• Title/Summary/Keyword: 도로건설사업

Search Result 263, Processing Time 0.025 seconds

A Study on the Construction Demand for Network of Metro Railroad in Busan-Ulsan-Gyeongnam Area - In the place of National Road No.7 - (부울경 광역도시철도망 구축 필요성에 관한 연구 - 국도 7호선 중심으로 -)

  • Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.771-778
    • /
    • 2011
  • Preliminary feasibility study on Busan metro line #1 in Yangsan line (Nopo-Bukjeong) depending on active volume of mass transportation between Yangsan city and Busan city was conducted. As the study concluded that it's valid, the necessity to establish the metro railroad network connecting to Busan, Ulsan and Gyeongnam Province is demanded to improve the transportation issues in Ungsang area vulnerable to metro service and to drive the balanced development between metropolitan cities. In addition, the volume of transportation depending on methods in target areas and road traffic assignment are surveyed to put a stress on the necessity to establish the metro railroad network. As the demand of transportation for alternative lines is predicted, the budget and benefits for construction for each alternative line set for the rough economic analysis depending on traffic volume for each method and traffic assignment results. The total project budget necessary for construction of proposal line #1 set as effective one among target three lines in this project is calculated in 794.32 billion won. Construction accounts for the most expensive in expenses for project and contingency allowances, purchases for vehicles and collateral expense are followed in orders. However, compensation for lands is not counted. In particular, according to economic analysis in proposal #1, ratio of benefit/cost (B/C) is 0.584, net present value (NPV) is -217.47 billion won, the internal rate of return (IRR) is analyzed in 0.604 %. At the current stage, it is not economically feasible, but the B/C is 0.737 in long-term upon construction of Yangsan line between Wolpheong and Yongdang which is proposal line #3. Therefore, when Busan metro basic plan is reorganized to aim the benefit of residents in Ungsang area vulnerable to the metro service, we think it must be necessary to establish the metro railroad network connecting to Busan-Yangsan-Ulsan which is proposal line #2 by extending the existing Sinjeong line and including this task line in high-ranked plan related to metro railroad.

Optimal Toll Estimate of a Toll Road Using Fuzzy Approximate Reasoning - Forced on the Geoga Bridge - (퍼지근사추론을 이용한 유료도로의 적정요금 산정 - 거가대교를 중심으로 -)

  • Ha Man-Box;Kim Kyung-Whan;Kim Yeong
    • International Journal of Highway Engineering
    • /
    • v.8 no.3 s.29
    • /
    • pp.63-76
    • /
    • 2006
  • For a private toll road project, deciding optimal toll is an important element of economic analysis for the project and a challengeable work. In this study, the optimal toll of a private toll bridge, Geoga Bridge which connects Geoje Island of Gyeongnam Province and Gaduk Island of Busan was estimated using Stated Preference (SP) data. The SP data were collected by interviewing the passenger car drivers travelling on the National Road 14. They are latent users of the bridge. A fuzzy approximate reasoning model to estimate the optimal toll was built using the SP data. For the input variable of the model, the saved travel time and toll level were employed and the diversion rate to the bridge was employed for the output variable. The diversion rates for each toll level and saved travel time were estimated and the toll level which had maximized the toll revenue was decided as optimal toll. The optimal toll was tested by comparing with the average pay rate of passenger car drivers. Since the optimal toll for passenger cars at one hour saving, the 6,250 won is about 50 % of the average pay rate of passenger car divers, the toll was evaluated not to be high. The technique employed in this study may be used for the estimation of the optimal tolls for other kinds of vehicles.

