• Title/Summary/Keyword: 도로 공사구간

Search Result 219, Processing Time 0.02 seconds

Safety Evaluation of Traffic Merging Control Methods for Freeway Work Zone (고속도로 공사구간 차로 합류기법 안전성 평가 연구)

  • HWANG, Dong Hwan;OH, Cheol;PARK, Hyun Jin;JEONG, Bong Jo
    • Journal of Korean Society of Transportation
    • /
    • v.34 no.3
    • /
    • pp.263-277
    • /
    • 2016
  • Traffic safety in freeway work zones is of keen interest since both crash frequency and severity are much higher than those in general freeway sections. The lane closure in work zones results in greater work load of drivers due to compulsory lane changes and speed reduction. Therefore, traffic merging control is an effective countermeasure for enhancing work zone safety. This study proposed an integrated framework based on driving and traffic simulations to evaluate traffic merging control methods in terms of traffic safety. In addition to the conventional merging method using the taper, joint merge and chicane-type merge were evaluated by the proposed methodology. Chicane-type merge outperformed other methods under level of service (LOS) A and B. On the other hand, it was identified that joint merge showed the best safety performance under LOS C traffic conditions.

Effectiveness Analysis of Variable Speed Limit Systems(VSL) in Work Zones based on Meta-analysis (메타분석을 이용한 공사구간 가변속도제한시스템(VSL) 효과분석)

  • Jo, Young;Youn, Seok-min;Oh, Cheol
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.15 no.4
    • /
    • pp.91-103
    • /
    • 2016
  • The work zone traffic management is of keen interest because the unstable traffic stream in work zones leads to not only less productive traffic operational efficiency but also negative impacts on traffic safety. A promising method to address such issues is variable speed limit systems(VSLS). VSLS is expected to increase in throughput and to enhance safety by diminishing the crash potential. In addition, the usefulness of VSLS has been demonstrated by significant amount of existing literature. The objective of this study is to identify the effectiveness of VSLS based on a meta analysis technique. Throughput and travel speed were used as measures of effectiveness for VSLS in terms of the operational efficiency and safety respectively. Results showed that approximately 16.4% increase in throughput and 16.5% decrease in travel speed were obtainable by VSLS. The outcomes of this study would be useful in developing technologies and polices for better operation of VSLS.

Development of Work Zone Traffic Control Algorithm for Two Lane Road (공사구간 교대통행 동적제어 알고리즘 개발)

  • Park, Hyunjin;Oh, Cheol;Moon, JaePil
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.2
    • /
    • pp.23-35
    • /
    • 2017
  • Work zone traffic control is of keen interest because both traffic operations and safety performances are directly affected by traffic management methods. In particular, work zone traffic on two-lane roads needs to be managed in more efficient and safer manners due to its unique characteristics of alternative right-of-way assignment. This study developed a dynamic control algorithm that can be used for real-time operations of two-lane work zone traffic. The performance of the developed algorithm was evaluated by VISSIM microscopic traffic simulator. An applied programming interface (API) based program was developed to plug-in the control algorithm onto the simulator. The results demonstrated the feasibility of the proposed control algorithm for two-lane work zone.

A Study on the Diagnosis and Improvement of the Road Work Zone (도로점용공사장 교통관리방안의 문제점 및 개선방안 (서울시를 중심으로))

  • 김종민;이상용
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.5
    • /
    • pp.119-133
    • /
    • 2003
  • 도로는 교통기능 외에 여러 시설물을 수용할 수 있는 사회 인프라구축의 공간으로 활용될 수 있기 때문에 서울시뿐만 아니라 각 지방자치단체에서는 이러한 공간을 활용하기 위한 도로점용공사는 매년 전국적으로 수만 건에 달하고 있다. 따라서. 매년 발생하는 도로점용공사의 차로과다 점용, 교통시설물 설치 부적절, 보행자 안전무시, 공사안내표지 부적절, 공사구간에서의 불법 주.정차 등의 문제점이 계속하여 발생.지적되고 있으나 이에 따른 관련 규정이 미흡하여 도로점용공사 시행자의 불법을 초래하고 있는 실정이다. 또한 서울시의 경우 시스템적 접근방법인 관련조례에 의해서 수행되기보다는, 교통자문회의로 운영되고 있으며, 관련 인원 및 법적 제재조치가 미약하여 도로점용공사의 효과적인 관리가 어려운 실정이다. 따라서 서울시 및 각 지방자치단체에서는 도로점용공사로 인한 보행자와 운전자의 통행권 확보와 안전상의 문제 등을 하루빨리 인식하여 도로점용공사에 따른 도로공사장 교통관리 규정을 법규화 하여 체계적으로 관리할 필요가 있다. 이에 따라, 본 논문에서는 도로점용공사에 따른 관련법 및 적용대상, 관련보고서 검토, 서울시를 사례로 한 공사중 교통처리방안 운영실태 및 문제점의 진단을 통하여 향후 도로공사장 교통관리 규정의 운영적 및 제도적 측면의 개선방안과 향후 추진방향을 제시하고자 한다.

