• Title/Summary/Keyword: 댐 여수로

Search Result 97, Processing Time 0.032 seconds

Effect of Corrected Hydrostatic Pressure in Shallow-Water Flow over Large Slope (대경사를 지나는 천수 흐름에서 수정된 정수압의 효과)

  • Hwang, Seung-Yong
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.12
    • /
    • pp.1177-1185
    • /
    • 2014
  • This study suggests a new hydrostatic pressure distribution corrected for nonuniform flow over a channel of large slope. For analyzing shallow-water flows over large slope accurately, it is developed a finite-volume model incorporating the pressure distribution to the shallow water equations. Traveling speed of the hydraulic jump downstream a parabolic bump in the drain case is quite reduced by the weakened bottom gradient source term in the model with the pressure correction. In simulating the dam-break flow over a triangular sill, it is identified that the model with pressure correction could capture the water surface by the digital imaging measurements more than the model without that. Due to the pressure correction decreasing the reflected flows on and increasing overflows over the sill, there are good agreements in the experiment and the simulation with that. Therefore, this model is expected to be applied to such practical problems as flows in the spillway of dam or run-up on the beach.

Synergistic gains from the Real-time Coordinated Multiple Reservoir Operation in Nak-Dong River Basin (낙동강 수계 실시간 댐군 최적 연계 운영의 시너지 효과)

  • Kim Sheung-Kown;Lee YongDae;Park Myung-Ky
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.289-293
    • /
    • 2005
  • 본 연구에서는 일별 저수지군 최적연계운영 모형(CoMOM 4.0 : Coordinated Multireservoir Operating Model version 4.0)을 낙동강 수계 실시간 일별 운영에 CoMOM을 적용할 경우를 상정하여, 불확실성을 고려한 실시간 모의 운영을 수행하였다. 실시간 일 운영 시 며칠 정도의 유입량 예측은 가능할 것으로 예상하여 유입량 예측일수의 정확도 증가에 따른 연계 운영 효과를 산정해 본 결과, 전반적으로 과거 실적치에 비하여는 좋지만, 예측일 수가 늘어남에 따라 수계 내 연간 평균 저수량은 감소하는 대신 평균 발전량은 증가하여, 연계운영 총체적 효과가 기하급수적으로 증가됨을 알 수 있었다. 미래 유입량을 전혀 예측하지 못할 경우에는 일평균 유입량을 예측 유입량으로 하여 실시간 댐군 연계모의운영을 하였고, 그 경우에도 여수로 방류로 인한 수계 외 유출을 연 평균 약 214백만$m^3$ 정도 감소시키는 반면, 수계 내 전체 댐 군의 평균저수량을 55백만$m^3$ 증가 시키며, 연간 평균 발전량은 25GWh (약 22.5억원/년의 추가 발전수입) 증가 시킬 수 있을 것으로 분석되었다.

  • PDF

Simulating inundation depth and area in paddy fields considering back flows (역류를 고려한 논 침수 모의 해석 방법)

