• Title/Summary/Keyword: 도로 건설현장

Search Result 610, Processing Time 0.034 seconds

Research of MEMS INS Based 3D Positioning Technologies for Workers in Construction Field (MEMS INS 기반 건설현장작업자의 3D 위치결정기법에 관한 연구)

  • Jang, Yonggu;Kim, Hyunsoo;Do, Seungbok;Jeon, Heungsoo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.3
    • /
    • pp.51-60
    • /
    • 2013
  • It is proposed the new method to calculate the absolute altitude and horizontal position of worker in construction field. For this research, we used a pressure sensor, MEMS INS sensor to acquire 3D position of worker. The easiest way to show the result of this research is to use smart phone which equipped various digital sensors in this hardware. So we made two softwares: Data acquisition software in Android smart phone and Data monitoring software in PC. During this research, we encountered several kind of problems which have to be overcame. This paper shows these processes and the results of 3D positioning technologies we suggested newly.

Formal Estimation Method for Optimal Budget Appropriation of Highway Construction Projects under Long-term Continuation Contracts (장기계속계약제도 하에서 고속도로공사 최적공사비 산출방안 정립에 관한 연구)

  • Koo, Bon-Sang;Yu, Jung-Ho;Park, Jong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1405-1412
    • /
    • 2015
  • In Korea, public infrastructure projects employ "long term continuation (LTC) contracts," which require budgets to be reevaluated and re-appropriated annually throughout the multi-year life of the project. However, such contracts also make it susceptible to frequently changing government policies, in which budgets required for existing projects are allocated to new projects and thus does not provide a consistent stream of capital to multi-year projects. Each year, the KEC needs to attain government funds for construction of its multiple highway construction sites. Because it is difficult to know the amount that may be actually appropriated to KEC in a given year, it is in turn difficult to anticipate and provide sufficient funds necessary for construction to run smoothly and continuously. The lack of a good logic for appropriation has resulted in projects having a skewed distribution of capital. To get better budget appropriations from the central government, the KEC first needs a systemized approach that rationalizes the annual construction capital optimally required for its individual sites. The goal of this research was to devise a way that allows the KEC to determine and calculate the optimal construction costs that would be required for its individual construction sites on an annual basis. Both the optimal progress rate and the essential work types were assessed through a workshop with 24 professionals (KEC employees and contractors) who had extensive experience in KEC projects and also were currently working in these projects.

Height Determination Using Vanishing Points of a Single Camera for Monitoring of Construction Site (건설현장 모니터링을 위한 단안 카메라 기반의 소실점을 이용한 높이 결정)

  • Choi, In-Ha;So, Hyeong-Yoon;Kim, Eui-Myoung
    • Journal of Cadastre & Land InformatiX
    • /
    • v.51 no.2
    • /
    • pp.73-82
    • /
    • 2021
  • According to the government's announcement of the safety management enhancement policy for small and medium-sized private construction sites, the subject of mandatory CCTV installation has been expanded from large construction sites to small and medium-sized construction sites. However, since the existing CCTV at construction sites has been used for simple control for safety management, so research is needed for monitoring of construction sites. Therefore, in this study, three vanishing points were calculated based on a single image taken with a monocular camera, and then a camera matrix containing interior orientation parameters information was determined. And the accuracy was verified by calculating the height of the target object from the height of the reference object. Through height determination experiments using vanishing points based on a monocular camera, it was possible to determine the height of target objects only with a single image without separately surveying of ground control points. As a result of the accuracy evaluation, the root mean square error was ±0.161m. Therefore, it is determined that the progress of construction work at the construction sites can be monitored through the single image taken using the single camera.

