• Title/Summary/Keyword: 도로교통량

Search Result 583, Processing Time 0.374 seconds

Time series property of the 30th Design Hourly Factors in National Highways (일반국도 30번째 설계시간계수의 시계열적인 특성 분석에 관한 연구)

  • Oh, Ju-Sam;Im, Sung-Man
    • International Journal of Highway Engineering
    • /
    • v.9 no.4
    • /
    • pp.1-9
    • /
    • 2007
  • To decide the number of road lane is very important and related to the 30th design hourly factor in the design of transportation facilities. But, as the quantitative division of road types is difficult, most planner and designer for deciding the 30th design hourly factors have used the fixed values in our country. In this study, we have analyzed the time series property of the design hourly factors in national highways and developed the model capable of estimating the 30th design hourly factors using real data. The presented model is a simple regression model(DHV = K*AADT), which is applied to the division of road lanes(2 or 4 lanes) and the level of AADT(3 levels). As a results, the simple regression model have better performance than the existing method with respect to MAPE and $R^2$. Also, the variations of the 30th design hourly factors are small. The more traffic volume increase, the more the factors decrease. But, the limitation of this study is to use the exiting method estimating the values of the factors, it is subject to study hereafter.

  • PDF

A Study of Improvement of Urban Pavement Maintenance Technique based on Pavement Condition Evaluation and FWD Data (도로포장 표면조사와 FWD정보에 기반한 도심지 도로포장 유지보수 기법 개선방안 연구)

  • Lee, Sangyum
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.12
    • /
    • pp.532-541
    • /
    • 2016
  • The objective of this paper is to support accurate pavement condition assessment and decision of proper maintenance method and time by conducting visual inspection and calculating the remaining life of pavement from falling weight deflectometer(FWD) data. Each was implemented in the same long-term performance pavement(LTPP) sections. Visual inspection was executed to measure pavement condition indices such as crack, rutting and international roughness index(IRI) and the Seoul Pavement Index(SPI) was calculated based on these results. The dynamic modulus was back-calculated from the FWD data. The remaining pavement lives were determined from equivalent single axle loading(ESAL) and FWD data. Correlation of maintenance priority by each result value was examined. Consequently, the correlation between remaining life to Crack and Rutting was higher than the other factors or indicesbecause IRI is not related to FWD value and SPI value consists with IRI value and other indices. The R-square value of correlation of FWD with Crack and Rutting was 0.65, which indicated an insufficient correlation. Consequently, when decision of maintenance of method, time, etc. is determined, FWD data have to be considered with Crack and Rutting because of those relations.

Construction of Road Alignment Information System Using Digital Imagery (수치영상을 이용한 도로선형정보체계 구축)

  • Seo, Dong-Ju;Lee, Jong-Chool;Park, Woon-Yong;Cha, Sung-Yeoul
    • 한국지형공간정보학회:학술대회논문집
    • /
    • 2003.09a
    • /
    • pp.83-88
    • /
    • 2003
  • 최근 수치영상은 사진측량의 기본원리를 이용하여, 각종 첨단 산업분야에 그 응용이 증대되고 있으며, 많은 관심과 연구가 진행되고 있다. 특히 가장 중요한 국가시설물인 도로 경우에기존도로의 설계자료나 수치지도가 없는 지역인 경우가 많아 그 자료들을 획득하는데 많은 비용이 소모된다. 또한 도로자료 획득시 도로에 교통량의 증가로 종래 측량방법으로는 상당한 어려움이 있다. 따라서 본 연구에서는 수치사진측량에 의한 도로선형정보체계 구축방법을 제시 하고자한다. 먼저 수치사진측량에서 취득된 자료들을 객체 지향적인 언어인 Delphi를 이용하여 도로평면선형정보와 도로종단선형정보를 구축하는 프로그램을 개발하였다. 개발한 도로평면선형정보는 기발표된 연구보다 IP값은 약 X,Y방향으로 약 2m정도 정확도가 향상되었고, 곡선반경(R)은 약 2.5m정도의 정확도향상이 있었다.

