• Title/Summary/Keyword: 댐 저수용량

Search Result 95, Processing Time 0.03 seconds

Potential damage assessment of inland wetlands by topsoil erosion (표토침식에 따른 내륙습지 훼손 가능성 평가)

  • Kim, Seongwon;Jeong, Anchul;Lee, Daeeop;Lee, Giha
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.7
    • /
    • pp.521-531
    • /
    • 2020
  • The purpose of this study is to suggest a quantitative assessment of wetland damage considering the effects of topsoil erosion and deposition from rainfall. In the Cheoncheon Basin located upstream of the Yongdam Dam, 16 wetlands are located, but the lacustrine and small palustrine wetland were analyzed for possible damage to erosion and deposition. As a result of applying typhoon events in 2002 and 2003, the sediment load from the upper basin was the highest at 2.30% (22,548 ㎥) of low water capacity. The average sediment load in the mountain areas was found to be 0.03% of the low water capacity, and it was analyzed to be less damaging than the lacustrine with relatively large watershed. as a result of the model, the lacustrine wetland, where a large area is used as agricultural land, shows a high probability of sediment yield, so it is highly likely to damage the wetland by topsoil erosion.

Identification of Uncertainty on the Reduction of Dead Storage in Soyang Dam Using Bayesian Stochastic Reliability Analysis (Bayesian 추계학적 신뢰도 기법을 이용한 소양강댐 퇴사용량 감소의 불확실성 분석)

  • Lee, Cheol-Eung;Kim, Sang Ug
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.3
    • /
    • pp.315-326
    • /
    • 2013
  • Despite of the importance on the maintenance of a reservoir storage, relatively few studies have addressed the stochastic reliability analysis including uncertainty on the decrease of the reservoir storage by the sedimentation. Therefore, the stochastic gamma process under the reliability framework is developed and applied to estimate the reduction of the Soyang Dam reservoir storage in this paper. Especially, in the estimation of parameters of the stochastic gamma process, the Bayesian MCMC scheme using informative prior distribution is used to incorporate a wide variety of information related with the sedimentation. The results show that the selected informative prior distribution is reasonable because the uncertainty of the posterior distribution is reduced considerably compared to that of the prior distribution. Also, the range of the expected life time of the dead storage in Soyang Dam reservoir including uncertainty is estimated from 119.3 years to 183.5 years at 5% significance level. Finally, it is suggested that the improvement of the assessment strategy in this study can provide the valuable information to the decision makers who are in charge of the maintenance of a reservoir.

Analysis of Runoff Change in YeongSan River Watershed on the Dam Operation (영산강 유역의 댐 운영에 따른 유역 유출 변화 분석)

  • Kim, Nam-Won;Shin, Ah-Hyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.400-400
    • /
    • 2011
  • 영산강 유역은 한강, 낙동강, 금강과 더불어 우리나라 4대강 유역 중의 하나로 전라 남 북도에 걸쳐 위치하고 있어 우리나라 남서부의 수자원 공급 및 용수이용의 큰 비중을 차지하고 있다. 유역 특성상 나주평야와 같이 하천을 따라 평야가 발달되어 곡창지대를 이루고 있으며, 타 유역에 비하여 농경지의 비율이 높기 때문에 용수 이용에 있어 농업용수가 큰 비중을 차지한다. 따라서 영산 본류 및 지천 상류에는 농업용수의 안정적인 공급을 목적으로 제 1단계 영산강수계 대단위 농업종합개발사업에 의하여 4개의 농업전용 댐(장성댐, 나주댐, 담양댐, 광주댐)이 건설되었다. 이들 댐은 농업전용 댐으로 건설되었으나 댐의 규모와 저수 용량을 기준으로 장성댐, 나주댐, 담양댐은 대규모, 광주댐은 중규모의 댐에 속하기 때문에 농업용수의 안정적인 공급뿐만 아니라 시 공간적으로 유역 전체의 유출 변화에 영향을 미칠 것으로 판단된다. 따라서 본 연구에서는 유역모형인 SWAT-K 모형을 이용하여 영산강 유역의 댐 운영이 유역 유출 변화에 미치는 영향을 분석하고자 한다. 장기간의 유출 분석을 바탕으로 모형의 댐 모의기작에 의하여 댐 모의를 제한하여 유역 내에 댐이 없는 상태를 가상으로 모의하여 유역의 자연유량을 산정하고, 이에 따른 유역의 전체 유출 변화에 댐이 미치는 영향을 시 공간적으로 분석하여 유역의 효율적인 수자원 관리에 도움이 되고자 한다.

