• Title/Summary/Keyword: 대책공법

Search Result 253, Processing Time 0.024 seconds

Analysis of River Levee Failure Mechanism by Piping and Remediation Method Evaluation (파이핑에 의한 하천제방 붕괴 메카니즘 분석 및 대책공법 평가)

  • Kim, Jin-Man;Moon, In-Jong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.3
    • /
    • pp.600-608
    • /
    • 2017
  • The presence of piping in a levee body allows water seepage to occur by producing a large cavity or water tunnel within it, ultimately resulting in the failure of the river levee and differential settlement. In order to properly cope with river levee failure due to piping and establish a proper remediation method for this problem, it is necessary to analyze the failure mechanism of the river levee due to piping. Therefore, this study analyzed the shape and mechanism of river levee failure due to piping through small-scale and large-scale models and evaluated the seepage pressure distribution characteristics in the hydraulic well, which has been suggested as a remediation method for piping. According to the results of this study, as the safety factor for the piping in the river levee decreased, the river levee failure shape was more clearly shown through the small-scale model test. In the large-scale model test, the type of local damage to the levee due to the piping was identified and the evaluation showed that the hydraulic well had the largest effect on the inhibition of piping below the center of the well. A follow-up study is needed to confirm the reliability of the results. However, it is thought that this study can be utilized as the baseline data for research into the piping-induced river levee failure mechanism and for the preparation of a remediation method.

TBM risk management system considering predicted ground condition ahead of tunnel face: methodology development and application (막장전방 예측기법에 근거한 TBM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Park, Jeongjun;Lee, Kang-Hyun;Park, Jinho;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.1-12
    • /
    • 2016
  • When utilizing a Tunnel Boring Machine (TBM) for tunnelling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These include fractured zones or mixed ground conditions that are likely to reduce the stability of TBM excavation, and result in considerable economic losses such as construction delays or increases in costs. Minimizing these potential risks during tunnel construction is therefore a crucial issue in any mechanized tunneling project. This paper proposed the potential risk events that may occur due to risky ground conditions. A resistivity survey is utilized to predict the risky ground conditions ahead of the tunnel face during construction. The potential risk events are then evaluated based on their occurrence probability and impact. A TBM risk management system that can suggest proper solution methods (measures) for potential risk events is also developed. Multi-Criterion Decision Making (MCDM) is utilized to determine the optimal solution method (optimal measure) to handle risk events. Lastly, an actual construction site, at which there was a risk event during Earth Pressure-Balance (EPB) Shield TBM construction, is analyzed to verify the efficacy of the proposed system.

Landslide Disaster Countermeasures in Korea (한국(韓國)의 산사태방재대책(山沙汰防災對策)에 관한 연구(研究))

  • Woo, Bo Myeong
    • Journal of Korean Society of Forest Science
    • /
    • v.63 no.1
    • /
    • pp.51-60
    • /
    • 1984
  • Analysing the reports of disaster-related, average annual death of lives due to the meteorological disasters amounted to be 250, of which about 90 were due to landslide. According to the last 10-year reports, the average area of landslide occurred reaches 275 hectares per year in Korea. The total cost for rehabilitation could annually require more than about 2 billion Won (about US$ 2.5 million). The basic countermeasure policy against such heavy disasters should be definitely taken on prevention rather than rehabilitation after being damaged. However, prevention countermeasures against landslide-related disasters have not been strengthened in Korea although being important. Areas of high landslide hazard must be designated with increase in number from current 10 (35 cities and counties) to 17 (68 cities and counties included : Table 3). Number of regional Erosion Control Stations taking full charge of rehabilitating works on the damaged land resulted from landslide disaster has to increase from currently 15 stations to 25. The stone buttressed terrace structures on the hillside slopes, being typical erosion control measures in Korea have been recently recognized as one of the most effective rehabilitation measures for the land damaged by landslides.

  • PDF

Slope Stability for Bridge Access Road on Sedimentary Rocks using Geological Cross Sections (지질단면을 이용한 교량 접속도로 퇴적암 비탈면의 안정성 검토 연구)

  • Ihm, Myeong Hyeok
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.1
    • /
    • pp.507-512
    • /
    • 2022
  • The subjects of the study are the sedimentary rock slope of the Mesozoic Gyeongsang Supergroup, which has a high risk of failure. The rocks of the slope shall be sandstone, siltstone and dacite, and discontinuities shall develop beddings, shear joints, extension joints, and dacite dyke boundary planes. The type and scale of failure varies depending on the type of rock and the strike/dip of the discontinuities, but the planar failure prevails. Based on the face-mapping data, SMR, physical and mechanical testing of rocks, the critical equilibrium analysis, all representative sections required a countermeasure method because the acceptable safety factor during dry and rainy seasons were far below Fs=1.5 and Fs=1.2. After applying the countermeasure method, both the dry and wet conditions of the slope exceeded the allowable safety factor. In particular, the face-mapping data of the slope-face, the geological cross-sections of several representative sections perpendicular to the slope-face, and the critical equilibrium analysis and the presentation of countermeasure methods that have been reviewed based on them are expected to be reasonable tools for the slope stability.

