• Title/Summary/Keyword: 도로 건설현장

Search Result 607, Processing Time 0.028 seconds

Shear Force Variation of Stiffening Girder caused by Vibration of Stay Cable (사장 케이블 진동에 의한 보강형의 전단력 변화)

  • Kim, Hyeon Kyeom;Hwang, Jae Woong;Lee, Myeong Jae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1A
    • /
    • pp.1-8
    • /
    • 2009
  • Stay cable is easily exposed to vibration induced rainy wind effects. There are some problems for not only unexpected vibration but also well-known vibration. An outbreak of displacement by the said effects brings damages such as over-tension of cables and barriers, fatigue of anchorages and dampers, and additional shear force variation of stiffening girders. This study suggests analytic methodology for dynamic tension variation of cables and shear force variation of stiffening girders. Additionally this study announces with dynamic problems for cable stayed bridge briefly. To realize this subject, we divide restoring force into chord component and normal component and then make up the differential equations which can satisfy physical phenomenon for each component. Finally we apply adequate functions such as sinusoidal and parabola in order to reduce these differential equations. Therefore we can meet with good results through a series of above process. As a remarkable result, CIP recommendations (2002) give inadequate solution with over 10% error. However it gives very good solution if parts of our study are reflected at the said recommendations. The fact means that CIP recommendations (2002) well-known as international standard of stay cables are not even concern about this subject yet. For verification of this study, F.E. analysis using E.C.C. with external forces was fulfilled, and the accuracy and conciseness of this study were shown.

Numerical Investigations of Physical Habitat Changes for Fish induced by the Hydropeaking in the Downstream River of Dam (댐 하류 하천에서 발전방류로 인한 어류 물리서식처 변화 수치모의)

  • Kang, Hyeongsik;Im, Dongkyun;Kim, Kyu-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2B
    • /
    • pp.211-217
    • /
    • 2010
  • This paper presents numerical investigations of the physical habitat changes induced by the hydropeaking in the downstream river of dam. For the two-dimensional ecohydraulic simulations, River2D model is used. Pirami (Zacco platypus) is selected as the target fish for investigating the impact of the hydropeaking. For validation of the model, the water surface elevations are simulated with two different water discharges. The computed results are compared with field data in the literature, and the result shows that the model successfully simulates the water flows. The weight usable area (WUA) of Pirami with the life cycle and the composite suitability index with different water discharges are computed and discussed. The results show that habitat for Pirami appears to be best in the bend region downstream of the dam. The discharge of the maximum WUA for adult Pirami is computed to be about 9 $m^3/s$. Also, the WUA computed in a condition of hydropeaking during seven days are presented. The averaged discharge of the hydropeaking appears to be about 20% larger than the drought flow, but the WUA by the hydropeaking is computed to be 60-100% smaller. This result shows that the hydropeaking reduces quantity of habitat available to fish.

Estimation Method of Resilience Pads Spring Stiffness for Sleeper Floating Tracks based on Track Vibration (궤도 진동기반의 침목플로팅궤도 침목방진패드 스프링강성 추정 기법 연구)

  • Jung-Youl Choi;Sang-Wook Park;Jee-Seung Chung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.6
    • /
    • pp.1057-1063
    • /
    • 2023
  • The urban railway sleeper floating track, the subject of this study, is an anti-vibration track to reduce vibration transmitted to the structure. currently, the replacement cycle of resilience pad for sleeper floating tracks is set and operated based on load. however, most previous studies were conducted on load-based structural safety aspects, such as fatigue life evaluation of sleeper anti-vibration pads and increase in track impact coefficient and track support stiffness due to increase in spring stiffness. therefore, in this study, we measure the vibration acceleration of the ballast for each analysis section and use the results of 7 million fatigue tests to calculate the spring stiffness of the resilience pad for each section. the spring stiffness of the resilience pad calculated for each section was set as the analysis data and the concrete vibration acceleration was derived analytically. the adequacy of analysis modeling was verified as the analyzed concrete bed vibration acceleration for each section was within the field-measured concrete bed vibration acceleration range. using the vibration acceleration curve according to the derived spring stiffness change, the spring stiffness of the resilience pad is estimated from the measured vibration acceleration. therefore, we would like to present a technique that can estimate the spring stiffness of resilience pad of a running track using the vibration acceleration of the measured concrete bed.

