A Comparative Analysis of Risk Assessment Depending on International Project Types (플랜트, 건축, 토목 공종별 해외건설 리스크평가 비교분석)

  • Baek, Seungwon;Han, Seung-Heon;Jung, Wooyong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.125-136
    • /
    • 2019
  • This study investigated checked risk level before bid, actual risk level after award, contingency, and cost growth rate in the 124 international construction projects executed by Korean major companies. This study conducted comparative analysis by product type using rank analysis, ANOVA and correlation analysis. As a result, plant and civil projects have worse risk level than architecture projects not only in before bid but also in after award. Especially, country risk is the worst risk in both plant and civil projects, followed by project risk and capability risk. Also, although plant and civil projects reflect more contingency than architecture projects, contingency is not correlated with the checked risk level before bid. Lastly, the cost growth rate is correlated with the actual risk level in all product types. This study is expected to support in planning better practical risk management for international construction projects.

해사 사이버보안의 이해

  • 최성민
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2022.11a
    • /
    • pp.392-393
    • /
    • 2022
  • 선박에 IT/OT가 도입되면서 사이버 위협이 증가하고 있습니다. 선박에서의 사이버 리스크 관리를 위해 현존하는 선박 내 사이버자산을 식별하고, 노출된 사이버 위협을 인지하고, 사이버 리스크 평가를 통한 대응방안을 이론적, 사례적으로 분석한 내용을 공유합니다.

  • PDF

A Case Study of the Risk Identification in Construction Project (건설사업의 리스크 식별에 관한 사례연구)

  • Ahn, Sanghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.15-23
    • /
    • 2015
  • In the construction industry, risk management has gained constant attention as the factor not only to evaluate global competitiveness of the country but also to secure competitiveness of public institutions and private companies. For effective construction risk management, the specific work process improvement that can be employed in the field in terms of risk management of the entire corporation such as financial, insurance and safety management is necessary. To manage construction risks, what is important is the step to identifying inherent risks in the construction project. The identification of risks will be followed by the step to seeking ways to establish and manage strategies responding to the risks. This study suggests ways and processes to make a checkslit to identify risks through case studies. To that end, the focus will be placed on working process improvement of risk identification among stages to manage construction risks such as risk identification and analyses, planning to respond to risks, risk monitoring and management. The case study checklists show that setting up the system to classify risks by stage is helpful to figure out causes of risks to reduce or eliminate risk factors. The checklist making process that considers features of the project is expected to contribute to successful completion of the project by enabling effective risk identification and systematic risk management.

A Study on the Risk Evaluation of Construction Management Based on Risk Identification (위험도 기반 건설경영 리스크 평가에 관한 연구)

  • Lee, Hyun-Chul;Lee, Gun;Yeo, Sang-Ku;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.83-91
    • /
    • 2009
  • Construction industry is a complex industry which should be invested with plenty capital, manpower and resources. Investment factors and inner and outer environmental factors should be managed systemically in terms with risk factors possible to occur. It maximizes the profit to establish construction management by managing risk systemically. While previous studies were executed with risk related to some special progress lively, studies about risk in managing construction company leave much to be desired. Therefore, this study examined risk in the whole construction management, showed the checklist and deduced the quantitative factors through questionnaire analysis from specialists. Also, priority and grade of construction management factors were evaluated by analyzing weight of construction risk factors.

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

A Study on Risk Management Plan for Container Terminals - with Safety Accidents - (컨테이너터미널의 리스크 관리 방안 연구 - 안전사고를 중심으로 -)

  • Yeun, Dong-Ha;Choi, Yong-Seok;Kim, Sun-Gu
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2015.10a
    • /
    • pp.163-164
    • /
    • 2015
  • This paper analyze a pattern and a cause of safety accident occupied in work filed of container terminals, calculate risk index considering accident frequency and severity, and then provide the relative risk assessment. Based on this, this paper provides the priority of risk reducing method in container terminals, proposes the risk management plan.

