• Title/Summary/Keyword: 도로 건설현장

Search Result 610, Processing Time 0.031 seconds

An Analysis of The Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project (초고층 프로젝트 양중 계획의 실패 유형별 핵심 리스크 요인 분석)

  • Kim, Nam-Gyun;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.73-83
    • /
    • 2013
  • Recently, not only around Korea but also other countries shows a pattern of arising high-rise building construction project which was delayed or aborted during global economic crises and recession. Although the market starts to stretch, It is getting competitive to win a contract in high-rise construction project between contractors due to lack of competitive advantage especially to Korea contractors. To get that, Korean contractors needs lifting equipment plan. But currently, they depend on the empirical methods and that cause schedule delay, not controlled cost management problem. Therefore, this research is to improve the accuracy of Lifting plan by analyzing the current issues of Lifting plan system and deducing the types of failures with planning factors, as well as analyzing the impact on schedule and cost control and safety management by each failure mode. Also, by analyzing detail risk factors per Lifting Equipment with FMEA, to infer the critical risk factor on high-rise construction project.

Analysis of Construction Safety Planning Tasks for Performance Improvement Using Importance Performance Analysis (IPA) Method (안전관리자 계획단계 업무 도출을 통한 난이도 및 예방효과 분석)

  • Kang, Sang Hun;Huh, Young-Ki;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.545-554
    • /
    • 2020
  • As recent safety accidents at construction sites can lead to serious accidents that threaten the lives of workers, the role of safety managers in charge of safety management has emerged. However, the current construction safety management system requires the improvement and simplification of the work contents due to the excessive workload and inefficient safety tasks of each person. In this respect, the main purpose of this study is to reduce the occurrence of construction safety accidents by deriving correlations using 2×2 Matrix analysis techniques through expert opinion, simplifying unnecessary tasks and identifying areas requiring improvement. Therefore, if this research reduces inefficient safety manager work and reduces job stress caused by excessive simple document work, thereby efficiently reorganizing safety manager's work to prevent blind spots of hazards and risks, it will ultimately have a great effect on preventing safety accidents at construction sites.

Evaluation of Proper Level of the Longitudinal Prestress for the Precast Deck of Railway Bridges Considering the Temperature Change (철도교용 프리케스트 바닥판의 온도변화를 고려한 적정한 종방향 프리스트레스 수준의 산정)

  • Jeon, Se Jin;Kim, Young Jin;Kim, Seong Woon;Kim, Cheol Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.499-509
    • /
    • 2006
  • Precast concrete deck has many advantages comparing with the in-situ concrete deck, and has been successfully applied to replacement of the deteriorated decks and to the newly constructed highway bridges in domestic region. In order to apply the precast decks into the railway bridges, however, differences of the load characteristics between the highway and the railway should be properly taken into account including the train load, longitudinal force of the continuous welded rail, acceleration or braking force, temperature change and shrinkage. Proper level of the longitudinal prestress of the tendons that can ensure integrity of the transverse joints in the deck system is of a primary importance. To this aim, the longitudinal tensile stresses induced by the design loads are derived using three-dimensional finite element analyses for the frequently adopted PSC composite girder railway bridge. The effect of the temperature change is also investigated considering the design codes and theoretical equations in an in-depth manner. The estimated proper prestress level to counteract those tensile stresses is above 2.4 MPa, which is similar to the case of the highway bridges.

A Numerical Analysis Study for Estimation of Ultimate Bearing Capacity and An Analysis of the High Capacity Bi-directional Pile Load Tests of the Large-diameter Drilled Shafts (대구경 현장타설말뚝의 대용량 양방향 말뚝재하시험 분석 및 극한지지력 추정을 위한 수치해석 연구)

  • Nam, Moonsuk;Kim, Sangil;Hong, Seokwoo;Hwang, Seongchun;Choi, Yongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.10
    • /
    • pp.63-72
    • /
    • 2011
  • The high capacity bi-directional pile load test is an optimum pile load test method for high-rised buildings. Especially, a high pressure and double-acting bi-directional pile load testing, a special type of the high capacity bi-directional pile load test, is the most practical way to overcome limitations of loading capacities and constraints of field conditions, which was judged to be a very useful test method for requiring high loading capacities. Total of 2 high capacity bi-directional pile load tests(P-1 and P-2) were conducted in high-rised building sites in Korea. Based on the field load test results, the sufficiency ratio of loading capacities to design loads for P-1 and P-2 were 3.3 and 2.1, respectively. For P-2, the load test could not verify the design load if 1-directional loads applied slightly smaller than the actual applied load. Also, high capacity bi-directional pile load tests were difficult to determine an ultimate state of ground or piles, although the loads were applied until their maximum loads. Hence, finite element analyses were conducted to determine their ultimate states by calibrating and extrapolate with test results.