  • PDF

Determination Scheme of Variable Restricted Water Level during Flood Period of Multipurpose Dam (다목적 댐의 홍수기중 가변제한수위 결정 방안)

  • Gwon, O-Ik;Sim, Myeong-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.6
    • /
    • pp.709-720
    • /
    • 1997
  • When flood control storage lacks for the reservoir operation of multipurpose dams during flood period, the additional flood control storage should be considered for the flexible use of limited storage capacity. Flood period is divided by meteorological characteristics in this study and the water levels for water demand and flood control are investigated for the divided flood period. Based on the investigations, we suggest the variable restricted water level(VRWL) from the considerations of water conservation and flood control which can determine dam operating water level during flood period. This paper presents an application of the methodology to determination of the VRWL during flood period at the Taechong Dam and the results are discussed.

  • PDF

Economic Analysis of Dam Operation Improvement by Dam Downstream River Improvement Works ( I )-Recovered Benefits of Water Supply and Hydropower Generation (댐하류하천정비사업의 댐 운영개선 효과 경제성 분석 (I) -용수공급 및 발전생산 회복편익)

  • Lee, Gwang-Man;Lee, Eul-Rae;Yoo, Seung-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.9
    • /
    • pp.753-763
    • /
    • 2011
  • Allocated water storage of dam at the planning and design stage does not seem to be maintained well at the operation stage because of unexpected critical reasons. A dam is likely to be subject to negative effects caused by changes of dam operation conditions and it is hardly avoidable. Therefore, it must be timely improved to recover its original functions and looked for better alternatives to keep its original roles. Specifically the improper management of river condition degrades flood control capability in a dam and river eco-system. The dam downstream river improvement work is needed for normalizing dam functions and its valuations. This study focuses on estimating water use benefits from recovering its own effective storage buffer restricted for flood control. As the results, the water supply and the hydropower benefits in Imha, Daechung and Youngdam Dam are recovered totally by 19.9 million $m^3$/year and 20.8 GWh/year respectively. Also those results are used for the basic information of the economic analysis in the dam downstream river improvement work.

A Probabilistic Determination of the Active Storage Capacity of A Reservoir Using the Monthly Streamflows Generated by Stochastic Models (월유하량(月流下量)의 추계학적(推計學的) 모의발생자료(模擬發生資料)를 사용(使用)한 저수지(貯水池) 활용(活用) 저수용량(貯水容量)의 확률론적(確率論的) 결정(決定))

  • Yoon, Yong Nam;Yoon, Kang Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.6 no.3
    • /
    • pp.63-74
    • /
    • 1986
  • A methodology for the probabilistic determination of active storage capacity of an impounding reservoir is proposed with due considerations to the durations and return periods of the low flow series at the reservoir site. For more reliable probabilistic analysis the best-fit stochastic generation model of Monte Carlo type was first selected for the generation of monthly flow series, the models tested being the Month Carlo Model based on the month-by-month flow series (Monte Carlo-A Type), Monte Carlo Model based on the standardized sequential monthly flow series (Monte Carlo-B Type), and the Thomas-Fiering Model. Monte Carlo-B Model was final1y selected and synthetic monthly flows of 200 years at Hong Cheon dam site were generated. With so generated 200 years' monthly flows partial duration series of low flows were developed for various durations. Each low flow series was further processed by a nonsequential mass analysis for specified draft rates. This mass analysis furnished the storage-draft-recurrence interval relationship which gives the reservoir storage requirement for a specified water demand from the reservoir during a drought of given return period. Illustrations are given on the application of these results in analyzing the water supply capacity of a particlar reservoir, existing or proposed.

  • PDF

Bias correction of radar rainfall estimates for improvement of rainfall estimation accuracy in shared river between North and South Korea (남북 공유하천 강수량 추정 정확도 향상을 위한 레이더 강수 편의보정 방안 연구)

