Promotion Act of Korea. The advanced nations of air transport business such as EU, the U. S. A. and Canada prescribe the coverage of aviation insurance and have a law that makes it mandatory for all the passengers and third parties to cover air carrier's liability. EU requires them to include cargo and baggage in scope of coverage, and the U. S. A. and Canada recommend insuring by having a shipper receive a written notice containing information about whether the concerned cargo is insured or not. Making the scope of coverage of aviation insurance clear by law serves several purposes including diversifying risks for air transport companies, providing the victims with enough protection, observing the international accountability required in the air transport industry, and promoting the productive and sustainable growth of the aviation industry. Thus problems with Korea's aviation insurance should be resolved by clearly stating the coverage of aviation insurance that the Korean air carriers and operators need to insure according to the current state of Korea's air transport by consulting the legislations of the advanced nations in air transports. and enacting a law to comprehensively govern Korea's aviation insurance.

  • PDF

A Study on the Improvement Plan through Analyzing the Perception of Expert Group about Landscape Construction Defects (조경공사 하자에 관한 전문가 집단간 인식분석을 통한 개선방안 연구)

  • Lee, Sang-Suk;Yu, Joo-Eun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.4
    • /
    • pp.104-113
    • /
    • 2012
  • This study aimed to find out the improvement plan through analyzing the perception of the expert group engaged in landscape architectural construction and to focus on analyzing the expert groups' experience on Landscape Construction Defects (LCD), defect liability, warranty period, and implementation of the defect liability. The results are as follows: 1. Regarding the experience on the LCD, landscape construction contractors were an awareness of the LCD issue at a serious level, while public-sector clients recognize moderately the LCD issue; and on the first priority in defect implementation, landscape construction contractors considered repair cost while public-sector clients value the identifying causes of defects. 2. In disagreement on the defect liability, landscape construction contractors attributed it to client's lack of responsibility for maintenance while public-sector clients ascribed it to the absence of dealing a criteria with LCD, and regarding the appropriate defect implementation, public-sector clients preferred the following objective by dealing the criteria with LCD while landscape construction contractors advocates by sharing the responsibilities for dealing with LCD based on the identified causes of construction defects. 3. Regarding the warranty period, the public-sector clients considered the 2-year warranty period as appropriate while landscape construction contractors considered it comparatively long, and concerning the commencement of defect warranty period, the public-sector clients viewed it as it should commence to cover the overall completion of the construction while landscape construction contractors perceived it to start on the completion of each work. 4. As for the improvement of the defect implementation system, public-sector clients considered it necessary to establish the objective dealing the criteria with LCD while landscape construction contractors viewed the legislation of maintenance duty. Also, with regard to the important value in establishing and dealing the criteria with LCD, public-sector clients pointed out the objective of the criteria for determining the defects per work type while landscape construction contractors suggested client (user)'s maintenance duty. Because of research, because the system in dealing with LCD is an absence of LCD management agency and dealing the criteria with LCD, it is needed to establish an LCD management agency and make the system in dealing with LCD.

Systematic Improvement for Effective Operation of Long-Term Continuous Construction Contracts (장기계속공사계약의 효율적 운영을 위한 제도 개선)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.3-10
    • /
    • 2019
  • The entire duration of the long-term continuous construction contract project cannot be expected when calculating the initial budget as the construction of the contract is carried out annually according to the budget composition. In addition, the statutes related to the defect liability and execution of contracts have not been established systematically in relation to the contract. Therefore, there are many problems at the actual construction site with regard to the defect liability or the performance of the contract in relation to the contract. In this study, the following improvement directions were presented for the efficient operation of the contracts: First, the defect liability is legal and should be specified in an Act rather than an enforcement decree. Second, if the parties to the contract vary in the following order in the contract, the special agreement should be specified in the enforcement decree. Third, in the event of an indirect cost due to the extension of the period of the long-term continuous work, the contingency items of the total project cost management policy should be utilized. Fourth, in the case of general construction contract conditions, clauses related to the purchase of the premium of the CAR, inspection, taking over, defect repair, and defect inspection shall be supplemented.