Rock Bolt Integrity Assessment in Time-Frequency Domain : In-situ Application at Hard Rock Site (유도파를 이용한 시간-주파수 영역 해석을 통한 록볼트 건전도 실험의 경암지반 현장 적용성 평가)

  • Lee, In-Mo;Han, Shin-In;Min, Bok-Ki;Lee, Jong-Sub
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.12
    • /
    • pp.5-12
    • /
    • 2009
  • As rock bolts become one of the main support systems in tunnels and underground structures, the integrity of the rock bolts affects the safety of these structures. The purpose of this study is the evaluation of rock bolt integrity using wavelet transforms of the guided ultrasonic waves by using transmission test in the field. After several rock bolts with various defect ratios are embedded into a large scale concrete block and rock mass, guided waves are generated by a piezo disk element and measured by an acoustic emission (AE) sensor. The captured signals are analyzed in the time-frequency domain using the wavelet transform based on a Gabor wavelet. Peak values in the time-frequency domain represent the interval of travel time of each echo. The energy velocities of the guided waves increase with an increase in the defect ratio. The suitable curing time for the evergy velocity analysis is proposed by the laboratory test, and in-situ tests are performed in two tunnelling sites to verify the applicability of rock bolt integrity tests performed after proposed curing time. This study proves that time-frequency domain analysis is an effective tool for the evaluation of the rock bolt integrity.

A Study on Monitoring Surface Displacement Using SAR Data from Satellite to Aid Underground Construction in Urban Areas (위성 SAR 자료를 활용한 도심지 지하 교통 인프라 건설에 따른 지표 변위 모니터링 적용성 연구)

  • Woo-Seok Kim;Sung-Pil Hwang;Wan-Kyu Yoo;Norikazu Shimizu;Chang-Yong Kim
    • The Journal of Engineering Geology
    • /
    • v.34 no.1
    • /
    • pp.39-49
    • /
    • 2024
  • The construction of underground infrastructure is garnering growing increasing research attention owing to population concentration and infrastructure overcrowding in urban areas. An important associated task is establishing a monitoring system to evaluate stability during infrastructure construction and operation, which relies on developing techniques for ground investigation that can evaluate ground stability, verify design validity, predict risk, facilitate safe operation management, and reduce construction costs. The method proposed here uses satellite imaging in a cost-effective and accurate ground investigation technique that can be applied over a wide area during the construction and operation of infrastructure. In this study, analysis was performed using Synthetic Aperture Radar (SAR) data with the time-series radar interferometric technique to observe surface displacement during the construction of urban underground roads. As a result, it was confirmed that continuous surface displacement was occurring at some locations. In the future, comparing and analyzing on-site measurement data with the points of interest would aid in confirming whether displacement occurs due to tunnel excavation and assist in estimating the extent of excavation impact zones.

Development of A Quantitative Risk Assessment Model by BIM-based Risk Factor Extraction - Focusing on Falling Accidents - (BIM 기반 위험요소 도출을 통한 정량적 위험성 평가 모델 개발 - 떨어짐 사고를 중심으로 -)

  • Go, Huijea;Hyun, Jihun;Lee, Juhee;Ahn, Joseph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.15-25
    • /
    • 2022
  • As the incidence and mortality of serious disasters in the construction industry are the highest, various efforts are being made in Korea to reduce them. Among them, risk assessment is used as data for disaster reduction measures and evaluation of risk factors at the construction stage. However, the existing risk assessment involves the subjectivity of the performer and is vulnerable to the domestic construction site. This study established a DB classification system for risk assessment with the aim of early identification and pre-removal of risks by quantitatively deriving risk factors using BIM in the risk assessment field and presents a methodology for risk assessment using BIM. Through this, prior removal of risks increases the safety of construction workers and reduces additional costs in the field of safety management. In addition, since it can be applied to new construction methods, it improves the understanding of project participants and becomes a tool for communication. This study proposes a framework for deriving quantitative risks based on BIM, and will be used as a base technology in the field of risk assessment using BIM in the future.

