Evaluating and Suggesting Key Risk Factors according to Risk Hierarchy of Occurrence Field in the Overseas Development Projects (발생영역별 리스크 위계에 따른 투자개발형 해외건설사업의 핵심 리스크 인자 도출 및 평가)

  • Lee, Jeong-Seok;Ahn, Byung-Ju;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.70-79
    • /
    • 2012
  • The Korean Government recently has been focused on strengthening competitiveness of order and stimulating construction market in the international construction industry. It has planned to extend the ODPs (overseas development projects) in order to diversifying the international construction market of which is domestic construction companies, placing too much emphasis on plant projects of the Middle East. However, literature review of risk analysis in the ODPs shows that the number of case study is several. Therefore, Authors asserted the necessity of risk analysis in the ODPs. The purpose of this study is to suggest a methodology that find KRFs (key risk factors) in the ODPs and analyze them, using AHP and Fuzzy theory. As a result, the 37 KRFs are selected and explained characteristics of them. A future direction of this study is to suggest a risk management model in the ODPs and prove feasibility of it.

Integrated Risk Analysis for Mitigation the Urban Flood Disaster (도시홍수 피해 경감을 위한 통합 리스크 분석)

  • Lee, Jae Yeong;Keum, Ho Jun;Han, Kun Yeun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.50-50
    • /
    • 2017
  • 도시홍수의 잠재적 위험은 홍수경감계획이 발전됨에 따라 감소하지만, 침수피해 가능성은 도시화와 도시 확장에 따라 증가한다. 침수피해 가능성에 대한 사전 파악 및 위험도 분석은 대규모 침수재해 발생 시의 위기관리에도 도움을 준다. 또한, 경제적 피해에 대한 예측은 재해발생 후 복구 및 복원 작업에 필요한 자원 할당에 매우 유용하며, 잠재적 홍수 피해에 대한 예측은 장기적인 홍수경감계획과 재해관리에 필요하다. 본 연구에서는 다차원 침수해석 모형의 결과로 산정 가능한 침수심, 유속 등의 지표들을 복합적으로 고려하여 침수위험도를 산정하고, 침수 발생 위험이 있는 지역의 인문 사회 경제적 지표를 통해 피해 저감 및 복구성을 반영하기 위한 재해 취약인자를 선정하여 해당 지역에 대한 취약도를 산정하였다. 또한, 분석된 위험도와 취약도의 연산으로 통합리스크 분석을 실시하여 침수 발생 시 해당지역에 대한 피해 예상과 지역별 상대평가가 가능하도록 하였다. 위험도와 취약도 및 리스크 분석은 다양한 인자를 동시에 고려하기 위해 여러 개의 기준에 대한 선호도를 결정하거나 최적 대안을 선택하는 다기준의사결정(MCDM)기법을 적용하였으며, MCDM기법 중 보편적으로 많이 이용되는 TOPSIS기법을 적용하였다. 이러한 리스크 분석은 우리나라 전체, 특정 시도, 시군구, 읍면동 간의 침수피해와 관련한 상대적 비교 평가가 가능하며, 대응 및 대비의 관점에서 저감 대책 수립의 우선 지역을 도출하는 데 활용될 수 있을 것이며, 침수피해 발생 후, 리스크가 큰 지역에 대해 우선적으로 복구 조치가 이뤄질 수 있을 것이다. 또한, 한정된 지자체 예산 안에서 도시홍수 피해 경감 대책 수립을 위한 의사결정에 활용될 수 있을 것으로 판단된다.

  • PDF

Development of Risk Analysis Structure for Large-scale Underground Construction in Urban Areas (도심지 대규모 지하공사의 리스크 분석 체계 개발)

  • Seo, Jong-Won;Yoon, Ji-Hyeok;Kim, Jeong-Hwan;Jee, Sung-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.59-68
    • /
    • 2010
  • Systematic risk management is necessary in grand scaled urban construction because of the existence of complicated and various risk factors. Problems of obstructions, adjacent structures, safety, environment, traffic and geotechnical properties need to be solved because urban construction is progressed in limited space not as general earthwork. Therefore the establishment of special risk management system is necessary to manage not only geotechnical properties but also social and cultural uncertainties. This research presents the technique analysis by the current state of risk management technique. Risk factors were noticed and the importance of each factor was estimated through survey. The systemically categorized database was established. Risk extraction module, matrix and score module were developed based on the database. Expected construction budget and time distribution can be computed by Monte Carlo analysis of probabilities and influences. Construction budgets and time distributions of before and after response can be compared and analyzed 80 the risks are manageable for entire whole construction time. This system will be the foundation of standardization and integration. Procurement, efficiency improvement, effective time and resource management are available through integrated management technique development and application. Conclusively decrease in cost and time is expected by systemization of project management.

Criteria for the Float Distribution (여유시간 분배기준에 관한 연구)

  • Lee Gul-Chan;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.509-512
    • /
    • 2003
  • The Critical Path Method(CPM) is an effective tool used for planning and scheduling. One of strong point in the CPM is what can calculate float. Float is able to prolong without having an effect on overall schedule of project, however concept and scope about ownership is not definite, because it is a by-product of project. Thus participants have had many dispute in using float because of their interests. In recent years, a few theories have evolved in an attempt to solve this problem. But the prior research did not make a reasonable distribution of float because their criteria of distribution was based on ratio for total project time. Actually, an application of float is achieved by participant's delay risk. Therefore. this paper proposes criteria for float distribution using delay risks, and the framework for the assessment of the delay risks.