  • PDF

A Study on the Calculation of Dynamic Yellow Signal Time Based on Approach Speed and Collision Points (접근속도와 상충지점 기반 동적황색신호시간 산정 연구)

  • Hyunho Son;Sanghoon Sung;Choulki Lee;Hyeon Soo Lee
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.22 no.4
    • /
    • pp.14-34
    • /
    • 2023
  • The purpose of this study was to calculate the appropriate yellow-signal time for intersections, to find out the relationship between the approach speed and intersection width when calculating the time, and to secure safety by minimizing conflicts and dilemma sections in intersections that change according to the signal operation. For this purpose, 6,824 data points from 5 intersections were collected and analyzed. The main results of the study are as follows. First, the approach speed of individual vehicles in different lanes was analyzed, and the width of an intersection was defined by considering the conflict in each direction. Second, we developed a multiple regression model based on the approach speed and conflict points, which compensated for the problems of an existing formula. Third, a standard table is presented for applying the appropriate yellow-signal time according to the approach speed and intersection width based on a development formula. A method is also presented to determine the safety of the length of the dilemma according to the change in the yellow-light time by presenting a calculation table that can cross-analyze the yellow-signal time and a dilemma section using the relationship.

An Estimation of the Minimum Distance Between a Roundabout and Signal Crosswalk Using VISSIM (VISSIM분석을 통한 회전교차로 인접 신호횡단보도의 최소이격거리 산정)

  • KIM, Young Beom;LEE, Dongmin;Jun, Jin Woo;Cho, Hanseon
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.4
    • /
    • pp.337-347
    • /
    • 2015
  • Since the application of roundabouts by 2010 have been started, more than 350 roundabouts were installed in Korea. Recently the types of constructed roundabouts become various, and the intersection conditions for installing roundabouts were also various. However, there were some difficulties to install roundabouts around school zone due to safety problems. In this study, appropriate distance from adjacent signal crosswalks to roundabouts were estimated for securing pedestrian safety and operation efficiency around school zone. With the analyses, the minimum distance standard was suggested to obtain operational effectiveness of roundabout according to traffic volume, traffic flow, pedestrian green time and secures pedestrian safety and convenience. In this paper, average delay of roundabout as various length of distances between an adjacent crosswalk and a roundabout as different pedestrian signal times, traffic volumes, traffic flow rates were analyzed. Through this study, it was found that about four times of delay in a roundabout was generated if there was adjacent signal crosswalk. However if there is enough distance between an adjacent crosswalk and a roundabout, the value of increasing delay on roundabouts with adjacent a signalized crosswalk can be considerably reduced. Critical value of the distance between a roundabout and a signal crosswalk in case of roundabouts within 200-500 vehicle/hour/lane entry traffic flow, 20-40% of left turn traffic, and over 15 seconds pedestrian green time was about 50 meters. In conclusion, if there is minimum 40 meter distance from roundabouts, adjacent signal crosswalks can be installed and operated for students' safety around school zone.

Application of Linear Schedule Chart by Linking Location Information of Construction Project with Horizontal Work Space (수평작업공간을 갖는 건설프로젝트의 위치정보 연동에 의한 선형공정표 적용방안)

  • Han, Seon Ju;Kim, Hyeon Seung;Park, Sang Mi;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.601-610
    • /
    • 2018
  • Since the building construction works are repeated vertically in a limited space, there is not a great need for the location information of each activity in the schedule management. On the other hand, civil engineering works such as road and railway projects consist of a large number of earthworks, long bridges, and long tunnels. These types of work should be controlled in a horizontal space according to the linear axis of several tens of kilometers. In other words, since most of the activities are managed in the unit of distance from the start point to the end point, it is possible to improve the efficiency of the schedule management by linking the location information of the activity with the schedule data in the schedule management system. This study presents a methodology for creating a linear schedule chart specific to a project with horizontal work space and compares the convenience with the existing Gantt chart. In addition, the methodology of linking linear schedule chart to the 4D CAD system, which is a typical BIM technology in the construction phase, is presented to improve the usability of BIM. The practical applicability of the proposed methodology was verified statistically.