Analysis of Micro-Sedimentary Structure Characteristics Using Ultra-High Resolution UAV Imagery: Hwangdo Tidal Flat, South Korea (초고해상도 무인항공기 영상을 이용한 한국 황도 갯벌의 미세 퇴적 구조 특성 분석)

  • Minju Kim;Won-Kyung Baek;Hoi Soo Jung;Joo-Hyung Ryu
    • Korean Journal of Remote Sensing
    • /
    • v.40 no.3
    • /
    • pp.295-305
    • /
    • 2024
  • This study aims to analyze the micro-sedimentary structures of the Hwangdo tidal flats using ultra-high resolution unmanned aerial vehicle (UAV) data. Tidal flats, located in the transitional area between land and sea, constantly change due to tidal activities and provide a unique environment important for understanding sedimentary processes and environmental conditions. Traditional field observation methods are limited in spatial and temporal coverage, and existing satellite imagery does not provide sufficient resolution to study micro-sedimentary structures. To overcome these limitations, high-resolution images of the Hwangdo tidal flats in Chungcheongnam-do were acquired using UAVs. This area has experienced significant changes in its sedimentary environment due to coastal development projects such as sea wall construction. From May 17 to 18, 2022, sediment samples were collected from 91 points during field surveys and 25 in-situ points were intensively analyzed. UAV data with a spatial resolution of approximately 0.9 mm allowed identifying and extracting parameters related to micro-sedimentary structures. For mud cracks, the length of the major axis of the polygons was extracted, and the wavelength and ripple symmetry index were extracted for ripple marks. The results of the study showed that in areas with mud content above 80%, mud cracks formed at an average major axis length of 37.3 cm. In regions with sand content above 60%, ripples with an average wavelength of 8 cm and a ripple symmetry index of 2.0 were formed. This study demonstrated that micro-sedimentary structures of tidal flats can be effectively analyzed using ultra-high resolution UAV data without field surveys. This highlights the potential of UAV technology as an important tool in environmental monitoring and coastal management and shows its usefulness in the study of sedimentary structures. In addition, the results of this study are expected to serve as baseline data for more accurate sedimentary facies classification.

Verticality 3D Monitoring System for the Large Circular Steel Pipe (대형 원형강관 수직도 모니터링을 위한 3D 모니터링 시스템)

  • Koo, Sungmin;Park, Haeyoung;Oh, Myounghak;Baek, Seungjae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.870-877
    • /
    • 2020
  • A suction bucket foundation, especially useful at depths of more than 20m, is a method of construction. The method first places an empty upturned bucket at the target site. Then, the bucket is installed by sucking water or air into it to create negative pressure. For stability, it is crucial to secure the verticality of the bucket. However, inclination by the bucket may occur due to sea-bottom conditions. In general, a repeated intrusion-pulling method is used for securing verticality. However, it takes a long time to complete the job. In this paper, we propose a real-time suction bucket verticality monitoring system. Specifically, the system consists of a sensor unit that collects raw verticality data, a controller that processes the data and wirelessly transmits the information, and a display unit that shows verticality information of a circular steel pipe. The system is implemented using an inclination sensor and an embedded controller. Experimental results show that the proposed system can efficiently measure roll/pitch information with a 0.028% margin of error. Furthermore, we show that the system properly operates in a suction bucket-based model experiment.

Remote Measurements of the Geological Structures, Using Photogrammetric Method (입체사진을 이용한 원거리 면구조 측정)

  • Hwang Sang-Gi
    • The Journal of Engineering Geology
    • /
    • v.15 no.2 s.42
    • /
    • pp.201-212
    • /
    • 2005
  • A photogrammetric camera system and a software have been built for capturing planned stereo images. To evaluate the system,25 planar data from a constructed rock slope were measured using both geological compass and photo system. Comparison of the data groups from both system showed matching relationship that falls within the error range of $5.25\pm4.53$ in strike and $3.18\pm3.17$ in dip angles, when the 2 standard deviation error distributions were considered. To evaluate the errors of the Photo matching and non planarity of the surface, orientations of the same plane were repeatedly measured 20times. These measurements showed error ranges of $8.2\pm3.4$in strike and $6.6\pm3.4$ in dip angle, considering the same error distributions. Measured strikes and dips were compared with the corresponding compass measurements in 5 constructed. slopes to test the system. Stereonet plots showed that the photo system measured data coincided well with the compass measurements. With these evaluations, the photo system can measure the planar structure in inaccessible locations with reliable accuracy at the same time reducing the data gathering period therefore resulting to an efficient geological survey.

Initial Imperfection and Axial Strength of Struts with Octagonal Hollow Section fabricated from HR Plate (열연강판 팔각강관 버팀보의 초기편심과 축방향 압축강도)

  • Jo, Jae Byung
    • Journal of Korean Society of Steel Construction
    • /
    • v.27 no.1
    • /
    • pp.23-30
    • /
    • 2015
  • Developed in this study were Octagonal-hollow-section(OHS) struts, whose compressive strengths against flexural and local buckling is higher than H-shape or rectangular-hollow-section(RHS) struts with the same unit weight. OHS members are also advantageous in handling and storing compared to circular hollow sections(CHS). OHS members were fabricated from HR Plates by cold forming and fillet welding. 5 numbers of 20m long OHS struts were assembled, each of which consist of two 9.6m long OHS member and two end connection elements made of cast iron. The compressive strength of the OHS strut was evaluated by comparing the test results, design codes and FEM analysis each other. Test results show that all of the struts have almost same or larger compressive strength than Korean Road Bridge Design Code(KRBDC) (2012). The initial imperfections can be estimated by using measured strains and are turned out to be less than L/450 for all the struts tested. The results of FEM analysis show that the variation of initial imperfection has less effects on the compressive strength for struts with vertical surcharge than for those with self-weight only, while the strength decreases as the initial imperfection increases. As the result of this study, the allowable initial imperfection for 20m long OHS struts is recommended to be less than L/350 on job sites.

