• Title/Summary/Keyword: 도입시설

Search Result 1,462, Processing Time 0.029 seconds

Economic Analysis of Dry Bottom Ash Handling System in a Pulverized Coal Thermal Power Plant in Korea (國內 微分炭 火力發電所에서 바닥재 再活用을 위한 乾式 바닥재 處理시스템 導入의 經濟性 分析)

  • Oh, Se-Won
    • Resources Recycling
    • /
    • v.13 no.5
    • /
    • pp.51-56
    • /
    • 2004
  • Economic benefits of the dry bottom ash handling system over the wet bottom ash handling system in a new 500MW${\times}$2units pulverized coal thermal power plant in Korea were evaluated. The higher initial capital cost in the dry bottom ash handling system was estimated. However, this higher initial capital costs would be compensated with reductions of the operating cost mainly due to the recycling of bottom ash. Economic analysis showed that the payback period of 4.9 years and the internal rate of return at 21.1% were expected for the additional initial capital cost of the dry bottom ash handling system.

Problems and Solutions of private university dormitory project with PFI (민간투자사업을 활용한 사립대 기숙사의 문제점 및 개선방안)

  • Kim, Jong-Soo;Song, Nak-Hyun;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.471-474
    • /
    • 2008
  • The range of PFI project has been expanded from Road facilities, Hobor facilities to Education facilities, Military residence facilities since 2005. Especially, The dormitory project that one of the most lucrative facilities among education facilities was progressing but it has many problems with introducing PFI project. This object of research is deriving problems by introducing PFI project and solving problems by consulting with experts. The results of research have had problems that increasing rental fee, difficulty of retrieving the investment and shortage of government supports. The solutions concerning the problems are using organization, introducing various programs and relieving regulation of government. This paper was made by consulting with experts and is expecting to use the basic data when comparing and analyzing the cases used PFI.

  • PDF

Development of BIM based Maintenance Management Prototype System for Wastewater Treatment Plant (BIM 기반 하수처리시설 유지관리 프로토타입 시스템 개발)

  • Um, Dong-Yong;Choi, Jae-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1901-1910
    • /
    • 2014
  • Current domestic and overseas BIM practice and research efforts show very few examples that design and construction BIM data could be successfully used for efficient operation and maintenance (O&M) of infrastructure in particular. This study takes public wastewater treatment plant requiring an enhancement of operation and maintenance capability into account to develop a prototype BIM-based maintenance management system. The system is designed and implemented following a typical system development procedure and validated by the system outputs per four scenarios being considered to be main maintenance activities: The research results are expected to contribute to the upgrade of current wastewater treatment plant maintenance level, which is more demanded as water-related regulation and policy direction changes to region-based large scale O&M and asset management adoption, and overseas market participation.

A Model for Improving Performance Structure of Build-Transfer-Lease in Small Public Educational Facilities (소규모 공공교육 시설 임대형 민자사업(BTL)의 수행구조 개선모델)

  • Kim, Seung-Sup;Jung, Sang-Min;Koo, Choong-Wan;Koo, Kyo-Jin;Hyun, Chang-Taek;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.116-124
    • /
    • 2007
  • It is Increasing that requirements of social infrastructure which includes educational, welfare, cultural facilities for public. Government introduced BTI(Build-Transfer-Lease) as a PFI(Private Financial Initiative) system. This research is about BTL projects in small public educational facilities. Some problems when BTL system is applied to small public educational facilities are identified, and the reason of those problems are examined. This research proposes alternatives in a institutional way and it proposes improvements in contractual structure of consortium when BTL system is applied. Based on reasonable system, it promotes creativeness and effectiveness of a project, and it makes local minor construction companies participate in BTL project without difficulties as mentioned.

A Comparative Analysis of Stakeholder's Interest in Tourist Destination Remodeling (관광지 리모델링 관련 이해관계자 관심 비교분석)

  • Kim, Yu-Min;Lee, Ki-Dong;Kang, Dong-Yoon
    • Journal of Digital Convergence
    • /
    • v.11 no.7
    • /
    • pp.51-57
    • /
    • 2013
  • The purpose of this paper is to find the priority of tourist destination remodeling among tourists, residents, sellers for Incheon's Chinatown. Our questionnaire is included satisfaction of convenience, accommodation and cultural facility and development direction of Incheon's Chinatown for all stakeholder. We also surveyed building control, satisfaction of implemented public service, demand of facility both resident and seller, except for tourist. The results represent each of stakeholder is different opinion about remodeling of Incheon's Chinatown. The tourist importantly considered tourism development. The resident and seller importantly considered historical, cultural development. However, all stakeholder commonly regarded convenience and cultural facility as priority for developing chinatown.