A Study on the Settlement Prediction of Soft Ground Embankment Using Artificial Neural Network (인공신경망을 이용한 연약지반성토의 침하예측 연구)

  • Kim, Dong-Sik;Chae, Young-Su;Kim, Young-Su;Kim, Hyun-Dong
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.7
    • /
    • pp.17-25
    • /
    • 2007
  • Various geotechnical problems due to insufficient bearing capacity or excessive settlement are likely to occur when constructing roads or large complexes on soft ground. Accurate predictions of the magnitude of settlement and the consolidation time provide numerous options of ground improvement methods and, thus, enable to save time and expense of the whole project. Asaoka's method is probably the most frequently used one for settlement prediction and the empirical formulae such as Hyperbolic method and Hoshino's method are also often used. To find an elaborate method of predicting the embankment settlement, two recurrent type neural network models, such as Jordan model and Elman-Jordan model, are adopted. The data sets of settlement measured at several domestic sites are analyzed to obtain the most suitable model structures. It was shown from the comparison between predicted and measured settlements that Jordan model provides better predictions than Elman-Jordan model does and that the predictions using CPT results are more accurate than those using SPT results. It is believed that RNN using cone penetration test results can be a highly efficient tool in predicting settlements if enough field data can be obtained.

Mechanism of steel pipe reinforcement grouting based on tunnel field measurement results (터널 현장 계측결과를 통한 강관보강 그라우팅의 거동 메커니즘)

  • Shin, Hyunkang;Jung, Hyuksang;Lee, Yong-joo;Kim, Nag-young;Ko, Sungil
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.3
    • /
    • pp.133-149
    • /
    • 2021
  • This study aims to report the behavioral mechanism of steel pipe reinforcement grouting, which is being actively used to ensure the stability of the excavation surface during tunnel excavation, based on measurements taken at the actual site. After using a 12 m steel pipe attached with a shape displacement meter and a strain gauge to reinforce the actual tunnel surface, behavioral characteristics were identified by analyzing the measured deformation and stress of the steel pipe. Taking into account that the steel pipes were overlapped every 6 m, the measured data up to 7 m of excavation were used. In addition, the behavioral characteristics of the steel pipe reinforcement according to the difference in strength were also examined by applying steel pipes with different allowable stresses (SGT275 and SGT550). As a result of analyzing the behavior of steel pipes for 7 hours after the first excavation for 1 m and before proceeding with the next excavation, the stress redistribution due to the arching effect caused by the excavation relaxation load was observed. As excavation proceeded by 1 m, the excavated section exhibited the greatest deformation during excavation of 4 to 6 m due to the stress distribution of the three-dimensional relaxation load, and deformation and stress were generated in the steel pipe installed in the ground ahead of the tunnel face. As a result of comparing the behavior of SGT275 steel pipe (yield strength 275 MPa) and SGT550 steel pipe (yield strength 550 MPa), the difference in the amount of deformation was up to 18 times and the stress was up to 12 times; the stronger the steel pipe, the better it was at responding to the relaxation load. In this study, the behavior mechanism of steel pipe reinforcement grouting in response to the arching effect due to the relaxation load was identified based on the measured data during the actual tunnel excavation, and the results were reported.

Behavior of Quaywall Pile by Lateral Movement of Revetment on Soft Ground (연약지반 호안의 측방유동에 따른 안벽 말뚝의 거동)

  • Shin, Eunchul;Park, Jeongjun;Ryu, Ingi
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.4
    • /
    • pp.53-62
    • /
    • 2006
  • Recently, the lateral displacement of the passive piles which are installed under the revetment on the soft ground is very important during the land reclamation work along the coastal line. The revetment on the soft clay develops the lateral displacement of ground when the revetment loading exceeds a certain limit. The lateral displacement of ground causes an excessive deformation of underground structure itself and develops lateral earth pressure against the pile foundation. The subject of study is to investigate the lateral displacement of pile foundation during the construction of container terminal at the ${\bigcirc}{\bigcirc}{\bigcirc}{\bigcirc}$ port in Incheon. The displacement of pile and the vertical settlement were measured in the field and finite element method(FEM) analysis for each construction sequence was performed using AFFIMEX(Ver 3.4). From the comparison of the results from field measurement and the finite element analysis, the settlement of the reventment has already occurred at the time of field measurements. Since then, the noticeable lateral displacement of piles and settlement were occurred during the filling of dredged soil inside the revetment dredging and reclaiming work. After completing filling, the lateral displacement and field settlement were reduced remarkably. Generally, the results from the finite element analysis show larger than those from the measurement.

