• Title/Summary/Keyword: 도로 건설현장

Search Result 610, Processing Time 0.024 seconds

Application of Screenings by-product of Crushing Rock in Quarry as Lean Concrete Pavement (산업부산물인 스크리닝스의 활용도 증진을 위한 린콘크리트 적용성 평가)

  • Kang, Min-Soo;Lee, Kyung-Ha;Suh, Young-Chan;Kim, In-Soo
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.6 no.4
    • /
    • pp.75-81
    • /
    • 2012
  • In case of crushing rock to produce materials for lean concrete subbase layer in concrete pavement, natural sand is used for the gradation adjustment of aggregates, and the percentage of natural sand used is 30%~40% of the weight ratio of aggregate mix. The supply of natural sand that is used in lean concrete as a fine aggregate is getting harder due to the current of exhaustion of source, and the cost for the purchase of natural sand is included in the cost of roadway construction. This study, therefore, was conducted in order to resolve the exhaustion of materials and economize in construction expenditure by the application of screenings, which is by-product of crushing rock in quarry, as an alternative to natural sand. As a result of a comparative analysis on the application of screenings and natural sand with typical types of rock that is produced in domestic, which was conducted in the first year, It is found out that the use of screenings as a fine aggregate showed better unconfined compression strength. Verification of actual application of screenings was conducted in the second year, after test construction and follow-up investigation. The compressive strength, compaction density, settlement of screenings applied case was higher than that of natural sand. Thus, it is expected that application of screenings to construction in field will contribute to the cost saving, material recycling and the protection of environment.

  • PDF

A Study on the Analysis of Planning and Management Factors of Finishing Works Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 마감공정의 계획 및 관리요인 분석에 관한 연구 - 초고층 주거건축물 공사 건식벽체공법을 대상으로)

  • Lee, Chi-Joo;Kim, Jae-Joon;Lee, Yoon-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.132-140
    • /
    • 2007
  • There is an increase in interest and investment in high-rise housing as it is perceived to be a new value-added market in the construction industry. In constructing a high-rise housing, the finishing works are executed in accompaniment with many other activities that are progressed repeatedly and spontaneously on each floor. It was reported that the duration of finishing works differs according to the management ability of the executing company and has a significant effect on the entire project duration. We suggest a need to concentrate on important management factors by analyzing the factors affecting the productivity of finishing works based on the site characteristics in high-rise housing. There are various complex productivity-affecting factors including the technical factors involved in planning and managing the processes of finishing works. From the viewpoint of planning and management factors, the importance of productivity-affecting factors was analyzed using the Analytic Hierarchy Process (AHP). A continuous examination of the management of high-importance factors will make it possible to improve productivity by enhancing the understanding of productivity-affecting factors of finishing works and suggesting a practical management direction.

Extraction of Agricultural Land Use and Crop Growth Information using KOMPSAT-3 Resolution Satellite Image (KOMPSAT-3급 위성영상을 이용한 농업 토지이용 및 작물 생육정보 추출)

  • Lee, Mi-Seon;Kim, Seong-Joon;Shin, Hyoung-Sub;Park, Jin-Ki;Park, Jong-Hwa
    • Korean Journal of Remote Sensing
    • /
    • v.25 no.5
    • /
    • pp.411-421
    • /
    • 2009
  • This study refers to develop a semi-automatic extraction of agricultural land use and vegetation information using high resolution satellite images. Data of IKONOS-2 satellite images (May 25 of 2001, December 25 of 2001, and October 23 of 2003), QuickBird-2 satellite images (May 1 of 2006 and November 17 of 2004) and KOMPSAT-2 satellite image (September 17 of 2007) which resemble with the spatial resolution and spectral characteristics of KOMPSAT-3 were used. The precise agricultural land use classification was tried using ISODATA unsupervised classification technique, and the result was compared with on-screen digitizing land use accompanying with field investigation. For the extraction of crop growth information, three crops of paddy, com and red pepper were selected, and the spectral characteristics were collected during each growing period using ground spectroradiometer. The vegetation indices viz. RVI, NDVI, ARVI, and SAVI for the crops were evaluated. The evaluation process was developed using the ERDAS IMAGINE Spatial Modeler Tool.