  • PDF

Incident Detection Algorithm using Fuzzy Logic and Pattern (퍼지 논리와 패턴을 이용한 유고감지 알고리즘)

  • Hong Nam-Kwan;Choi Jin-Woo;Yang Young-Kyu
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2006.05a
    • /
    • pp.341-344
    • /
    • 2006
  • 유고란 도로상에서 교통량의 주기적인 집중에 의한 혼잡과는 구별되는 개념으로 교통사고, 도로보수 그리고 자연재해와 같은 비 반복적인 정체의 상황을 일컫는다. 이러한 유고는 막대한 통행시간이 추가로 발생하고 연료소모, 환경피해 등의 문제가 발생하므로 이러한 교통손실을 최소화하기 위하여 자동유고감지 알고리즘의 개발이 필수적이다. 이를 위하여 현재 다양한 검지기에서 수집된 교통 데이터를 바탕으로 유고를 감지하는 연구가 많이 진행되고 있다. 본 논문에서는 각종 유고 상황을 인지하여 제2의 사고를 예방할 수 있는 효율적인 유고감지 알고리즘을 개발하기 위하여 퍼지논리와 패턴을 함께 사용하였다. 먼저 퍼지논리와 패턴에 사용되는 데이터는 루프 검지기에서 5분 마다 수집된 교통정보(교통량, 점유율, 속도)를 이용하였다. 교통정보를 이용하여 구축된 요일 및 시간대별 패턴과 함께 퍼지논리를 이용하여 도출된 유고 소속도를 가지고 유고를 감지하였다.

  • PDF

Review of lane utilization factor in KHCM (한국 도로용량편람의 차로이용계수에 대한 고찰)

  • 정회빈
    • Proceedings of the KOR-KST Conference
    • /
    • 1999.10a
    • /
    • pp.229-234
    • /
    • 1999
  • 본 논문은 한국도로용량편람의 신호교차로 용량분석에서 차로이용계수를 적용하는 방법을 신호교차로 용량분석의 절차와 이동류 구분 측면에서 살펴보았다. 고찰한 결과 차로이용계수의 개선방향은 다음과 같다. 첫째, v/c 비에 따라 차로이용계수를 적용함으로써, 반복계산이 불필요하게 발생한다. 따라서 편람 개정시 이러한 반복계산을 없애는 값을 산정해야 한다. 둘째, 차로이용계수는 직진 전용차로를 통과하는 직진교통량에 대해서만 적용해야 한다. 실제 현장에서 교통량 조사 상황을 고려해보면, 상당히 불합리한 값을 도출한 것이다. 따라서 차로이용계수를 적용하는 이동류를 정확히 설명하고 그 문제점을 분명히 해야 한다. 셋째, 차로이용계수는 직진 이동류에 대해서만 있다. 우리 나라 전역에 있는 소규모 교차로를 고려해 볼 때, 차로이용계수는 다양한 차로군(lane group)에 대하여 추가적으로 조사연구가 필요하다.

  • PDF

Development of Model for Optimal Concession Period in PPPs Considering Traffic Risk (교통량 위험을 고려한 도로 민간투자사업 적정 관리운영기간 산정 모형 개발)

  • KU, Sukmo;LEE, Seungjae
    • Journal of Korean Society of Transportation
    • /
    • v.34 no.5
    • /
    • pp.421-436
    • /
    • 2016
  • Public-Private-Partnerships tend to be committed high project development cost and recover the cost through future revenue during the operation period. In general, long-term concession can bring on more revenue to private investors, but short-term concession less revenue due to the short recovering opportunities. The concession period is usually determined by government in advance or by the private sectors's proposal although it is a very crucial factor for the PPPs. Accurate traffic forecasting should be most important in planing and evaluating the operation period in that the forecasted traffic determines the project revenue with user fees in PPPs. In this regards, governments and the private investors are required to consider the traffic forecast risk when determining concession period. This study proposed a model for the optimal concession period in the PPPs transportation projects. Monte Carlo simulation was performed to find out the optimal concession period while traffic forecast uncertainty is considered as a project risk under the expected return of the private sector. The simulation results showed that the optimal concession periods are 17 years and 21 years at 5.5% and 7% discount level, respectively. This study result can be applied for the private investors and/or any other concerned decision makers for PPPs projects to set up a more resonable concession period.

A Sort of Road Packing Samples and The Variation of reflectance Properties by Grinding (도로 포장 시료의 종류와 마모에 따른 반사특성의 변화)