  • Son, Chan-Young;Jang, Cheol-Ho;Ban, Woo-Sik;Ahn, Je-Sik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.300-300
    • /
    • 2019
  • 남북공유하천인 북한강 및 임진강 유역 남측에는 평화의 댐, 군남댐이 치수목적으로 건설되어 운영되고 있으나 북측의 기상 및 수문정보 획득이 불가하여 홍수대응에 불확실성이 높으며 공유하천상류 북측댐 방류패턴에 많은 영향을 받고 있다. 특히 접경지역 남측에 위치한 군남댐은 상류에 있는 황강댐에 비해 저수용량이 작고 우리나라 최북측 수위관측지점(필승교)에서 군남댐까지의 홍수도달시간은 1시간 이내로 예 경보 등 사전 대응에 한계가 있어 북측의 정보가 무엇보다 중요하다. 북측 강우상황 파악 및 위기대응 능력 강화를 위하여 실제 K-water는 기상청 관할 레이더(광덕산)를 활용한 접경지역 댐 유역 강우추정 및 홍수분석 체계를 구축하여 현업에 활용 중이나 실제 관측 강우량 대비 정량적인 차이를 보임에 따라 황강댐 방류 규모 및 군남댐 유입량 예측에 많은 한계가 있다. 따라서, 본 연구에서는 보다 정확한 임진강 상류 북측 강수량 추정을 위하여 기상청 관할 광덕산 레이더에서 얻어지는 군남댐 유역의 추정 강수량(Radar-AWS Rainrate; RAR)에 대하여 통계적 편의보정을 수행하였다. 본 연구에서 적용한 통계적 편의보정기법은 '확률분포형을 활용한 기법', '매개변수적 기법', '비매개변수적 기법' 등 크게 3가지로 구분할 수 있으며 세부적으로 총 11가지 기법을 적용하여 분석을 수행하였다. 분석결과, 일부 기법을 제외하고는 보정 전에 비해 정량적으로 레이더 강수량의 정확도가 향상된 것으로 나타났으며 특히 매개변수적 편의보정기법이 우수한 결과(결정계수: 0.9898)를 보였다. 비매개변수적 편의보정기법은 상대적으로 관측자료가 적어 과거기간에 발생하지 않은 이상치가 발생할 경우 비현실적인 강수로 편의보정되므로 충분한 자료가 축적된 이후 활용가능할 것으로 판단된다. 본 연구의 결과는 북한댐 수문 운영패턴 예측, 접경지역 홍수모의 및 홍수대응 등 치수적인 측면에서 활용도가 높을 것으로 판단된다.

  • PDF

Analysis of Water balance at Kwoesan Dam(2019) (2019년 괴산댐 유역 물수지 분석)

  • Hwang-Bo, Jong Gu;Kim, Ji Hun;Kim, Ki Young;Shin, In Jong;Myung, Moon Soo;Kim, Min Gyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.263-263
    • /
    • 2020
  • 댐 유역 수문자료는 댐의 효율적인 운영, 중장기 댐 운영 계획, 수자원 관리, 댐 저수량 예보 등에 사용된다. 댐의 주요 수문자료로는 일반적으로 유입량인 강수량과 유량으로 구성되어있으며 유출량인 방류량, 증발량, 토양수분량으로 구분한다. 현재 강수량, 유량, 방류량은 지속적으로 계측하고 있으나 증발산량과 토양의 저류량 등은 실제적으로 측정의 어려움을 가지고 있다. 본 연구에서는 실측자료를 물수지 방정식에 대입해 발생한 잔차를 통해 산출한 증발산량과 비교적 정확성이 높다고 알려져 있는 GLDAS NOAH 지형 모형자료에서 산정된 증발산량간의 비교를 수행하였다. 또한 이렇게 각각 산정한 증발산량으로 월별로 물수지 분석을 정량화하여 분석하였다. 유량자료는 후영교 수위관측소의 자료, 강수량은 괴산군(청천면사무소) 강수량관측소 외 15개소 자료, 댐 방류량자료 등의 실측자료를 사용하였으며, 증발량은 GLDAS NOAH 지표면 model을 이용하여 산정하였다. 저수지 토양수분량은 자료가 없어 고려하지 않았다. 2019년 괴산댐 유역의 총 유입량은 218.54 백만㎥이며, 증발량을 고려한 총 유출량은 200.50 백만㎥으로 나타나 댐의 저류량은 18.05 백만㎥으로 나타났다. 그러나 실제 저수지의 수위-저수용량 곡선식을 이용하여 계산된 총 저류량은 0.06 백만㎥으로 상당한 차이를 보이고 있다. 이 원인으로 1. 증발량 추정자료 사용, 2. 토양저류량 미 고려, 3. 자료가 없는 취수량 미 고려 4. 유량, 방류량, 강수량 자료 오차 등이 있는 것으로 판단된다. 한편, GLDAS NOAH 지표면 model을 이용한 연 저수지증발량과 물 수지 방적식을 이용한 연 저수지증발량은 각각 0.79 백만㎥, 18.84 백만㎥으로 나타나, 역시 차이를 보인다. 이는 물 수지 방정식을 이용한 연 저수지증발량은 토양수분증발량 미 고려에 따른 것과 GLDAS NOAH 지표면 model자료는 직접적인 실측 자료가 아닌 추정 자료로 다소 오차가 있을 것으로 생각된다. 댐 유역 물의 이동을 추적하고 이를 정량적으로 나타내는 것은 결과적으로 효율적인 댐 운영을 가능하게 한다. 그러나 최근 실시되는 유량측정과는 달리 물 수지 분석의 주요 인자인 증발량과 토양수분량 등은 측정이 전무하여 여러 가지 방법으로 추정하는 현실이다. 추후 이러한 수문자료를 실측하여 제공한다면 댐 관리 및 중장기 댐 운영 계획 수립 등 효율적인 댐 운영에 대단히 유용할 것으로 기대된다.