  • Noh, Jaekyoung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.31-31
    • /
    • 2021
  • 2020년 8월 7일부터 8월 8일까지 호우는 용담댐, 섬진강댐, 합천댐 등 하류 유역의 농경지에 막대한 침수피해를 일으켰다. 특히 논의 인삼재배 지역은 피해가 컸다. 지역에 따라 내수유입, 제방월류, 배수로 역류, 용수로 유입 등 유입량 과다의 침수 현상을 나타냈다. 여기서 이들 다양한 유입량 요소를 고려하여 제내지의 침수심, 침수면적을 모의할 수 있는 물수지 모형을 구축하였고, 하천 수위관측자료가 있는 금산 지역에 적용한 예를 제시하고자 한다. 물수지 모형의 구성은 저류량은 유입량과 방류량으로 구성되며, 유입량은 자체유입, 용수로 유입, 배수로 역류, 제방월류 등으로 구성하였고, 용수로, 배수로의 수문은 원형, 구형 두 가지로 개도에 따라 오리피스 공식을 적용하는 것으로, 제방월류는 여수로 공식의 계수를 조정 적용하는 것으로 하였다. 제내지 내용적은 1:1,000 지형도에서 DEM 자료를 추출하여 생성하였고, 자체유입량은 ONE 모형에 의해 10분 단위로 모의하는 것으로 하였다. 모형 적용 결과는 제원리 제내지 경우이며, 8월 6일 부터 8월 10일 까지 유역면적 322.1ha인 제내지의 10분 간격 물수지 분석 결과, 현장의 침수흔적 조사의 최고수위가 일치하도록 배수문과 배수통관의 방류시 개도율을 조정하며 분석하였다. 이 상태의 침수위 모의 분석결과는 월류고 EL.133.86 m, 월류길이 29m로 나타났다. 10분 최대 강우량 9mm, 1시간 최대 강우량 19mm, 총 강우량 225mm(724,725m3)였고, 10분 최대 유입량 5.619m3/s(3,371m3), 평균 1.264m3/s(758m3), 총545,933m3였다. 용수로 유입은 없었고, 배수문 역류 유입량은 13시간 50분 동안, 10분 최대 6,836m3, 총 28.26만m3였고, 제방월류 유입량은 9시간 30분 동안, 10분 최대 7,212m3, 총 33.15만m3였고, 배수문 방류량은 3일 20시간 20분 동안, 10분 최대 19,932m3, 총 116.13만m3였다. 하천수위는 최고 EL.134.45m, 최소 EL.128.51m, 평균 EL.130.69m였고, 내수위는 최고 EL.134.05m, 최소 EL.129.00m, 평균 EL.131.02m였다. 최고 침수위 EL.134.05m일 때 DEM으로부터 침수면적은 38.88ha로 분석되었다. 내수 유입에 의한 침수면적 19.54ha를 빼면 10.71ha가 배수문과 제방월류를 통해 유입된 수량으로 침수된 것으로 분석되었다.

  • PDF

Dynamics of Phosphorus-Turbid Water Outflow and Limno-Hydrological Effects on Hypolimnetic Effluents Discharging by Hydropower Electric Generation in a Large Dam Reservoir (Daecheong), Korea (대청호 발전방류수의 인·탁수 배출 역동성과 육수·수문학적 영향)

  • Shin, Jae-Ki;Hwang, Soon-Jin
    • Korean Journal of Ecology and Environment
    • /
    • v.50 no.1
    • /
    • pp.1-15
    • /
    • 2017
  • Daecheong Reservoir was made by the construction of a large dam (>15 m in height) on the middle to downstream of the Geum River and the discharge systems have the watergate-spillway (WS), a hydropower penstock (HPP), and two intake towers. The purpose of this study was to investigate the limnological anomalies of turbid water reduction, green algae phenomenon, and oligotrophic state in the lower part of reservoir dam site, and compared with hydro-meteorological factors. Field surveys were conducted in two stations of near dam and the outlet of HPP with one week intervals from January to December 2000. Rainfall was closely related to the fluctuations of inflow, outflow and water level. The rainfall pattern was depended on the storm of monsoon and typhoon, and the increase of discharge and turbidity responded more strongly to the intensity than the frequency. Water temperature and DO fluctuations within the reservoir water layer were influenced by meteorological and hydrological events, and these were mainly caused by water level fluctuation based on temperature stratification, density current and discharge types. The discharges of WS and HPP induced to the flow of water bodies and the outflows of turbid water and nutrients such as nitrogen and phosphorus, respectively. Especially, when hypoxic or low-oxygen condition was present in the bottom water, the discharge through HPP has contributed significantly to the outflow of phosphorus released from the sediment into the downstream of dam. In addition, HPP effluent which be continuously operated throughout the year, was the main factor that could change to a low trophic level in the downreservoir (lacustrine zone). And water-bloom (green-tide) occurring in the lower part of reservoir was the result that the water body of upreservoir being transported and diffused toward the downreseroir, when discharging through the WS. Finally, the hydropower effluent was included the importance and dynamics that could have a temporal and spatial impacts on the physical, chemical and biological factors of the reservoir ecosystem.