  • PDF

Risk Assessment with the Development of CAES (Compressed Air Energy Storage) Underground Storage Cavern (CAES(Compresses Air Energy Storage) 지하 저장 공동 개발에 따른 리스크 사정)

  • Yoon, Yong-Kyun;Seo, Saem-Mul;Choi, Byung-Hee
    • Tunnel and Underground Space
    • /
    • v.23 no.4
    • /
    • pp.319-325
    • /
    • 2013
  • The objective of this study is to assess risks which might occur in connection with the storage of the highly compressed air in underground opening. Risk factors were selected throughout literature survey and analysis for the characteristic of CAES. Large risk factors were categorized in three components; planning and design phase, construction phase, and operation & maintenance phases. Large category was composed of 8 medium risk groups and 24 sub-risks. AHP technique was applied in order to analyze the questionnaires answered by experts and high-risk factors were selected by evaluating the relative importance of risks. AHP analysis showed that the operation & maintenance phases are the highest risk group among three components of large category and the highest risk group of eight medium risk groups is risk associated with the quality and safety. Risk having the highest risk level in 24 sub-risks is evaluated to be a failure of tightness security of inner containment storing compressed air.

TBM risk management system considering predicted ground condition ahead of tunnel face: methodology development and application (막장전방 예측기법에 근거한 TBM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Park, Jeongjun;Lee, Kang-Hyun;Park, Jinho;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.1-12
    • /
    • 2016
  • When utilizing a Tunnel Boring Machine (TBM) for tunnelling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These include fractured zones or mixed ground conditions that are likely to reduce the stability of TBM excavation, and result in considerable economic losses such as construction delays or increases in costs. Minimizing these potential risks during tunnel construction is therefore a crucial issue in any mechanized tunneling project. This paper proposed the potential risk events that may occur due to risky ground conditions. A resistivity survey is utilized to predict the risky ground conditions ahead of the tunnel face during construction. The potential risk events are then evaluated based on their occurrence probability and impact. A TBM risk management system that can suggest proper solution methods (measures) for potential risk events is also developed. Multi-Criterion Decision Making (MCDM) is utilized to determine the optimal solution method (optimal measure) to handle risk events. Lastly, an actual construction site, at which there was a risk event during Earth Pressure-Balance (EPB) Shield TBM construction, is analyzed to verify the efficacy of the proposed system.

A Study on the Risk Evaluation of Apartment Development Project based on VE (VE기반 공동주택 개발사업 리스크 평가에 관한 연구)

  • Lee, Hyun-Chul;Shin, Seog-Bae;Hong, Ju-Hyun;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.14-25
    • /
    • 2009
  • Development work of apartment houses is a complex medium-and long-term project requiring grand resources and work force. Since in combination inner and outer project variables relate to project output, uncertainties caused by not only a given site condition but also politic, economy and social sectors are generated during the project. These risks influence output of the project as important factors, and ultimately as management variables in priority giving an effect on earnings and the financial structure of enterprises they should be manageable with the risk reduction plan. In this point of view, this study focused on development work of apartment houses among construction project. Risky factors were deduced, analyzed and evaluated based on Value Engineering from planning to designing to executing to maintaining. Eventually, this study showed the foundation guaranteeing competitive power of public and private construction sectors.

Development of a Product Risk Assessment System using Injury Information in Korea Consumer Agency (한국소비자원 위해정보를 활용한 제품 리스크 평가시스템 개발)

  • Suh, Jungdae
    • Journal of Digital Convergence
    • /
    • v.15 no.4
    • /
    • pp.181-190
    • /
    • 2017
  • Recently, safety accidents of daily necessities such as humidifier disinfectant, mobile phones, and infant diapers, have occurred frequently. To protect consumers from these accidents, product safety management is required, and a product risk assessment tool is needed to evaluate the degree of safety of the product. In this paper, we have constructed RAS, which is a system that can evaluate product risk based on injury information of product accident in Korea Consumer Agency. RAS consists of an injury information analysis system for analyzing accident-related information and a risk assessment system for assessing risk using information derived from the system. The Bayesian network - based probabilistic method is applied to reflect the causal relationships that affect product risk in the risk assessment process. We used RAS to evaluate 33 children's products and compared them with the results of EU RAPEX RAG. Subsequent tasks include reducing the subjectivity of the input of the accident impact scale, and linking the above two systems.