  • PDF

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

A Study on the Cost Risk Analysis Method for Construction Projects (건설 프로젝트의 코스트 리스크 분석방법론에 관한 연구)

  • Lee Dong-Un;Kim Yeong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.201-211
    • /
    • 2003
  • Considering about construction projects characteristics, there Is an existing uncertainty which causes inaccuracy or invalidity under decision making situation. Therefore, cost risk analysis of numerous construction projects are Inclined to depend on expert's experiences and subjective judgements. In Korean domestic construction works, however, there is no reasonable method or process for applying subjective elements. Only probabilistic analysis using objective calculation are being used now. This research suggests a cost risk analysis method to analyze quantitatively Cost Impact by risk, and it appraises expert's subjective elements for the purpose of enhancing validity of cost estimation. Moreover, a new cost risk analysis method is introduced for providing convenient user interface in practical business.

Risk management applicable to shield TBM tunnel: II. Risk analysis methodology (쉴드 TBM 터널에 적용 가능한 리스크 관리: II. 리스크 분석 방법)

  • Hyun, Ki-Chang;Min, Sang-Yoon;Moon, Joon-Bai;Jeong, Gyeong-Hwan;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.6
    • /
    • pp.683-697
    • /
    • 2012
  • In this paper, a risk analysis methodology applicable to shield TBM tunnels was studied. Fault Tree Analysis (FTA) was utilized to identify all risk items and to calculate the probability of failure of each item and Analytic Hierarchy Process (AHP) was used to obtain the impact of each risk item. Finally, a risk level of each risk item can be assessed. Developed methodology is applied to a Seoul subway site in which EPB shield tunnel method was utilized and it was found that risk analysis results matched reasonably well with field data.

국내 인터넷전문은행 설립시 예상되는 전자금융리스크에 대한 대응방안 연구

  • Kim, Tae-Ho;Park, Tae-Hyoung;Lim, Jong-In
    • Review of KIISC
    • /
    • v.18 no.5
    • /
    • pp.33-48
    • /
    • 2008
  • 최근 은행의 소유지분한도와 설립자본금 등에 대한 정부의 금융규제 완화로 인터넷전문은행의 설립 가능성이 높아지고 있다. 그러나 우리나라의 전자금융환경은 전자금융거래법 제정에 따라 금융기관의 입증책임을 강화함으로써 금융기관의 전자금융리스크가 상대적으로 크게 증가하였다. 또한, 정보 공격기술 및 수법의 발달로 전자금융보안에 대한 위협이 지속적으로 증가하고 있다. 이외 에도 신BIS 리스크 평가에 IT운영리스크가 포함되는 등 금융환경 변화 및 정보통신 기술의 발전으로 인한 전자금융리스크가 계속 확대되고 있는 추세에 있다. 이러한 금융환경 변화와 함께 서비스채널이 인터넷에 집중되는 인터넷전문은행은 기존의 전통적인 은행과 차별되는 리스크에 추가적으로 노출될 위험성이 높다. 이러한 리스크에 대한 인식 및 대비 부재는 금융소비자가 금융권 전자금융거래에 대한 불신으로 확산되거나, 금융시장의 불안정성을 야기하는 금융사고로 이어져 자칫 국내 전자금융의 발전을 저해하는 심각한 요소가 될 수 있다. 본 논문에서는 국내 금융환경과는 차이가 있지만, 인터넷전문은행이 가져올 전자금융의 기술적 변화는 유사하다는 점에서 해외 주요국가의 인터넷전문은행 현황과 전자금융부문을 중심으로 인터넷전문은행 설립인가 사례를 살펴보고, 국내에서 인터넷전문은행 설립시 우리가 취해야 할 입장에 대해 시사점을 얻고자 하였다. 그리고 국내 전자금융 환경에서 전통적인 일반은행과 차별되거나 인터넷전문은행 고유의 특성으로 발생되는 주요 전자금융리스크를 다섯 가지로 분석하였고, 이러한 전자금융리스크를 줄이기 위한 대응방안을 모색해 보았다. 정부의 금융규제 완화는 금융자유화를 진전시켜 금융거래가 자유경쟁원리에 입각해 이루어짐에 따라 국민경제의 발전에 있어서 바람직한 결과를 얻고자 하는 것이다. 그러나 다른 한편으로 과도한 리스크에 노출 될 경우에는 금융시장의 불안정성을 야기하고 이로 인해 역 선택과 도덕적 해이를 야기 시키는 등 여러 가지의 폐해를 줄 수도 있다 이러한 폐해를 줄이기 위해서는 인터넷전문은행의 고유한 특성으로 수반되는 리스크와 상대적으로 그 중요성이 부각되는 전자금융리스크에 대한 관리 감독을 강화해야 한다. 또한 이러한 리스크 관리강화를 위한 제도적 장치는 인터넷전문은행의 자율성과 책임성을 부여하는 방향으로 이루어지는 것이 바람직하다. 인터넷전문은행이 실질적으로 다수의 금융이용자에게 다양한 혜택과 효율적인 금융서비스를 제공하기 위해서는 초기 사업계획 심사 단계에서부터 위험성이 크게 증가하는 전자금융리스크에 대해서, 적절한 관리방안 수립을 통해 예상되는 리스크를 줄이기 위한 노력이 필요하다고 생각한다. 그리고 인터넷전문은행에 대한 구체적인 인가요건이 마련되지 못한 현 상황에서, 국내 인터넷전문은행 설립이 우리나라 전자금융거래에 발전적 역할을 할 수 있도록 앞으로 더 많은 논의와 연구가 진행될 필요가 있다.