• Title/Summary/Keyword: 도시철도 노선

Search Result 110, Processing Time 0.024 seconds

The Feasibility Studies for Introducing Bimodal Tram System Based on Urban Scale (신교통 바이모달트램의 도시규모별 도입타당성 분석)

  • Eom, Jin-Ki;Sung, Myoung-Joon;Kim, Hyun-Woong;Lee, Jun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.1067-1075
    • /
    • 2009
  • The Bimodal Tram being developed in Korea is a new transit system that provides both benefits of rail and bus systems in terms of accessibility and fixed time schedule. This study accomplished a feasibility study for introducing the Bimodal Tram system by considering the travel demand and existing transit system at a city level based on its population. The feasibility of Bimodal Tram system varies depending on cities with respect to demographic scale, mode shares, and operational distances. The strategies introduced here will help any cities where transport agencies are trying to introduce the Bimodal Tram as a new transit system.

The Study of Train Management System Combination Test for Korea Tilting Vehicle (한국형 틸팅차량의 열차제어진단장치 조합시험에 관한 연구)

  • Lee, Su-Gil
    • Proceedings of the KIEE Conference
    • /
    • 2006.10d
    • /
    • pp.232-234
    • /
    • 2006
  • 기존노선을 이용한 고속화 신기술 개발사업 과제를 수행하여 중장거리 및 도시간의 교통해소를 위해 중고속 철도차량을 개발하여 최고속도 180km/h의 속도로 운행할 수 있는 차량의 개발에 있어 핵심 전장품인 열차제어진단장치를 국산화하여 수입대처효과 및 기술개발에 기여하고 있다.

  • PDF

A Study on Inaccuracy in Urban Railway Ridership Estimation (도시철도 교통량 추정의 오차발생 요인 연구)

  • Kim, Kang-Soo;Kim, Ki Min
    • Journal of Korean Society of Transportation
    • /
    • v.32 no.6
    • /
    • pp.589-599
    • /
    • 2014
  • This paper analyzes the forecasting errors of traffic volumes by comparing forecasted volumes for the opening year with the observed ones in the years after the urban railway construction in the metropolitan areas. The result shows that the average inaccuracy of traffic volumes for each station was estimated at around 7.27. Based on the confirmed factors of demand estimation errors, this study seeks for an alternative method to reduce estimation errors in feasibility studies. It is noted that there is a tendency that the inaccuracy varies by regions and the longer construction period or the shorter station spacing is, the overestimation increases. If urban railway projects are proceeded as planed, therefore, the level of the inaccuracy for traffic volume forecast will be decreased. In addition, thanks to the theoretical progress, recent estimation results show higher accuracy than before. In that sense, when we introduce the new railway line, it is necessary to make an accurate and realistic demand forecast based on actual outcomes and tendency of the previous estimation. The limitation of our study is that we only cover the errors of the initial period, the opening year and deal with the exogenous variables. Further research including other variables which might be considered to cause overestimation or errors would be needed for increasing the estimation accuracy of traffic volumes.

A Study on the Fatigue Crack Evaluation Method of Railway Bogie Frame (철도차량 대차를 피로균열 평가법 연구)

  • Jun, Hyun-Kyu;Seo, Jung-Won;Lee, Dong-Hyong;Kim, Hyeong-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.16-24
    • /
    • 2009
  • In this study, fatigue crack growth rate of a cracked railway bogie frame under variable amplitude loading is predicted by applying linear elastic fracture mechanics. For this purpose, we find the critical points by reference surveying on cracked railway bogie frames. And we make an effective load history by synthesizing the dynamic load measured from the critical points of railway bogie frame during commercial line operation and the static load calculated from structural analysis. Crack growth analyses are performed at the 3 critical points under the commercial operation loading condition by assuming an initial crack size as 40 mm. and the results are compared with the experimental results from Japanese railway bogie frame crack growth case. From the analysis results, we find that around 500,000 km operating distance is necessary to bring crack growth from the initial crack to unstable crack. And it takes around 3.8 normal operating years. We conclude that it is enough time to detect the crack between normal maintenance period.

An Analysis of the Rail Wear Measurements for the Prediction of Particulate Matter Emission in Urban Railway (도시철도 미세먼지 발생량 예측을 위한 레일 마모량 분석)

  • Yoon, Cheonjoo;Ko, Huigyu;Bang, Myeongseok;Kwon, Hyeokbin
    • Journal of The Korean Society For Urban Railway
    • /
    • v.6 no.4
    • /
    • pp.339-350
    • /
    • 2018
  • The rail wear measurements in urban underground railway have been analyzed to predict the particulate matter emission caused by rail wear which is one of the major sources of particulate matter emission for underground railway systems. From the rail profile variations measured in the interval of one and half year by dedicated rail wear measuring instrument over the commercial urban underground railway line, 'line-s' which is about 45km long, the characteristics as well as the amount of rail wear have been analyzed after dividing the whole line into about 170 section with radius of curve(R). It has been concluded that the vertical wear parameter V0 and corner wear parameter C0 have been selected to represent the wear amount of straight and curved rail respectively. The amount of rail wear as well as the particulate matter emission by rail wear over the whole line normalized by the rail length as well as the number of train has also been deduced from the relationship between the rail wear parameters and the amount of rail cross-section area.

