An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the Time of System Transition, from Responsibility Supervision to Construction Management(I) - Main Focus on ICEC Framework - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(I) - 역량지수 등급 체계를 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.5
    • /
    • pp.1147-1156
    • /
    • 2015
  • The result of responsibility supervision system which has been enforced for the last twenty (20) years since January, 1994 is evaluated, and keeps an eye out the process of unification and absorption of the system into the construction management (CM). As a baseline data for this study, the grade framework of construction engineer's ICEC introduced with CM is summarized. In this manuscript, the questionaire survey for CM and ICEC was conducted toward the target group of road field construction engineers and analyzed the outcome of the respondents' answers. 50% of the respondents have answered positively for the question about converting responsibility supervision to CM. 48% of the respondents from construction works field have answered positively for converting responsibility supervision system to CM while 38% of the respondents from engineers of supervision field have answered positively, less positive than the answers from works field engineers. 46% of overall respondents have answered, however, to maintain the present system of 40%, 40% and 20% on the survey to the question asking the opinion on the ways of calculating ICEC to use the rates : 40% of career, 40% of qualification and 20% of academic achievements. However, it appeared that engineers who have comparative advantages with academic achievements and career, and engineers with lower grade qualification demanded higher rate for career.

Development of Standard Work Type to Utilize Drone at Expressway Construction Sites (고속도로 건설현장에서 드론 활용을 위한 표준공종 개발)

  • Lee, Suk Bae;Jeong, Min;Auh, Su Chang;Kim, Jong Jeon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.461-468
    • /
    • 2021
  • The role of drones is increasing day by day in smart construction that manages construction sites with 3D data in every life cycles. This is because both the digital surface model (DSM) and the orthoimage obtained for the construction site through the drone are made of point cloud data. This study aims to develop standard work types for drone use in order to systematically utilize drones in expressway construction sites. For the study, two expressway construction sites in Korea were set as test beds, and construction types applicable to drones were derived and verified through a pilot project. As a result of the study, three construction work types were developed for road planning, road design and maintenance, respectively, and in road construction, twenty-one detailed construction types were developed for five construction work types. It is expected that drones can be used more systematically not only at expressway construction sites, but also at other road construction sites by utilizing the "standard work type at expressway construction site for drone use" developed in this study.

Analysis of Effectiveness on Improving Hazardous Roads (위험도로 개선사업에 따른 효과 분석에 관한 연구)

  • 하태준;박제진;장안상;박찬모
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.4
    • /
    • pp.213-222
    • /
    • 2002
  • 교통사고가 중요한 사회 문제로 대두되어 정부는 교통안전대책의 실질적인 추진 방안으로 "교통사고 잦은 곳"과 "위험도로" 개선사업을 제시·시행하고 있다. 이에 "교통사고 잦은 곳" 개선사업은 추진현황에 따라 각 년도별 기본 개선계획의 평가 및 경제적 타당성에 대한 효과분석이 이루어지고 있다. "위험도로"'의 경우 모든 사업을 건설교통부 산하 국도유지사무소에서 진행을 하고 있으나, 광범위한 사업으로 인한 업무과중 및 개선사업비 조달 등의 문제로 개선된 현황의 체계적인 효과분석이 이루어지지 못하고 있는 실정이다. 이에 따라 본 연구에서는 "위험도로" 개선사업에 대한 효과분석을 수행하여 보다 비용-효율적인 개선사업이 될 수 있는 기반을 마련하고자 한다. 이를 위해 전체 위험도로 구간 중에서 '광주국도유지사무소' 및 '순천국도유지사무소' 관할 구역 내의 "위험도로"로 선정(1995년)된 도로구간 중 1999년 이전에 도로개선공사가 완료된 후 현재 교통소통이 원활하게 진행되는 18개 도로구간을 연구 대상으로 선택하였다. 선택되어진 18개 구간에 대한 도로개선공사 전후의 교통사고건수 및 교통사고율을 효과척도로 삼고 각 사고에 대한 소요비용을 기준으로 경제성 평가를 실시하였다. 이를 근거로 "위험도로" 개선사업에 대한 타당성조사 및 효과분석을 실시한 결과 "위험도로" 개선사업의 타당성이 입증되었다. 연구 분석결과가 전라도 권역의 사업을 중심으로 진행되어져 전국적인 개선사업에 대한 대표성을 가지고 있다고 볼 수는 없으나, 체계적인 분석을 통한 개선사업의 효과를 구체화 할 수 있는 대안을 제시할 수 있을 것으로 사료된다. 더불어 공사 완료된 도로구간에 대한 상세한 공사비 내역과 다수의 개선방안별 자료가 갖추어지면 위험도로의 사고율과 개선방안별 상관관계를 관련 비용을 중심으로 도출함으로서 비용-효율적인 개선 방안을 제시할 수 있을 것이다. 또한 비용-효율적인 개선 방안을 기반으로 한 각각의 사업 투자우선 순위 결정방안에 관한 지속적 인 연구가 요망된다.