A preliminary study on the use of analytic hierarchy process for selecting a optimum trenchless excavation method (최적의 비개착공법 선정을 위한 계층분석법의 적용에 관한 기초연구)

  • Kang, Tae-Ho;Chang, Soo-Ho;Choi, Soon-Wook;Lee, Chulho;Cho, Jinwoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.685-693
    • /
    • 2015
  • There have been high demands for urban underground structures. However, they should be rapidly constructed while maintaining the functions of adjacent structures and road systems especially in urban areas. In this respect, trenchless excavation methods are considered to very effective in minimizing ground displacements during excavation works. A variety of field conditions such as economic, technical and environmental aspects should be taken into consideration when an optimum trechless excavation method is to be chosen in a given condition. Therefore, this study aims to carry out a fundamental study to select an optimum trenchless excavation method by the decision making technique. Especially, AHP (Analytic Hierarchy Process) which is a kind of a multiple attribute decision making process is adopted to consider the opinions of experts and to derive reliable decision criteria. As a result, the weights of key factors and the most effective trenchless methods for different ground conditions were proposed in this study.

A Plot Scale Experiment to Assess the NPS Reduction for Non-irrigated Cropland (밭 비점오염 저감효과 평가를 위한 포장실험 연구)

  • Park, Tae-Yang;Kim, Sung-Jae;Jang, Jeong-Ryeol;Choi, Kang-Won;Kim, Sang-Min
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.313-313
    • /
    • 2011
  • 오염물질은 배출원의 형태에 따라 점오염물질과 비점오염물질로 구분하고 있고 점오염물질은 생활하수, 산업폐수, 축산폐수, 환경기초시설 방류수 등으로 발생원이 명확하고 수집하여 처리 및 관리가 용이하나 비점오염물질은 배출위치가 명확하지 않으며, 강우 시 일시적으로 대량 배출되는 특징을 가진 농경지, 도로, 대지, 임야 등에서 배출되는 오염물질을 말한다. 우리나라에서 비점오염은 전체 수질오염의 42~67%(2003년)를 차지하는 것으로 나타났고, 2015년에는 전체 수질오염의 65~75%에 이를 것으로 예상되고 있다. 이 중 농업 비점오염원은 총 수질 오염량의 30%이상을 차지할 것으로 추정하고 있으나 이를 저감하기 위한 최적관리방법의 효과검증에 관한 연구는 아직 미미한 상태이다. 이에 본 연구에서는 농경지 중 밭에서 발생하는 비점오염을 저감하기 위한 기법으로 다양한 규모와 형태의 Silt Fence/식생밭두렁/침사구를 설치하여 밭 비점오염에 대한 저감효과를 평가하고 제어대책을 개발하여 최적관리기법을 제시하고 이에 대한 매뉴얼을 개발하기 위한 기초연구를 실시하려 한다. Silt Fence는 주로 건설공사현장에서 홍수유출 발생 시 인접한 하천 및 호소 등으로 유사 및 오염물질이 유입되는 것을 방지하기 위해 임시적으로 설치하는 시설로 합성 직물 필터를 나무나 금속 막대로 연결하여 등고선 방향으로 설치하는 것으로 대상 지역의 토양이 교란되기 전에 그 지역 아래쪽에 설치한다. 식생밭두렁은 밭의 이랑의 길이가 길어질수록 강우 시 빗물이 하단에 이를 때 늘어난 유량과 빠른 유속으로 토양침식이 가중되는데, 이때 30~35m간격으로 식생밭두렁을 설치하게 되면 상부와 하부의 침식정도가 유사한 경향을 보여 식생밭두렁을 설치하지 않은 지역에 비해 토양의 침식정도가 작게 나타나게 된다. 이러한 Silt Fence/식생밭두렁/침사구의 밭 비점오염의 저감효과 평가 및 제어대책 개발을 위한 기초 실험을 수행하기 위해 경상남도 사천시 용현면 선진리 일대에 시험포장을 조성 하였으며, 시험포장내에 6개의 Plot을 만들어 하단부에 포장에서의 유출수의 유량을 측정하기 위해 플룸을 설치하였고 실내실험을 통해 플룸의 수위-유량관계 곡선을 작성하였다. 포장의 토양특성을 판별하기 위해 Plot별로 토양시료를 채취하여 특성을 분석 한 결과 6개 Plot모두 모래함량이 많은 점토질 사질토로 분류되었다. 향후 강우 시 시험포장에서 발생하는 유출수의 수질을 분석하고 Silt Fence/식생밭두렁/침사구의 오염물질 저감효과를 분석하여 제어대책을 개발하게 되면 농업수자원확보를 위한 관리방안 선정을 위한 정책수립에 활용될 수 있으며 비점오염 배출을 최소화시켜 수질의 개선에 기여할 뿐만 아니라 우리나라 농업에 적합한 최적영농관리기술을 개발 할 수 있을 것으로 사료된다.

  • PDF

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.