  • PDF

Mix Design and Physical Properties of Concrete Used in Seongdeok Multi-purpose Dam (성덕 다목적댐 콘크리트의 배합설계 및 역학적 특성)

  • Kim, Jin-Keun;Jang, Bong-Seok;Ha, Jae-Dam;Ryu, Jong-Hyun;Go, Suk-Woo;Kim, Jeong-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.517-520
    • /
    • 2008
  • Gravity dam use self weight to stand external force like hydraulic pressure. In general, gravity dam concrete is divided into internal and external concrete. Seongdeok dam is gravity dam which is being constructed in Cheongsong-gun, Gyeonsangbuk-do. And upstream cofferdam was constructed to examine the temperature crack due to hydration heat and to decide the height of placement. In this study, we examined the mix design of internal/external concrete and physical properties(compressive strength, adiabatic temperature rise). And we also performed laboratory tests to verify exothermic properties. Lastly, we measured the hydration heat and thermal stress of upstream cofferdam.

  • PDF

Development and application of inflow drought index considering the dam operation rule coping with the drought (가뭄대응 댐 운영기준을 고려한 유입량 가뭄지수의 개발 및 적용)

  • Kown, Minsung;Jun, Kyung Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.56-56
    • /
    • 2017
  • 홍수와 달리 가뭄은 장기적인 강수량 부족에 의해 발생하는 자연해로, 불확실성이 큰 장기(계절) 기상예보를 토대로 대비하기는 어려운 것이 현실이다. 가뭄에 대비하기 위해 가뭄의 진행상황을 관찰할 수 있는 다양한 가뭄지수가 활용되고 있다. 가뭄은 기상학적 가뭄, 농업적 가뭄, 수문학적 가뭄, 사회경제학적 가뭄으로 분류되고, 이를 정량적으로 평가하고 가뭄의 진행상황을 파악하기 위해 강수량, 유출량, 저수지의 저수량, 지하수, 토양수분 등 다양한 인자들이 사용된다. 일반적으로 널리 사용되고 있는 가뭄지수는 평균에 대한 부족한 정도를 지수화해서 나타낸다. 하지만 우리가 가용할 수 없는 많은 양의 강수량 및 유출량(또는 저수지 유입량)이 가뭄지수를 산정하는 기간 동안 지속적으로 영향을 주게 된다. 이는 짧은 기간 동안 매우 많은 강수 후 가뭄이 지속 되었을 경우, 이를 정상의 상태로 나타낼 수 있다는 것을 의미한다. 이와 같은 가뭄지수를 통해 가뭄에 대처하기 위한 기준을 수립하기에는 한계가 있음을 나타낸다. 우리나라의 경우 취수량의 대부분을 댐과 하천수에 의존한다. 하천수량이 댐의 방류량에 의한 의존도가 높은 현실에서 우리가 체감하는 가뭄은 댐의 용수확보와 공급에 가장 큰 영향을 받는다고 할 수 있다. 댐은 용량의 제한이 있으며, 계획된 용수공급량과 저수량 부족 시 용수공급을 조절하는 기준이 있다. 따라서 과거 관측된 유입량과 용수공급 계획량, 용수공급 조정 기준을 통해 저수지 운영을 모의하게 되면, 용수공급을 감축하는 시점을 확인 할 수 있다. 이를 활용하여 적절한 유입량의 상한계를 설정할 수 있으며, 이는 가뭄에 대비하는 댐 운영에 활용할 수 있는 가뭄지수로 활용할 수 있다. 이는 댐의 용수 공급과 직접적으로 연관되어 있으므로, 체감할 수 있는 가뭄전달 도구로 활용이 가능하다. 이와 같이 제시된 유입량 가뭄지수를 기존의 대표적인 가뭄지수와 비교하여 활용성을 평가하였다. 우리가 사용할 수 있는 물이 부족한 현상을 '물부족'으로 표현하고, 강수량의 부족을 '가뭄'으로 표현해야 한다는 주장이 있다. 하지만 강수량 부족에 기인한 물부족을 가뭄으로 표현하고 이를 정량적으로 나타내는 것이 가뭄에 대처해야하는 용수 관리자에게 유용할 뿐만 아니라, 일반 국민들에게 체감할 수 있는 가뭄정보를 제공하는데 도움이 될 것이다.

  • PDF