A Study on the Performance of Recycled Asphalt Pavement using Hot Recycling Plant (재생 아스팔트 포장의 공용성능 연구)

  • Kim, In-Soo;Suh, Young-Chan
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.6 no.2
    • /
    • pp.112-118
    • /
    • 2011
  • The recycled asphalt concrete has gotten increasing attention due to the environmental issues. The volume of reclaimed asphalt has increased significantly for last few years because of city remodeling, pavement maintenance, utility excavation, and road widening. Considering the value of reclaimed asphalt, it is rather used for the recycled asphalt concrete than it is used for fill and cover up material instead of soil. This research will be a supplements incomplete issues from existing research results and suggests the quality control guideline for recycled asphalt concrete and upcoming laws. As the first step of research, the trial construction of RAP(Recycled Asphalt Pavement) performed in expressway construction sites. These trial construction sites have been checked every years. And another construction sites studied and selected for more deeper performance check of RAP. For this checks, we used automatic pavement survey equipment and computerized analysis tools. Also, DSR(Dynamic Shear Rheometer) was used for the fatigue life calculation of binder blends(RAP and virgin binder). As a consequence of this research, the application of recycled asphalt provides good enough quality for highway construction. The preceeding literatures reviewed shows that the asphalt rejuvenator are used in many countries but that type of chemical agent are not used in Korea. By using the data of trial construction and mix design in Chongwon-Sangju construction lane, the surface and base courses consisted with the 10% and 30% rap mix asphalt section maintains good performance for up to 7 years. Through the performance check and laboratory tests(DSR), the quality control and mixture's low temperature prevention are the important factor and chemical agent necessary for increasing the fatigue life of RAP binder.

  • PDF

Verification of the HWAW (Harmonic Wavelet Analysis of Waves) Method Using Multi Layered Model Testing Site (실대형 모형부지를 이용한 HWAW(Harmonic Wavelet Analysis of Waves) 기법의 검증)

  • Kim, Jong-Tae;Park, Hyong-Choon;Kim, Dong-Soo;Bang, Eun-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.4
    • /
    • pp.33-46
    • /
    • 2007
  • HWAW (Harmonic Wavelet Analysis of Wave) method, which is non-destructive method using body and surface waves, has the advantages of obtaining 2D subsurface imaging because it uses a short receiver spacing to obtain the $V_s$ profile of whole depth. Even though the reliability of HWAW method has already been verified by using the numerical simulation in the various layered models, it is very difficult to evaluate the reliability of HWAW in the field because the exact $V_s$ values of the experimental site are unknown. In this study, a model testing site where the material properties and layer information could be controlled was constructed to verify the reliability of HWAW method. The detailed geometry of the testing site was strictly measured by surveying, and 140 vertical and horizontal geophones were established at the boundary of each layer to evaluate the dynamic material properties. Using the interval travel times between the upper and lower geophones, the body wave velocities of each layer were 2 dimensionally obtained as reference data, and comparative study using HWAW method was performed. By comparing 2D Vs profile obtained by HWAW method to the reference data, the reliability of HWAW method was verified.

A Study on the Data Organization of Specification Information for reference of Design Information (설계정보 참조를 위한 시방정보의 자료구조화에 관한 연구)

  • Kim Jae-hyun;Song Younk-Kyou;Kim Uk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.92-100
    • /
    • 2001
  • The architectural drawing, construction project specification, etc. are included in the contract of a documents. However, construction project specification, for being documentation, is not utilized to such an extent. The reason is that specification information is difficult in collecting information in relation to the architectural drawing, material finishing list and other architectural information. Therefore, an integrated model, which can be associated with other architectural information, is needed, and a DB based on this integrated model must be established in order for it to be utilized in design, construction, and management. The DB, which is established through this process, must be updated according to modification in design, and construction. Furthermore the specification must be in document on the web for reference. Consequently in this research, the structure of integrated model has been introduced, and it has made the search and preparation of the integrated model on the Internet, using the specification information DB established for the mutual reference of DB, possible. The improvements of construction project specification standards are expected by this system. Also, it will bring about Improvements upon claim prevention, and design, construction, management qualities. Furthermore, it will make the use of information more convenient in practical business such as order agency, design service and building site.

  • PDF