Characteristics of Wind Speed and PM10 Concentration underneath Railway Trains (도시철도 차량 하부의 풍속 및 미세먼지 농도 특징)

  • Kim, Jong Bum;Woo, Sang Hee;Jang, Hong-Ryang;Chou, Jin-Won;Hwang, Moon Se;Park, Hyung-Koo;Yoon, Hwa Hyeon;Jung, Joon-Sig;Bae, Gwi-Nam
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.1
    • /
    • pp.11-19
    • /
    • 2017
  • Since operation of railway trains is a major source of particle pollution in tunnel air, a particle removal device can be an effective measure to remove wear particles. To obtain design conditions of the particle removal device that will be installed underneath the railway trains, the wind speed and particle concentration underneath the trains were investigated using a three-dimensional ultrasonic anemometer and a DustTrak aerosol monitor, respectively. The measurements were made for the trains running on Seoul Metropolitan Subway Line 5 on February 10, 2015. The data were analyzed according to the track geometry (straight, curved) and train speed pattern (acceleration, cruising, and deceleration) between stations. Train speed was also analyzed. The average wind speed and $PM_{10}$ concentration underneath the trains were ~30% of the train speed and ${\sim}200{\mu}g/m^3$ for both straight and curved sections. Average $PM_{10}$ concentration for deceleration sections was higher than that for acceleration sections.

Data Base Design Methods for Railway Facility Information using 3D Spatial (3차원 공간에서의 철도시설정보 데이터베이스 설계방안)

  • Yeon, Sang-Ho
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1003-1009
    • /
    • 2009
  • The Spatial Image contents of Geomorphology 3-D environment is focused by the requirement and importance in the fields such as, national land development plan, telecommunication facility management, railway construction, general construction engineering, Ubiquitous city development, safety and disaster prevention engineering. The currently used DEM system using contour lines, which embodies geographic information based on the 2-D digital maps and facility information has limitation in implementation in reproducing the 3-D spatial city. Moreover, this method often neglects the altitude of the rail way infrastructure which has narrow width and long length. This As the results, We confirmed the solutions of varieties application for railway facilities management using 3-D spatial image contents and database design. Also, I suggested that U-city using railway modeling about matching methods of high density elevation value using 3-D aerial photo with laser data are best approach for detail stereo modeling and simulation.

  • PDF

Link Label-Based Optimal Path Algorithm Considering Station Transfer Penalty - Focusing on A Smart Card Based Railway Network - (역사환승페널티를 고려한 링크표지기반 최적경로탐색 - 교통카드기반 철도네트워크를 중심으로 -)

  • Lee, Mee Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.6
    • /
    • pp.941-947
    • /
    • 2018
  • Station transfers for smart card based railway networks refer to transfer pedestrian movements that occur at the origin and destination nodes rather than at a middle station. To calculate the optimum path for the railway network, a penalty for transfer pedestrian movement must be included in addition to the cost of within-car transit time. However, the existing link label-based path searching method is constructed so that the station transfer penalty between two links is detected. As such, station transfer penalties that appear at the origin and destination stations are not adequately reflected, limiting the effectiveness of the model. A ghost node may be introduced to expand the network, to make up for the station transfer penalty, but has a pitfall in that the link label-based path algorithm will not hold up effectively. This research proposes an optimal path search algorithm to reflect station transfer penalties without resorting to enlargement of the existing network. To achieve this, a method for applying a directline transfer penalty by comparing Ticket Gate ID and the line of the link is proposed.

A study of socio-economic influence of railroad -focusing on some examples- (철도의 사회경제적 영향력에 관한 연구 - 몇 가지 사례를 중심으로 -)

  • Lee, Yong-Sang
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2316-2324
    • /
    • 2008
  • In this paper, I illustrate the some examples of socio-economic influence of railroad in Korea. The Korean railroad has been running for 109 years now since it started operation in 1899. The opening of railroad in Korea has been affecting influence in our society not only transportation but also infrastructure building and the formation of new cities which they were built along the rail network like Daejeon. I have come up with some examples, which railroad has affected the in our society. For example, the changes of transport route from road to railroad, emerging the new cities, industries and culture. This paper contributes to look over the various function of railroad in Korea. Moreover it will be compared with Japan's railroad influence in his country. It gives us a peculiarity and universality in railroad's function including colonial policy

  • PDF

An Investigation of Rider Behavior to Transfer Seoul Metropolitan Transit Using Public Transport Card Data (교통카드 데이터를 이용한 수도권 광역급행철도 환승행태에 관한 연구)

  • Gun ki Jung;Dong min Lee;Sun hoon Kim
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.6
    • /
    • pp.146-164
    • /
    • 2022
  • Recently, the Korean government promoted the construction of metropolitan express subway to connect major transportation hub in the metropolitan area within 30 minutes. Most stations of the metropolitan express subway are connected to existing subway stations, so the importance of transfer increased. Although many studies have been conducted on the effect of transfer penalty on route choice, there are few studies on the transfer behavior of the metropolitan express subway. Therefore, in this study, a transfer behavior analysis was conducted on the Shinbundang Line, a representative metropolitan express subway. To analyze the transfer behavior according to the degree of traffic congestion and the presence of fare payment, route choice models were made using transport card data divided according to week, time, and user characteristics. As a result of the analysis, users of the metropolitan express subway had greater disutility to the transfer waiting time compared to the transfer moving time. Furthermore, especially during the peak time, EIVM(Equivalent in-vehicle minutes) of the transfer waiting time was 3.51. In this study, EIVM for metropolitan express subway users were analyzed to be 2.6 minutes, which is significantly lower than the results of previous studies on subways. This suggests that there is a difference in the transfer penalty between subways and metropolitan express subway, and that it is necessary to apply the transfer penalty between subways and express subway differently when forecasting subway traffic demand.