This study was aimed at developing a computer model to determine rational road networks in mountainous forests. The computer model is composed of two major subroutines for digital terrain analyses and route selection. The digital terrain model(DTM) provides various information on topographic and vegetative characteristics of forest stands. The DTM also evaluates the effectiveness of road construction based on slope gradients. Using the results of digital terrain analyses, the route selection subroutine, heuristically, determines the optimal road layout satisfying the predefined road densities. The route selection subroutine uses the area-partitioning method in order to fully of roads. This method leads to unbiased road layouts in forest areas. The size of the unit partitiones area can be calculated as a function of the predefined road density. In addition, the user-defined road density of the area-partitioning method provides flexibility in applying the model to real situations. The rational road network can be easily achived for varying road densities, which would be an essential element for network design of forest roads. The optimality conditions are evaluated in conjuction with longitudinal gradients, investment efficiency earthwork quantity or the mixed criteria of these three. The performance of the model was measured and, then, compared with those of conventional ones in terns of average skidding distance, accessibility of stands, development index and circulated road network index. The results of the performance analysis indicate that selection of roading routes for network design using the digital terrain analysis and the area-partitioning method improves performance of the network design medel.
Journal of the Korean Institute of Landscape Architecture
/
v.39
no.4
/
pp.60-73
/
2011
Since Jeju Ollegil opened in September 2007 and attracted the sensation of popularity throughout the country, the interest in 'Walking Trails' has increased, and the central ministries and the local governments composite and assign various 'Walking Trails'. Walking trails are not tours on which people go to see one spot and move to another spot by vehicle, but a long linear journey that leads people to see, to feel and to experience a region's landscape and culture while walking on the trail. 'Walking Trails' are efficient routes to discover and to use a former way and to link the various ecological regions' histories and cultural resources, so it is most important to select a route. Although the routes were selected by considering the various planning factors and giving each route a specified theme, some problems like the inconvenience of visitors caused by lack of facilities have occurred. After designation and construction of the trails, they were not properly evaluated by visitors. Therefore, it is the purpose of this study to suggest a better way to construct the trails by surveying visitor satisfaction and by analyzing the impact of planning a route on visitor satisfaction at Bukhansan Dulegil which was completed. For this study, with a questionnaire based on the literature review to identify the important planning factors for selecting a route, a survey was conducted on visitor satisfaction for each section and their intention to revisit and to recommend that trail. Based on the characteristics of each section that was identified in the field research, the trails were classified into five types and satisfaction of each type and each type was analyzed. In addition, analyzing the impact of planning factors on satisfaction, the impact of satisfaction on revisiting and recommending and visitors' perception of the theme, further improvement for better construction of the trail was presented. Satisfaction of sectors with strong natural elements was higher; 'walking comfort' was the highest planning factor affecting satisfaction. In addition, satisfaction was surveyed to have high influence on revisiting and recommending.
KSCE Journal of Civil and Environmental Engineering Research
/
v.30
no.1D
/
pp.27-36
/
2010
Recently, the management of metro business in large cities has become more difficult because of increased construction and operation costs. The purpose of this paper presents the construction of transfer system to resolve about recent tendency to decrease of metro-users and diminution of use efficiency which are serious problems of Busan metro. To cope with this situation, it is necessary to examine the methods of obtaining returns on development profits of land value rises that occur due to transfer system construction between Busan metro line #1 and line #2 in Yangsan area. Therefore, it was made use of research on metro utilization to presuppose service improvement, as an alternative, in the transfer system construction between metro and metro which might be powerful influence over metro-users. In this research, it was examined the actual situation of rises in land values brought about by the transfer system construction of metro line #1 and line #2 in Yangsan area with application of four (4) methods, and have calculated a basis of the development profits produced by the transfer system construction of metro line. According to the economical efficiency analysis, the total construction cost amount to 4,827.1 billion won of case #1 based on single track, and evaluate economically as B/C to 1.013, NPV to 72.7 billion, IRR to 5.614 percent.