Development of Task Planning System for Intelligent Excavating System Applying Heuristics (휴리스틱스(Heuristics)를 활용한 지능형 굴삭 시스템의 Task Planning System 개발)

  • Lee, Seung-Soo;Kim, Jeong-Hwan;Kang, Sang-Hyeok;Seo, Jong-Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.859-869
    • /
    • 2008
  • These days, almost every industry's production line has become automatic and this phenomenon brought a lot of benefits such as increase in productivity and economical effect, assurance in industrial safety, better quality and compatibility. However, unlike industrial production line, in construction industry, automation has number of barriers like uncertainty incidents and intellectual judgment to make ability to make solution out of it. Therefore construction industry is still demanding use of construction machine through labor. Due to this matter operational labor in construction industry is aging and fading. To solve these problem, in developed nations like Europe, US or Japan are keep researching for the automation in construction and road pavement, strengthening and some other simple operations have been worked through automation but in civil engineering site, automation research is still low despite of its importance in constructional site. For automating civil engineering operation, effective operational plan have to be set by analyzing ground information acquainted. If skillful worker apply heuristics, trial & error can be reduced with increased safety and the effective work plan can be established. Hence, this research will introduce Intellectual Task Planning System for Intelligent Excavating System's effective work plan and heuristics applied in each steps.

Establishment of Measurement Standards for Productivity Assessment in Construction Project (건설 프로젝트 생산성 평가를 위한 측정 기준 수립)

  • Kim, Junyoung;Yoon, Inseok;Jung, Minhyuk;Joo, Seonu;Park, Seungeun;Hong, Yeungmin;Cho, Jongwoo;Park, Moonseo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.3-12
    • /
    • 2022
  • In general construction project planning ratio of manpower and quantity of outputs produced, such as the construction estimate standard, is used as the criterion for labor productivity. This method is highly effective in construction projects with repetitive work, however, there is a limit to apply in large-scale projects with high complexity. This is because the influence of non-work time caused by various work interruption factors that act complexly on the productivity of the project is greater than the average labor productivity derived from the performance data of the project. Therefore, this study proposes a productivity measurement method that can evaluate the characteristics of construction works and the cause of non-working time. To this end, first, detailed work processes and their non-work factors for each work type are defined, and the Adv-FMR technique is developed for quantitatively measuring them. Next, based on the concept of obtainable productivity, methods for comparative productivity analysis by work type, evaluating non-work factors, and deriving productivity improvement methods are proposed. Finally, a case study is conducted to validate that the analysis results based on Adv-FMR data can support the decision-making of construction managers on productivity management.

Effect of Replacement of 5~13mm Recycled Coarse Aggregates on Field Applicability of the Concrete through Mock-up Test (목업 시험을 통한 5~13mm 순환 굵은골재 치환 사용이 콘크리트의 현장적용성에 미치는 영향 고찰)

  • Han, Min-Cheol;Song, Young-Woo
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.1
    • /
    • pp.59-67
    • /
    • 2017
  • The objective of this paper is to investigate experimentally the effect of replacement of recycled coarse aggregates with 5~13mm in size on a field applicability of concretes through Mock-up test. Seven different mock-up specimens were prepared with the size of $1200{\times}800{\times}800mm$ simulating column and wall. For the concrete mixtures, 24MPa, 27MPa and 40MPa of nominal strength were adopted with 30% and 70%(only for 24MPa) of 5~13mm recycled coarse aggregate (RCA) replacement and without 5~13mm RCA(Plain). For test items, slump, slump flow, compressive strength with different curing conditions, core drilling, rebound numbers and drying shrinkage were measured. Test results indicated that 30% of 5~13 mm RCA replacement resulted in increase in slump, slump flow and resistance against segregation, while air contents decreased compared to those of plain mixture. Compressive strength of concrete with 30% of 5~13mm RCA was shown to be higher than that of plain mixture due to optimum packing effect associated with presence of well graded aggregates. Rebound number of the mock-up specimen with 30% of 5~13mm RCA had lower fluctuation according to hitting location than that of plain mock-up specimen. It is believed from the results of the study that replacement of 30% of 5~13mm RCA brings desirable improvement in various aspect of concrete performance due to associated dense packing effect.