The Technique of Construction Planning and Management for Widening and pavement of Local Roads (지방도로 확포장공사의 시공계획 및 공사관리 기법연구)

  • Yeon, sang-ho
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2010.05a
    • /
    • pp.635-637
    • /
    • 2010
  • 전국적으로 수년째 계속되고 있는 지방도 확포장 사업의 구간별 시공계획 관리에서 중점적으로 지적되고 있는 도로 및 교량 공사단계별 중점관리 사항과 공정관리 및 신기술도입 등에 관하여 실험적으로 그 적용기법을 연구하였다. 기존의 흐름도와의 관계를 통하여 새로운 대안을 제시하여 최적의 공사계획과 관리가 이루어지도록 하기 위한 기법을 제시하였다.

  • PDF

Capacity Estimation Models for Work-zones Under Traffic Signal Influence and the Empirical Validation (신호영향권 하 도로공사구간에서의 용량산정모형 개발과 실증)

  • Shin, Chi-Hyun
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.1
    • /
    • pp.77-86
    • /
    • 2013
  • This paper focuses on the development of analytical models for estimating the changes in saturation flow rates (SFR) at the stop-lines of a signalized intersection due to the existence of nearby work-zones, and thereby calculating the prevailing capacity values for specific lane groups. Major changes were incorporated in the logics of previous models and significant revisions have been made to secure the accuracy and simplicity. Furthermore, much attention was paid to model validation by making comparisons to both extensive simulation results and empirical data from various sites. It was found that SFRs are highly sensitive to the location of work-zones, the distance to each work-zone from the stop-line of a concerned approach, the number of lanes open and closed, and the effective green time. Using such geometric and operating conditions that constitute work-zone environment, the proposed models successfully estimated SFR values with a miniscule margin of error.

Experimental Study on the Strength of Underground Conduit (통신용 지하매설관의 강도 특성에 관한 연구)

  • Baik Song-Hoon;fang Wang-Kyu;Chung Sung-Tak
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.230-233
    • /
    • 2004
  • 현재 KT의 관로포설 공법은 관 상부 토피 1m를 확보한 상태에서 차량하중이 작용한다는 가정하에서 제정된 것이며, 토피 1m를 확보하지 못하는 구간에는 별도의 보강공법을 적용하고 있다. 그러나 현재 관로공사의 대부분을 차지하는 도로유관공사는 도로 조성이 종료되는 시점에는 토피 1m를 확보하지만, 도로조성 공사기간 중에는 별도의 보강공사 없이 토피 60cm 내외에서 공사 차량의 하중이 관로에 그대로 전달되고 있어 관로의 찌그러짐 현상이 발생하고 있다. 본 논문은 이와 같은 조건에서도 고품질의 관로를 확보하기 위하여 현행 FC관로 뿐만 아니라 지하매설관으로 사용되는 각종 재질의 관에 대한 특성을 검토하였으며 매설관 변형실험을 통하여 도로유관공사에 적합한 관로재질을 제시하였다.

  • PDF

Applications of Improved Low-Flow Mortar Type Grouting Method for Road Safety and Constructability in Dangerous Steep Slopes (급경사지 붕괴 위험지역의 도로 안전 및 시공성을 고려한 개선된 저유동 몰탈형 그라우팅공법 적용성 분석)

  • Choi, Gisung;Kim, Seokhyun;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.4
    • /
    • pp.409-415
    • /
    • 2020
  • Low-flow mortar injection method grouting technology was selected and the traffic area was preserved as much as possible in order to secure safety for road traffic when the outflow and subsidence of landfill occurred due to ground-water, and etc. In particular, the current existing method was newly improved since there are risks of damage such as hydraulic fracturing at the lower part of the road, spilling of soil particles on steep slopes, and bumps on the road due to excessive injection pressure during construction. This study was carried out at the site of reinforcement work on the road as a maintenance work for the danger zone for collapse of the steep slope of the 00 hill, which was ordered from the 00 city 00 province. The improved low-flow mortar type grouting method adopted a new automated grouting management system and especially, it composites the method for grouting conditions decision by high-pressure pre-grouting test and injection technology by AGS-controlled and studied about grouting effect analysis by using new technology. By applying the improved low-flow mortar type grouting method, it was possible to lay the groundwork for road maintenance work such as the prevention of subsidence of old roads, uneven subsidence of buildings and civil engineering structures, and of soil leakage of ground-water spills. Furthermore, the possibility of application on future grouting work not only for just construction that prevents subsidence of old roads but also for various buildings and civil engineering structures such as railroads, subways, bridges, underground structures, and boulder stone and limestone areas was confirmed.

Capacity of Urban Freeway Work Zones (도시 고속도로 공사구간 용량 산정)

  • Lee, Mi Ri;Kim, Do-Gyeong;Kim, Hyo-Seung;Lee, Chungwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1123-1130
    • /
    • 2013
  • This paper aims to estimate work zone base capacity by the number of lanes for urban freeway. To do this, data were collected from the field survey and the database system maintained by traffic control center, and analyzed with four different methods such as the average maximum observation flow rate, headway, regression analysis, and parameter inspection. The work zone base capacity for urban freeway is estimated based on the average maximum observation flow rate and headway method, which are more reliable methods compared to others. The average capacity is 1,650pcphpl when the design speed is 80km/h. The capacity of four lanes one-way work zones was about 1,700pcphpl, while one of 2 lanes one-way work zones was about 1,600pcphpl. The capacity reduction rates for each are 0.15 and 0.2, respectively. The smaller the number of lane is, the more base capacity is reduced. For verification of results, we estimate the capacity by simulation analysis using PARAMICS, and compare with analytical results by a statistical method. This research can be used for efficient and systemic management of work zone in the urban freeway.