A Study on Drainage Capability of Large Capacity Outlet and Spillway of Dams in Korea (한국댐의 대용량 배수시설 및 Spillway 배수능력에 관한 조사연구)

  • 이원환
    • Water for future
    • /
    • v.11 no.2
    • /
    • pp.43-53
    • /
    • 1978
  • Synopsis: This study has systemized the results of construction and classification with 656 large dams in Korea which were defined in ICOLD provision. Especially, checking up the drainage capability of large capacity outlets and its of spillway, this paper suggests the planning of outflow discharge with large capacity outlets and spillway in future. The results of this study are following as; 1. The classification by purposes in Korea shows that irrigation dams are 94% in rate(607 dams), jydropower and multipurpose dams are 2% (14 dams), municipal and industrial water supply dams are 4% (26 dams). 2. In design of proposed outflow discharge, spillways of irrigation dams were selected outflow discharge on 100 years return period, those of municipal and industrial water supply dmas 200 years and those of hydropower and multipurpose dams 500 years or 1000 years. 3. Emergency spillway should be considered in the fields of disaster prevention engineering and the rank of return periods for the emergency proposed out flow discharge was suggested. 4. Some of problems are suggested for this subject in future.

  • PDF

Availability test of eco-levee construction for presevation of bangudae petroglyphs (생태제방을 이용한 반구대암각화 보존방안 연구)

  • Lee, Seung-Oh;Chegal, Sun-Dong;Cho, Hong-Je
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.11
    • /
    • pp.931-939
    • /
    • 2016
  • Bangudae Petroglopys of the national treasure No. 285 located in elevation of 53 m to 57 m have been damaged by repetition of submergence and exposure due to the Sayeon-dam of EL.60 m constructed in down stream. In this study, as a preservation plan of the petroglyphs from the contact with water, the construction of eco-levee was suggested and its effect was investigated in the views of hydraulic engineering. It was designed to be located aside of 80 m from Bangudae Petroglyphs with the length of 440 m in streamwise direction, and it was need to construct a new channel maintaining the original hydraulic capacity and conveyance. Hydraulic characteristics such as water surface elevations and velocities near Bangudae Petroglyphs were measured after the eco-levee was installed in the hydraulic model with the scale of 1:50. It showed that there were not much changes of water surface elevations and velocities between sayeon-dam spillway EL. 60 m (Suggestion 1) and EL. 54 m (Suggestion 2). It was concluded the eco-levee could be made of natural materials like soil, pebble, gravel in terms of allowable velocity and shear stresses. The slope of water surface at Suggestion 2 was steeper, and velocities near Bangudae Petroglyphs were also faster than Suggestion 1. As the vorties occured at the left side in Suggestion 2, more detailed study is required.

A Mathematical Model for Coordinated Multiple Reservoir Operation (댐군의 연계운영을 위한 수학적 모형)

  • Kim, Seung-Gwon
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.6
    • /
    • pp.779-793
    • /
    • 1998
  • In this study, for the purpose of water supply planning, we propose a sophisticated multi-period mixed integer programming model that can coordinate the behavior of multi-reservoir operation, minimizing unnecessary spill. It can simulate the system with operating rules which are self- generated by the optimization engine in the algorithm. It is an optimization model in structure, but it indeed simulates the coordinating behavior of multi-reservoir operation. It minimizes the water shortfalls in demand requirements, maintaining flood reserve volume, minimizing unnecessary spill, maximizing hydropower generation release, keeping water storage levels high for efficient hydroelectric turbine operation. This optimization model is a large scale mixed integer programming problem that consists of 3.920 integer variables and 68.658 by 132.384 node-arc incidence matrix for 28 years of data. In order to handle the enormous amount of data generated by a big mathematical model, the utilization of DBMS (data base management system)seems to be inevitable. It has been tested with the Han River multi-reservoir system in Korea, which consists of 2 large multipurpose dams and 3 hydroelectric dams. We demonstrated successfully that there is a good chance of saving substantial amount of water should it be put to use in real time with a good inflow forecasting system.