Analysis of the Technology Adoption Impact Factors for Automated Construction Equipment (건설 자동화 장비 도입을 위한 기술도입 영향요인 분석)

  • Lee, Chijoo;Lee, Ghang;Sim, Jaekyang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.56-64
    • /
    • 2013
  • New construction technologies, especially automated equipment, are rarely deployed on a construction site where many accidents and claims occur. This study analyzed and derived impact factors for technology adoption to improve the chance of adopting automated construction equipment to the field. First, impact factors were classified into functional and non-functional factors. Then the functional factors were divided into usability and functionality factors, and the non-functional factors into cost, construction property, and organization factors. Next, the importance and realization possibility of each impact factor were analyzed through a survey with experts. Usability and functionality were analyzed to have the highest importance and realization possibility. Lastly, the differences between construction companies and equipment development companies in the importance and realization possibility of each factor were analyzed. Construction companies recognized previous relationship, operator's attitude, members' will, and construction quality more important than equipment development companies.. The equipment development companies should consider these differences between the view of construction companies and that of equipment development companies on the impact factors. The result of this study can be used as a basis for evaluating for automated construction equipment in the preliminary development phase.

Study under productivity measurement and verification of the underground temporary material installation work by simulation technique (시뮬레이션을 활용한 지하가설물 설치작업의 생산성 측정 및 검증에 관한 연구)

  • Bae Yeon-Jin;Park Sang-Hyuk;Han Seung-Heon;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.427-432
    • /
    • 2004
  • As it is keen competition of a construction market and the recognition that increases construction productivity for maintaining competitiveness, it is increased importance of an interest about productivity and efficiency in the construction industry. This study measures productivity through the instance of investigation that the existing productivity measurement method was utilized and presented a work improvement matter based on the measured contents. The proposed improvement matter is verified through a simulation technique. The purpose of this paper is for a field supervisor to have presented the way that a selection does the most suitable work method to be suitable for a situation, and can forecast production, though a simulation technique is not the most alternative that considered field condition in analyzing productivity measurement.

  • PDF

Applicability Evaluation of Mobile Mapping System for Road Construction Surveying (도로 시공측량을 위한 모바일맵핑시스템의 적용성 평가)

  • Park, Joon Kyu;Lee, Keun Wang
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.3
    • /
    • pp.169-175
    • /
    • 2022
  • Korea's construction industry has a shortage and aging of construction manpower, low productivity compared to other industries, and a high rate of industrial accidents. The Ministry of Land, Infrastructure and Transport is preparing for the 4th industrial revolution and is expanding investment in construction automation and innovative growth engines to improve productivity in the construction industry. In order for new technologies to be utilized in the road construction field, the accuracy of the technologies and the applicability of each type of work must be evaluated. In this study, the accuracy of the mobile mapping system was tried to verify based on the relevant work regulations, and to suggest the applicability of the mobile mapping system to high-speed driving tracks through data acquisition and analysis on road construction sites. The accuracy of the equipment used in the study was verified in accordance with the relevant work regulations, and the possibility of applying the mobile mapping system used for the study to road construction surveying was presented with a maximum error of less than 10cm in the horizontal and vertical directions. In addition, the possibility of utilizing the road construction survey using the mobile mapping system was presented through comparison with the existing method for data acquisition time for construction surveying, production of construction status survey results, and calculation of heatmap and earthworks. In the future, the use of construction status surveying of the mobile mapping system will greatly improve the efficiency of construction work.

The Freezing Characteristics of Pavement Layer Using the Field Road Model Test (현장도로 모형실험을 이용한 포장구성층의 동결 특성 분석)

  • Shin, Eun-Chul;Ryu, Byung-Hyun;Park, Jeong-Jun
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.7
    • /
    • pp.71-80
    • /
    • 2010
  • Korea is considered to be a seasonal frozen soil area that thaws in the spring, and freezes in winter. In the current design codes for anti-freezing layer, the thickness of anti-freezing layer is calculated by the depth frozen due to the temperature condition. Therefore, there is a tendency of over-design and applying uniform thickness without the consideration of thermal stability, bearing capacity and frost susceptibility of materials. So, it is essential to study the structural appropriateness of pavement layer and bearing capacity besides the seasonal and mechanical properties of pavement materials to take an appropriate and reasonable design of the road structure. In this paper, the evaluation of frost susceptibility on subgrade, ant-freezing layer, subbase was conducted by means of the mechanical characteristics and model experiment. The temperature, heaving amount, unfrozen water contents and freezing depth of soil samples, the subgrade, anti-freezing layer, subbase soils of road construction site were measured to determine the frost susceptibility.

