Verifying the Classification Accuracy for Korea's Standardized Classification System of Research F&E by using LDA(Linear Discriminant Analysis) (선형판별분석(LDA)기법을 적용한 국가연구시설장비 표준분류체계의 분류 정확도 검증)

  • Joung, Seokin;Sawng, Yeongwha;Jeong, Euhduck
    • Management & Information Systems Review
    • /
    • v.39 no.1
    • /
    • pp.35-57
    • /
    • 2020
  • Recently, research F&E(Facilities and Equipment) have become very important as tools and means to lead the development of science and technology. The government has been continuously expanding investment budgets for R&D and research F&E, and the need for efficient operation and systematic management of research F&E built up nationwide has increased. In December 2010, The government developed and completed a standardized classification system for national research F&E. However, accuracy and trust of information classification are suspected because information is collected by a method in which a user(researcher) directly selects and registers a classification code in NTIS. Therefore, in the study, we analyzed linearly using linear discriminant analysis(LDA) and analysis of variance(ANOVA), to measure the classification accuracy for the standardized classification system(8 major-classes, 54 sub-classes, 410 small-classes) of the national research facilities and equipment established in 2010, and revised in 2015. For the analysis, we collected and used the information data(50,271 cases) cumulatively registered in NTIS(National Science and Technology Service) for the past 10 years. This is the first case of scientifically verifying the standardized classification system of the national research facilities and equipment, which is based on information of similar classification systems and a few expert reviews in the in-outside of the country. As a result of this study, the discriminant accuracy of major-classes organized hierarchically by sub-classes and small-classes was 92.2 %, which was very high. However, in post hoc verification through analysis of variance, the discrimination power of two classes out of eight major-classes was rather low. It is expected that the standardized classification system of the national research facilities and equipment will be improved through this study.

The Private-Initiated Park Development Project in Terms of Securing Publicity Operation Characteristics Analysis - Busan Metropolitan City as a Case - (공공성 확보측면에서 민간공원특례사업 운영특성분석 - "부산광역시를 사례로" -)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.1
    • /
    • pp.13-28
    • /
    • 2023
  • This study examines the process of project promotion in Busan, which introduced the private participation-type consultative body for the first time in the country in the promotion stage of the private-initiated park development project, and introduced flexible application of the system and differentiated policy elements in the implementation process, and examines the operational characteristics and we tried to analyze performance, etc. As a result of the analysis, first, the preferred bidder was selected by introducing a mixed method in the project method, which is an independent project method that cannot be seen in other local governments. Second, by specifying guidelines considering the characteristics of each park and detailed guidelines such as the location, area, and maximum height of non-park facilities, criteria for establishing a rational development plan utilizing regional identity and the basis of evaluation standards were laid. Third, in the project process, transparency was secured through the delegation-type roundtable, in which the private sector performs the functions and roles of key actors, thereby preventing disputes such as suspicion of preferential treatment. Fourth, in order to improve the quality of park facilities to be donated and to secure design adequacy, after approval of the implementation plan, a general planner was introduced and construction project management (design stage) services were performed to promote efficient implementation and specialization of luxury parks in the region. As a result, the city of Busan carried out the project efficiently by conserving 5 parks from sunset, a park area of 2.25km2, and reducing land compensation and park construction costs by KRW 740 billion. Reinforcement of the public nature of the private-initiated park development project was suggested. However, due to the application of these systems and verification procedures, the project period is prolonged, and park services are delayed along with the financial burden on private operators.

Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Projects (해외 건설공사 공기지연사건의 합리적 대응을 위한 계약조건 리스크 평가 방법)

  • Lee, Hwangku;Shin, Dongwoo;Kim, Kyungrai;Cha, Heesung;Kim, Youngjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.65-77
    • /
    • 2017
  • Recently, many Korean major construction companies are suffering from profit loss mainly due to a direct impact from delays in their overseas projects. In general, changes are inevitable in a large-scale project, and most of changes are directly linked to construction delay. Therefore, in the event that an extension of time is necessary due to a change, the contractor must manage the delay based on the condition of the contract to effectively manage risks from delay to the completion date. Thus it is important to understand delay protocol defined in the condition of the contract early in the project, but there have been few or no study to propose methodology or tool to support this effort. This paper presents a review on the project planning and controling practices of major Korean construction companies along with the issues on delay claims and disputes in mega-international projects and suggests a tool to assess delay risk in the condition of the contract. To propose a delay risk assessment model for international construction projects, major standard conditions of contract have been reviewed including FIDIC Red Book(1999), PSSCOC(2014) and SIA 9th Edition(2010). To reflect recent trend of major international owners, standard conditions which they are utilizing for their projects also have been reviewed including those of ARAMCO and QP. The model provides a categories of risks to be reviewed on the condition of the contract along with standard level of the risk which is common in the international standard form of the contracts. This study also performed a case study on an actual international project to confirm the effectiveness of proposed model to identify and respond to a delay risk of a project.