Development of the Guiding System for the Counter-Construction Method Stabilizing Slopes (사면안정 대책공법 안내시스템 개발)

  • Ji, Young-Hwan;Hur, Tae-Sung;Hwang, Yeong-Cheol;Tscha, Yeong-Hwan;Lee, Seung-Ho
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2007.10c
    • /
    • pp.159-162
    • /
    • 2007
  • 상지대학교 #낙석 및 산사태 방재연구단#에서는 #건설교통부 지역기술혁신사업#의 일환으로 사계절 낙석과 산사태 위험에 노출되어 있는 강원지역의 주요 도로 사면에 대한 재해를 저감하기 위하여 통합 사면관리기술, 광역산사태 저감기술 및 사면 안정성중대기술을 개발하고 있다. 본 논문은 강원지역의 최근 5년간 시공된 주요 사면별 178종의 애트리뷰트들의 정보를 Database화하고 이를 활용하여 시공 예정인 특정 사면과 환경조건이 유사한 사면에 적용하였던 공법들과 이에 따른 유지보수 내역과 안정성 등의 정보를 제공하는 사면정보 검색시스템의 설계와 구현에 관한 것이다. 검색의 효율성을 위해 18종의 중요 애트리뷰트들을 선정하고, 이들을 선택형과 기재형으로 분류한 후, 공법들간의 유사도(일치도)를 측정하는 방안을 도입하였다.

  • PDF

Case Study on Embankment Slope Failure by Heavy Rainfall (집중호우에 의한 성토사면 붕괴사례)

  • Park, Jong-Ho;Chang, Buhm-Soo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.626-631
    • /
    • 2006
  • 본 연구는 2006년 7월 집중호우에 의해 많은 인적.물적 피해가 발생한 강원도 지역의 피해 현장을 조사하였으며, 그 중 성토사면붕괴를 붕괴유형별로 구분하고 발생원인과 특성을 분석하여 그에 따른 적절한 대책방안을 제시하였다. 집중호우에 의한 성토사면의 붕괴유형 중 토석류에 의한 도로횡단 배수구조물의 기능상실로 유수가 노면으로 침출되고 수압이 발생하여 도로가 유실된 유형과 하천선형 불량으로 만곡수충부(물이 직접 부딪히는 부분)에서 유속이 빨라져 세굴에 의한 붕괴가 전체성토붕괴사면의 83%를 차지하였다. 이에 대한 대책방안으로는 토석류를 계곡상부에서 부터 예방할 수 있는 방법으로 사방댐 및 그물망 공법 등이 좋은 대책방안이 될 수 있으며, 토석류에 의한 유송잡물을 모두 통과할 수 있도록 충분히 큰 배수시설을 설치하는 방법도 좋은 대책방안이 될 수 있다. 무엇보다 열대성 국지 폭우를 이제 일상의 한반도 기후현상으로 받아들여 주먹구구식의 일회성 대책방안을 지양하고 바뀐 강우특성과 빈도를 고려하여 계획 홍수위를 재산정하고 그에 따라 하천정비계획을 재검토해야 할 것이다.

  • PDF

해빈침식해역에서의 대책수립을 위한 수치해석

  • Kim, Hui-Jae;An, Hyo-Jae;Kim, Gang-Min;Lee, Jung-U
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2014.10a
    • /
    • pp.9-11
    • /
    • 2014
  • As Daecheon beach, which is the study area, has problem of erosion and loss of most beach under the extraordinary wave during the typhoon event, it is necessary to apply erosion control measures for short term impact. Therefore, we analyzed the status and reason of the erosion by field survey, collection of hydraulic model test, and numerical model experiment. For the erosion control measure, we adopted beach feeding and submerged reef method available at that site among various counter measures. Numerical analyses were made for both beach feeding only and beach feeding with submerged reefs and these were compared with the present status to find out the optimum design and to contribute for preparing a long term plan of beach loss protection.

  • PDF

중소어항의 항내매몰 방지대책

  • 윤성진;김규한;편종근
    • Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
    • /
    • 1997.10a
    • /
    • pp.63-67
    • /
    • 1997
  • 파랑이 탁월한 영역에 존재하는 중소어항의 대부분을 항내매몰이 중요문제 중의 하나로서, 입ㆍ출항의 곤란 및 반복되는 준설경비의 소요 등으로 경제적 문제를 겪고있다. 따라서 이와 같은 문제를 장기적으로 해결하기 위해서는 항내매몰의 근본적 원인을 빠른 시일 내에 정확히 파악하고, 그 대책공법을 강구할 필요가 있다. 본 연구는 이러한 문제를 해결하기 위해 파랑 및 연안류제어 구조물의 설치 및 배치 등을 이용한 항내매몰 방지대책을 설정하여 각각의 연안류 및 해빈변형제어효과를 검토하고 항내매몰에 미치는 영향을 검토해 보았다. (중략)

  • PDF

The Behaviour Characteristics of Reinforced Limestone Cavities by High Pressure Jet-Grouting (고압분사주입공법으로 보강된 석회암공동의 거동특성)

  • Hong, Won-Pyo;Hong, Kun-Pyo;Yea, Geu-Guwen
    • The Journal of Engineering Geology
    • /
    • v.18 no.1
    • /
    • pp.7-16
    • /
    • 2008
  • Limestone area have mostly certain geological defects such as the internal cavities due to melting and fractured zone by external pressures. Especially, in case of constructing grand bridge, the treatment of the limestone cavities area having the geological defects is inevitable. In order to reduce foundation settlement and to reinforce the ground in the limestone cavities area, high pressure jet grouting has been carried out as a countermeasure method. Despite the fact that high pressure jet grouting method has already adopted at a lot of limestone cavities area, but the amount of research and technical data on the high pressure jet grouting have not been accumulated properly so for. Therefore this paper intends to investigate the strength characteristics and deformation characteristics for reinforced limestone cavities area by high pressure jet grouting method. In addition, load carrying capacity obtained by static pile load test with load transfer measuring system is analyzed.