Basic research for Developing VR-based Risk Management System for Railway Construction Project (철도시설공사의 가상건설기반 위험관리체계 구축 기초연구)

  • Kang, Leen-Seok;Jo, Su-Ik;Lee, Myung-Seok;Park, Jin-Jung
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.560-564
    • /
    • 2009
  • 절도시설과 같은 광역지역 공사 현장에서는 다양한 요인을 갖는 공종별 위험요소가 존재하고 있으나, 현장에서 이를 효율적으로 관리할 수 있는 방안의 수립이 미흡한 실정이다. 따라서 본 연구에서는 철도 관련 실무자들을 대강으로 설문조사를 실시하여 공종별 위험 요인을 도출한다. 이를 통해 RBS(Risk Breakdown Structure)를 구축하고 제시된 RBS에 의한 위험도를 산정한 후 이를 기반으로 VR시스템과의 연동 및 위험관리 체계 구축 방법론을 제시하고 있다. 따라서 현장에서의 주요 공종별 Risk 위험도를 가상환경에서 구현이 가능하므로 위험요인에 따른 시설의 직관적 파악이 가능하다. 또한 시공자들은 나타난 시각화 정보에 의한 Risk에 대비해 효율적인 공사 관리를 이행할 수 있을 것으로 기대된다.

  • PDF

Development of Performance Indicators on Private Building Construction Sites using Supervisory Report (감리데이터 기반의 민간 건축현장 성과지표 개발)

  • Sung, Yookyung;Hur, Youn Kyoung;Lee, Seung Woo;Yoo, Wi Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.65-75
    • /
    • 2022
  • As performance measurement is important for systematic management, the key indicators for performance measurement have been consistently researched in the construction industry. However, there are only a few cases in which performance measurement is performed because it requires strenuous efforts to collect data for measurement. Unlike the public sector, which has been collecting project data through laws, the private sector has very little data to measure performance. In contrast, supervision work concerns important data necessary for the performance management on building construction sites in accordance with the Building Act. Therefore, in this study, we used the data from supervisory reports to measure the performance of private building projects. First, we derived 6 performance areas and 15 indicators through a few rounds of expert group discussions and 2 surveys. Then, we identified the performance indicators with high feasibility of data collection and computed their degree of significance via the analytic hierarchy process. It is expected that the performance indicators and their computational processes derived in this study can be used to systematically measure the performance and aid the speedy diagnosis of private building construction sites.

Design Route Analysis of Dangerous Road for Traffic Accident using GIS (GIS를 이용한 사고 위험도로의 설계노선 분석)

  • Lee, Kye-Dong;Jung, Sung-Heuk;Lee, Jae-Kee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.6
    • /
    • pp.591-598
    • /
    • 2008
  • Recently, the government has improvement projects of dangerous road for the site that has very high accident rate due to bad geometric structures of the road. Although, route selecting of the road is a basic and important process, but the process of route selecting must consider the technical, safety and environment factor together. Also, the technology for the 3-dimensional terrain model can be used as an important factor in planning and designing for selecting alternative route projects. In the course of experimenting with the 3-dimensional topography generated by the combination of the digital map and drawing of route, the technology as been developed to offer the multi-dimensional access to the potential construction sites from the nearby main roads. This 3-dimensional digital elevation model has made it possible to make various terrain analysis base on GIS, which provides real-time virtual access to the designated construction sites for development planning and construction projects. Therefore, this study presents a reasonable plan for route selecting from some alternative routes through subjective evaluation and classify the methods linked basic design of road construction.