  • PDF

A Study on the Management Method of Agricultural reservoir Using RCP Scenario (RCP 시나리오 분석을 통한 농업용 저수지 관리방안에 관한 연구)

  • Choo, Yeon Moon;Won, Chang Hee;Kim, Seong Ryul;Gwon, Chang Heon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.1
    • /
    • pp.28-34
    • /
    • 2020
  • A reservoir is defined as an artificial facility that stores and controls water during floods and droughts. Korea has constructed and managed reservoirs all over the country to benefit farming communities. The importance of reservoirs has decreased gradually due to urbanization and the spread of tap water, but the importance of water is increasing because of the recent shortage of water and the resulting rise in the price of water resources. Therefore, this study suggests countermeasures through an analysis of the used threshold for agricultural reservoirs. To this end, the forecast of rainfall up to 2100 was first analyzed using flood estimates and RCP scenarios through rainwater data collection. The increase in the RCP 8.5 scenario, the largest increase in the probability rainfall, was calculated by adding it to the current probability rainfall, and it was predicted that the marginal height of Odong Dam would reach its limit in 2028. Therefore, as a countermeasure against this, the measures to secure effective water storage were suggested through measures, such as lowering the height of Yeosu and installing movable beams. Overall, it is expected that effective management of the reservoirs used for agriculture will be possible in the future.

Development of Hydrological Safety Evaluation Model for Agricultural Reservoir (농업용저수지의 수문학적 안전성 평가를 위한 계수화 모델 산정)

  • Park, Jong Seok;Rhee, Kyoung Hoon;Lee, Jae Ju;Shim, Choon Seok;Jin, Wan Gyu;Hu, Shin Young
    • Journal of Wetlands Research
    • /
    • v.17 no.2
    • /
    • pp.130-138
    • /
    • 2015
  • According to the "Safety Evaluation Detailed Instructions (Dam)", a precise safety inspection is carried out for dams that exceed a certain scale. However, as the Hydrological Safety Evaluation from various evaluation standards is designed to evaluate the safety of existing dams considering PMF(Probable Maximum Flood), the evaluation is much less applicable for most agricultural reservoirs. Therefore, the Hydrological Safety Guidelines for agricultural reservoirs are expected to be re-evaluated considering the diverse risk factors with the coefficient model and AHP(Analytic Hierarchy Process) in this study. The coefficient model has been developed by selecting the hydrological safety superordinate subordinate evaluation factors to reflect diverse risk factors of agricultural reservoirs. This study indicated that in the short term, improving the safety check condition evaluation grade will be useful to improve the hydrological safety of the agricultural reservoir because it can be performed immediately.

Prediction of Ultimate Scour Potentials in a Shallow Plunge Pool (얕은 감세지내의 극한 세굴잠재능 예측)

  • 손광익
    • Water for future
    • /
    • v.27 no.1
    • /
    • pp.123-131
    • /
    • 1994
  • A plunge pool is often employed as an energy-dissipating device at the end of a spillway or a pipe culvert. A jet from spillways or pipes frequently generates a scour hole which threatens the stability of the hydraulic structure. Existing scour prediction formulas of plunge pool of spillways or pipe culverts give a wide range of scour depths, and it is, therefore, difficult to accurately predict those scour depths. In this study, a new experimental method and new scour prediction formulas under submerged circular jet for large bed materials with shallow tailwater depths were developed. A major variale, which was not used in previous scour prediction equations, was the ratio of jet size to bed material size. In this study, jet momentum acting on a bed particle and jet diffustion theory were employed to derive scour prediction formulas. Four theoretical formulas were suggested for the two regions of jet diffusion, i.e., the region of flow establishment and the region of established flow. The semi-theoretically developed scour prediction formulas showed close agreement with laboratory experiments performed on a movable bed made of large spherical particles.

  • PDF