Development of block-type sidewalk pavement system using snow-melting system (융설시스템을 이용한 조립식 보도포장 기술 개발)

  • Park, Kyungmo;Lee, Jeonguk;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.136-143
    • /
    • 2015
  • Snow-melting system has been applied not only to roads for car traffic but also to pavement for the pedestrians safety reason in some of the developed countries such as USA and Canada based on countermeasures against Natural Disasters Act revised in 2000. Even though this system was introduced in korea in 2006 and has been partly applied to car traffic roads, there is few places that the system has been applied. Therefore, in this research a snow-melting system with a block-type to cover a pavement that efficiently transfers heat form heat rays to the top of a pavement and protects the heat rays. A quality check showed that compression and bending strength was improved approximately 5 times stronger and 7 to 10 times more absorption rate than the KS(Korea Industrial Standard) requirement. Moreover, only 10 minute was required to increase temperature above zero with a block-type snow-melting system whereas approximately 180 minute was spent with the existing system. This research is expected to contribute to environmental issues and reduce accidents on a slippery road.

A study on the Feasibility Analysis factor Model for Housing Development Projects (주택개발사업의 사업성분석인자 모델에 관한 연구;사업성 분석인자의 중요도 분석 및 타당성 검증을 증심으로)

  • Hong, Yeong-Geon;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.249-254
    • /
    • 2007
  • The main bodies of housing markets of today need to carry out a systematic and objective feasibility analysis even from the step of planning in order to succeed in a diverse and complex market environment. Therefore, it is meaningful to understand this housing market environment and propose a necessary model for the feasibility analysis of hosing business. In this vein, the aim of this study was to extract an actual and practical feasibility analysis factor and its importance for housing market, and then present and apply a feasibility analysis factor model to an on-site example, in order to verify the model's validity. For this, the investigator interviewed with and carried out a questionnaire survey of experts in housing development projects. Study findings are as follows:First, the feasibility analysis factor, derived in this study, could provide a ground to evaluate the feasibility of subject projects in the planning of development through an analysis index. Second, when feasibility is under the level of carrying out the projects, it is possible to reexamine the projects through extracting analysis factors of which points are under the standard and via a feedback process for improvable analysis factors. Therefore, the result of applying the feasibility analysis model of this study to actual housing development projects analytically shows that the model could provide a practical evaluation criterion to the person in charge of project development through an analysis index.

  • PDF

Field Application of High Strength Concrete by Cement Types Using Maturity (적산온도를 이용한 시멘트 종류별 고강도 콘크리트의 현장 적용성)

  • Kim, Dong Baek
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.3
    • /
    • pp.472-478
    • /
    • 2020
  • Purpose: The purpose of the study is to help economic and safe construction by accurately predicting the initial strength of high-strength concrete (70MPa) for each type of cement, securing reliability of concrete quality, and drawing accurately the timing of form deformed, tensioning time of PS concrete, and openning of traffic after road repair with maturity. Method: Calculate the maturity by measuring the hydration heat with cement type for each age, and measure the strength of concrete with age to predict the strength corresponding to the any maturity. Result: In estimating the time required for traffic opening in road repair, ASTM C1074 was theoretically estimated at 16.4 hours for high-strength concrete, but in this study, maturity was calculated at 307, 14.4 hours for OPC and maturity at 2700, 34 hours for LHPC and maturity 200, 8 hours for ESPC. Conclusion: The timing of form deformed of structures using high-strength concrete and the opening of traffic of road repair may be much faster than in the case of concrete using OPC below the design basis strength 40MPa applied by ACI Committee 347.

A Study for the factors affecting to the life of Asphalt Overlay on Aged Cement Concrete Pavement (노후화 된 시멘트 콘크리트 포장의 아스팔트 덧씌우기 포장 수명에 미치는 영향인자에 관한 연구)

  • Son, Hyeon-Jang;Askhat, Turgynbekuly;Kim, Young-Kyu;Lee, Seung-Woo
    • International Journal of Highway Engineering
    • /
    • v.13 no.1
    • /
    • pp.207-221
    • /
    • 2011
  • More than sixty percentage of highway in South Korea were constructed by concrete pavements and more than half of the concrete pavements were twenty years or older. The most of highway have difficulty in providing detour due to the traffic and road condition of South Korea. So far, asphalt concrete has been used for the overlay of aged cement concrete pavement. However, the frequent early damage and maintenance of typical asphalt overlay due to repetitive maintenance causes inconvenience of road users and expensive costs. It is necessary to investigate the factors affecting the performance of asphalt concrete overlay to improve the performance of asphalt overlay. However, the performance data of asphalt concrete overlay in South Korea does not exist. In this research, to investigate on the factors affecting the life of asphalt concrete overlay was attempted based on statistical analysis of the performance data of asphalt concrete overlay included in LTPP (Long-Term Pavement Performance) Database of U.S.A.