Roadway Preliminary Cost Estimation Prototype based on BIM and GIS (BIM/GIS 기반 도로 개략공사비 산정 프로토타입 연구)

  • Park, Wonyoung;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.14-21
    • /
    • 2013
  • While a detailed cost estimation utilizes the comprehensive quantity information obtained from a complete drawing and specification, an approximate cost estimation heavily relies on the subjective decisions. This phenomenon is because the approximate estimation is usually conducted in early stage of the construction phase where the drawing and specification are not available. This study developed a roadway construction cost estimation system which enables users to estimate the approximated cost of the project in early stage. The system identifies the variation of the construction costs due to the road route change using a cased based reasoning(CBR) method. Overall the system is expected to improves the accuracy and effectiveness of the estimation process, because it would provide users with increased accessability and consistent results in early stage of the project which leaded to the increased work transparency.

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.

건설분야기술의 경제성 평가 적용 방안 연구

  • Seo, Jin-Lee;Jeong, Hye-Sun
    • Proceedings of the Technology Innovation Conference
    • /
    • 2009.02a
    • /
    • pp.275-293
    • /
    • 2009
  • 국가적으로 국가경쟁력 확보 차원에서 신기술 개발 및 국가전체에서의 미활용기술의 발굴 및 사업화가 추진되고 있다. 건설분야도 아직까지 관련한 기술이 사업화되지 못하고 있는 실정이므로 이러한 기술의 사업화 촉진을 위하여 경제성 분석을 적극적으로 활용할 필요성이 제기되고 있다. 이러한 기술의 경제성 평가영역은 기술 자체에 대한 이해를 전제로 연구개발 및 시장정보, 경제학과 경영학, 산업공학 등 다양한 학문이 모두 융합되는 복합평가영역의 범주에 속하기 때문에 이에 대해 체계적으로 평가체제를 마련하기는 많은 한계가 있다. 특히, 건설기술은 그 분야만의 특이한 특성과 정부주도형, 사회기반적인 시장에 유동적이므로 이러한 부분의 고려가 요구된다. 관련하여 도로 및 교량기술의 사례를 기반으로 기술의 경제성 평가를 수행함으로써 다른 분야와 차별화 되거나 특화되는 부분을 도출, 분석, 정리하고자 한다. 본 연구에서는 건설 기술 가치평가 시 각각의 평가요소에 건설 산업의 특성을 반영하는 방법 및 절차를 정리하고, 현실적으로 고유한 가치평가요소를 추출하여 실무에 활용할 수 있도록 한다.

  • PDF

A Strategy for Developing New Road Projects (경관도로 등 신개념의 도로사업 개발에 관한 연구)

  • Kim, Eung-Cheol
    • International Journal of Highway Engineering
    • /
    • v.9 no.2 s.32
    • /
    • pp.115-127
    • /
    • 2007
  • Developed countries, especially in road construction and management fields, introduce new road porjects such as National Scenic Byways Program(NSBP program) in USA and the Eco-road project in Japan. This study develops a conceptual model for deploying new road projects in Korea. The four step approach is suggested to create new road projects, including foundation of an act based on the existing Road Act, creation of new road project ideas, development of evaluation process and guidelines, and enhancement of an administrative scheme. To create new road projects, three different ways are devised; (1) designation of national roads having uniqueness in overall spectrum, (2) designation of roads having intrinsic values in a different aspect, (3) designation of single structures of engineering outcomes such as bridges, tunnels, new design techniques, considerable Value Engineering output, and well analyzed Life Cycle Cost Analysis practices. For the evaluation process, NSBP program of USA and/or Sustainable City Award program of Korea would be recommended. An administrative scheme and integrated funding process for the new road projects are also suggested based on evaluation of tasks of each team or division of Korea Ministry of Construction and Transportation.

  • PDF

The Method of Results of Decision Reflections Between PI Project Valuation Groups Using AHP (AHP를 활용한 PI사업 평가그룹간 의사반영 방안)

  • Kim, Kwan-Joong;Jang, Myung-Soon
    • International Journal of Highway Engineering
    • /
    • v.8 no.4 s.30
    • /
    • pp.145-157
    • /
    • 2006
  • Generally, the method of the policy analysis has been used for making a policy decision of the development project of the road through the expert interview based on AHP. According to introducing PI, the study of the method of the integrating process for various opinion of the related groups is required. On this study I evaluate what is a difference between the results of integrated process and the AHP analysis on what is major considering factor in decision-making process. From the analysis, each evaluate factor is in level of significance by ANOVA. First, there is a significance level difference between Group A, C and Group B Second, there is also a significance level difference on the result of AHP analysis for each group in order to evaluate by integrated method. Finally, the method of AHP analysis which considers priority factor is expected as to be useful tool on decision-making of various group.

  • PDF

Standardization of Factors Classification Associated with Cost and Schedule Variations in Road Construction Projects (도로건설공사 공사비·공사기간 증감요인 분류체계 표준화 연구)

  • Mun, Junbu;Lee, Juhui;Baek, Seungwon;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.821-830
    • /
    • 2023
  • Various studies has tried to unveil causes of cost overrun and schedule delay in the road construction project. However, these causes need standardization due to difference by guidelines, relevant research, and facilities. Therefore, this study identifies and elaborate standard road construction cost and schedule variation factors that can be used in the planning and execution of the project. variation factors have been derived and grouped through literature review and modified and supplemented through expert interview. In addition, the connection with the relevant guidance factors is confirmed and the usability is reviewed by applying actual road construction cases. The factors suggested in this study comprehensively include factors of related guidelines and previous research, more clearly distinguish, support decision making.