  • Kim, Gi-Hoon;Park, Jung-Il;Kim, Hoon
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 1999.11a
    • /
    • pp.207-212
    • /
    • 1999
  • 도로 조명에 있어서 질적인 평가 기준으로서 중요한 위치를 차지하고 있는 휘도 개념은 노면의 반사 특성에 따라 크게 좌우된다. 또한 노면의 반사 특성은 도로가 설치된 이후로부터의 시간, 날씨의 변화, 주어진 구간 내에서의 교통량 등에 의한 노면 재질의 마모 상태에 따라서 복합적으로 변화한다. 그러므로 도로 조명의 설치에 있어서 노면 반사 특성의 측정은 매우 중요할 뿐만 아니라 국내 도로 조명 설비의 휘도 기준을 상정하는데 있어서도 매우 중요하다. 이에 따라서 일반적으로 국내에서 사용되는 4가지의 도로 포장 시료인 콘크리트 도로 샘플, SMA(Stone Matrix Asphalt), 투수성, 밀입도 도로 샘플을 취하여 그 특성을 파악하고 반사 특성에 대한 초기값을 측정하였으며 각 샘플들에 대한 재질의 마모 상태에 대하여 반사 특성의 변화를 각각 측정하였다. 또한 그 측정한 값들을 각각 분석하고 재질의 마모에 따른 평균 휘도 계수 Q0, 정반사 인자 S1, S2값의 변화를 그래프로 제시하였다.

  • PDF

Road Alignment Design using Raster GIS (Raster GIS를 활용한 도로선형설계)

  • Lee, Jun-Seok;Choi, Hyun;Kang, In-Joon
    • 한국지형공간정보학회:학술대회논문집
    • /
    • 2002.03a
    • /
    • pp.34-42
    • /
    • 2002
  • 본 연구에서는 사회발전과 더불어 성장하는 주요도로의 교통량을 충족시키기 위해 지속적으로 진행되는 도로건설사업의 노선선정 및 그에 따른 환경적인 문제의 중요성이 인식되는 바 가장 적절한 도로건설사업을 위해 지리정보시스템 기법을 도입하여 도로건설에 있어서 고려되는 몇 가지 기본자료를 선택하고 데이터베이스를 구축하여 구축된 데이터의 분석과 활용에 의해 노선선정에 따른 절 성토량과 기존의 도로설계프로그램으로 절 성토량을 산정하여 비교하였고 기존의 수작업에 의한 설계된 최적노선과 GIS에서 자동 선정된 노선을 비교하여 도로건설사업에 따른 객관적이고 경제적, 환경적, 기술적 문제를 해결 평가하고 Virtual GIS로 가상현실 구현과 기존의 도로설계 프로그램을 이용한 삼차원 도로설계를 제시하였다.

  • PDF

Feasibility Evaluation of Lane Grouping Methods for Signalized Intersection Performance Index Analysis in KHCM (도로용량편람 신호교차로 성능지표 분석을 위한 차로군 분류의 적정성 평가)

  • Kim, Sang-Gu;Yun, Ilsoo;Oh, Young-Tae;Ahn, Hyun-Kyung;Kwon, Ken-An;Hong, Doo-Pyo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.13 no.1
    • /
    • pp.109-126
    • /
    • 2014
  • The level of service (LOS) of the Highway Capacity Manual (KHCM) has been used as a basic criterion at decision making processes for signalized intersections in Korea. The KHCM provides five steps for the signalized intersection analysis. Among them, lane grouping, which is the third step, significantly influence the final LOS. The current method presented in the KHCM, however, classifies a shared lane as a de facto turning lane group, even though the turning traffic of the shared lane is few. Thus, this research was initiated to provide an alternative. To this end, three alternatives were suggested, including the method based on the lane grouping presented in the U.S. Highway Capacity Manual, the method using turning ratio of shared turning lane, and the method using a threshold traffic volume in lane grouping. The feasibilities of the three methods were evaluated using a calibrated CORSIM model. Conclusively, the method using a threshold traffic volume in lane grouping outperformed.

A Study on Roundabout Signal Metering Operation by Considering Entry Lane's Traffic Volume (진입교통량을 고려한 회전교차로 Signal Metering 운영에 관한 연구)

  • Ahn, Woo-Young
    • International Journal of Highway Engineering
    • /
    • v.14 no.2
    • /
    • pp.175-181
    • /
    • 2012
  • Under unsaturated capacity conditions with balanced approach flows, roundabout gives less delay and queue length than existing signalized intersections; however, over capacity conditions with unbalanced approach flows(flow above 450 pcu/h/lane), roundabouts efficiency drops due to the short gap between entering vehicles and circulating vehicles. This study provides a roundabout Signal Metering transfer standard and operation method. In this study, a four-way-approach with one-lane roundabout is selected to compare the Signal Metering performance for the case of unbalanced flow conditions. The performance is evaluated by using SIDRA software in terms of average delay and queue length. The result shows that the Signal Metering provides substantial improvements for the case of total approach flow is 1,800~2,000 pcu/h in which the main approach flow ratio is 60~70% gives 30~40% less delay and 30~60% less queue length than normal roundabout operation. Also, it is approved that operational performance saving can be achieved when the Metered Approach is selected adjoining to the main approach in pair.