  • PDF

A Study on Strength and Durability Characteristics of Cemented Weathered Mudstone (풍화 이암 고결토의 강도 및 내구성 특성에 관한 연구)

  • Kim, Seong-Heon;Moon, Hong-Duk;Park, Sung-Sik
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.10
    • /
    • pp.33-45
    • /
    • 2019
  • In this study, in order to recycle a large amount of rocks and weathered mudstones produced by civil engineering projects such as railways and highways, as materials for roadbeds or embankment materials, circumferential specimens with a diameter of 5 cm and a height of 10 cm were made. A mudstone that weathered rapidly during rainfall was collected from Pohang construction sites. The weathered mudstone passed through a 2 mm sieve. It was prepared with the cement ratio, the sand ratio, curing condition and curing days. Three specimens were prepared according to each condition and then the unconfined compressive test, durability test and SEM analysis were performed to evaluate the engineering properties of the cemented soil. In the case of 28 days cured specimen, the strength of under-water cured specimens was 32-55% and the durability index was about 15% higher than air cured specimens. In addition, when the CR increased from 8% to 16%, the unconfined compressive strength (UCS) of pure mudstone cemented soil under water increased by about 1.6 times and the durability index increased by about 1.9 times. When the SR increased from 0% to 50%, the UCS of the specimen with SR = 10% was slightly less than or equal to specimen with SR = 0%. Then, as the SR became 30-50%, the UCS increased up to 51%. Unlike the UCS, the durability index increased continuously as the SR increased. As a result of SEM analysis, when SR was 50% rather than SR = 0%, the contact between sand particles increased and they were connected to each other. Such contact between these particles resulted in the increase of strength.

An Application Status and Consideration of System Improvement on the Sea Area Utilization Conference and Impact Assessment (해역이용협의제도 운용 현황 분석 및 실효성 제고방안)

  • Lee, Dae-In;Kim, Gui-Young;Jeon, Kyeong-Am;Eom, Ki-Hyuk;Yu, Jun;Kim, Yeong-Tae;Moon, Ju-Hoon;Kam, Min-Jae
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.14 no.4
    • /
    • pp.239-248
    • /
    • 2011
  • This paper evaluated types and characteristics of development projects occurred in coastal area (Public Water) by analyzing an application status of Sea Area Utilization Conference System that effective protect and manage marine environment and ecosystem from various artificial utilization and development enforced in 2008. Also, system improvement for stable settlement and security of efficiency considering exposed problems during system enforcement were diagnosed. The number of Sea Area Utilization Conference (SAUC) performanced during the period of 2009-2010 was 3,705, which consisted of simple SAUC (87.0%), general SAUC (12.8%), and Sea Area Utilization Impact Assessment (SAUIC; 0.2%). The general SAUC was accomplished for Public Water reclamation (43.4%), seawater supply and drainage (17.5%), dredging sediment (5.5%), installation of port facilities (4.6%) and fishing harbor facilities (2.3%), and others (23.4%). Statements of Environmental Impact Assessment (EIA) were reviewed mainly for construction of port facilities (32.9%), followed by construction of industrial complex, development of tourism and leisure complex, road construction, and development of energy facilities. It would be necessary to strengthen effectiveness of the system, advertisement, and capability of conference and review agency, and to enhance confidence of marine EIA continuously, according to the increase of development projects, and diversity and enlargement of development types.