LID 시설 빗물관리목표 설정에 따른 침수저감효과 분석

  • Park, Jongpyo;Kim, Reeho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.422-422
    • /
    • 2017
  • 기후변화로 인한 게릴라성 호우 및 국지성 호우의 증가, 급격한 도시화로 인한 불투수면적의 감소 등은 다양한 홍수피해와 물 순환 왜곡문제 등을 유발하고 있다. 서울시의 경우 2010년 9월 21일 시간 최대 75.5mm의 폭우로 광화문광장 및 백운동천 주변상가에서 약 15.7ha의 침수가 발생하였다. 이러한 침수발생에 대응하기 위한 대안으로 서울시에서는 저영향개발(LID, Low Impact Devleopment)기법을 도입하고 있다. 본 연구에서는 효자배수분구(광화문지역)의 LID 시설 도입을 위한 빗물관리 목표량 설정에 따른 홍수방어 개선효과를 분석하였다. 빗물관리량 산정을 위한 유출해석모형은 도시유출모형인 SWMM을 이용하다. SWMM의 입력자료인 우수관망도 자료는 서울시 우수관망 UIS 자료를 이용하여 구성하였으며 소유역분할은 유역의 경사 및 건물 등을 고려하여 정교하게 소유역을 구분하였다. 구분된 소유역은 293개이며 개별 소유역에 대한 토지이용도, 정밀토양도를 검토하여 소유역별 유출곡선지수 산정하여 모형 입력자료를 구축하였다. 효자배수분구(광화문지역) 전체유역 중 전원지역을 제외한 나머지 지역에 대하여 소배수구역별로 유출곡선지수(CN)값을 10-90%까지 감소시키면서 LID시설의 계획에 의한 빗물관리량(mm)에 따른 침수발생량($m^3$)의 변화를 분석하였다. 여기서, LID 시설의 빗물관리량은 유역의 현상태 직접 유출고에서 CN값 변화에 따라 계산된 직접유출고를 차감한 양이다. 연구결과, 효자배수분구의 경우 도시유역 전체에서 20mm의 우수를 관리하면 전체 침수발생량의 약 50%를 30mm의 우수를 관리하면 유역침수 침수발생량의 약 75%를 저감할 수 있는 것으로 분석되었다. 본 연구결과는 향후 개발된 도시지역에 대한 지구단위계획 수립시 LID 시설목표에 따른 홍수저감 효과를 비교적 효율적인 방법으로 검토하는 방안으로 활용될 수 있을 것으로 기대된다.

  • PDF

A Study on The Improvement of the Leagal Study on Special Fire Safety Inspection System (법과 제도적 관점에서 본 소방특별조사의 개선방안)

  • Lee, Jae Wook;Jeong, Gi Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.3
    • /
    • pp.545-552
    • /
    • 2021
  • Under the Act amended on August 4, 2011, a special fire-fighting investigation was conducted by the relevant person (owner, manager, oil refineries), and the responsibility was also given to the relevant person. Instead of directly entering all existing fire-fighting targets and investigating the maintenance and management status of fire-fighting facilities, the fire-fighting agency selects and visits some targets every year, checks the maintenance and management status of fire-fighting facilities, corrects them, and imposes fines, etc. Reasons for the introduction of the system were the establishment of a private autonomous correction system by strengthening the responsibility of officials, lack of firefighting professionals, possible corruption due to frequent public contact, and responsibility of fire agencies. However, many problems arose even after the introduction of a special fire investigation system. A special fire investigation, one of the fire safety systems, checks whether related public officials and especially fire officials are properly installed, maintained and managed in accordance with relevant laws. Special firefighting investigations were introduced as firefighting inspections at the time the firefighting law was enacted in 1958, and have undergone a revised process more than 30 times until recently. Firefighting Facility Installation, Maintenance and Safety Management Act", the existing firefighting inspection was changed to a special firefighting investigation and accepted. At the time of enactment of the Fire Service Act in 1958, a special firefighting investigation was introduced as a firefighting inspection, and until recently, more than 30 revisions have been made. In 2003, as the existing fire fighting system was divided into four laws, it was approved by changing the existing fire fighting inspection to a special fire fighting investigation in the "Fire Fighting Facility Installation, Maintenance and Safety Management Act".