Kim, Sang-Seok;Jang, Yong-Gu;Yang, Seung-Tae;Kang, In-Joon
Journal of the Korean Association of Geographic Information Studies
/
v.10
no.2
/
pp.152-163
/
2007
The on-going pre-environmental investigation at present is performed by separate numerical analysis of each provision which makes integrated pre-environmental investigation is difficult. The application of numerical data is insufficient, which results to the deterioration of environmental investigation result's objectivity. A lot of time and money is required for the investigation. In this study, the spacial analysis function of GIS was applied on the 8 pre-environmental investigation factors. Pre-environmental investigation GIS DMS(Decision Making System) using AHP was constructed to make integrated investigation possible through the use of investigation results for each factor. Through the use of the developed pre-environmental investigation GIS DMS and the pre-constructed GIS data, the objectivity of environmental investigation is sufficient and time and cost are reduced. Therefore, this system can be used for pre-environmental investigation during route selection in the initial stages of road construction. Through the numerical and visual data obtained from the system developed in this paper, it is easier to gain the approval of the public. Furthermore, environmental problems due to road construction can be investigated with less time and money during the initial stages of road construction.
Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
/
2003.10a
/
pp.263-268
/
2003
Presently, research is hard to see design lot construction on actuality three-dimensional route although it applied three-dimensional techniques using constructed already two-dimensional plane design. Therefore, this research wishes to study about efficient decision-making at the public problem and design change that can happen during construction designing three-dimensional road and construction at actuality route location using VGIS.
The research which sees accomplishes the capital region high-speed railway and examines investigates about process of railroad construction project and an advance service contents from to understand a progress process, change process and technical investigation of basic design and the execution plan at the time of route led and accomplishes the plan which is detailed the process which in the center researched. Also plan start method and application plan, clear the security of the plan air which is proper is necessary and dividing which design phase is, plan process construction etc. improvements sacrifice froze.
The alignment design is one of the most influencing elements in earth work for the railway design. The amount of earth work mostly depends on the route, and the construction cost for railway construction largely depends on it. For this reason. it is necessary to develop a program for the construction cost estimation by route alternatives. This study introduces a program for the estimation of the earth work amount including the logics and the way to use.
An airline should consider the number of seats or size of aircraft, when it composes fleet or selects a type of aircraft for some routes. There are two major factors considered for this choice problem under the assumption that the objectives of an airline is a profit maximization: the operating cost and revenue from the aircraft operated. This research tries to solve the problem of aircraft size selection by airline. The study applies four steps to get optimal choice of aircraft size: (1) cost analysis for the relationship between airline operation cost and aircraft size: (2) market share and revenue analysis: (3) flight segment-level analysis, based on the derived cost, demand and revenue functions: and (4) network-level analysis to see how airlines make choice of aircraft size systematically at a network level. An airline can accommodate the increasing air travel demand by either increasing operation frequency, or increasing aircraft size that is represented by seat capacity, or both. Airport runway capacity and productivity depend on the size of aircraft used at airport. This paper presents the understanding of how airlines make decisions on the size of aircraft to operate, how they will adjust their choices when airport capacity is constrained, and how public regulation such as policy for landing fees could influence airlines' aircraft choice.
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.6D
/
pp.771-778
/
2011
Preliminary feasibility study on Busan metro line #1 in Yangsan line (Nopo-Bukjeong) depending on active volume of mass transportation between Yangsan city and Busan city was conducted. As the study concluded that it's valid, the necessity to establish the metro railroad network connecting to Busan, Ulsan and Gyeongnam Province is demanded to improve the transportation issues in Ungsang area vulnerable to metro service and to drive the balanced development between metropolitan cities. In addition, the volume of transportation depending on methods in target areas and road traffic assignment are surveyed to put a stress on the necessity to establish the metro railroad network. As the demand of transportation for alternative lines is predicted, the budget and benefits for construction for each alternative line set for the rough economic analysis depending on traffic volume for each method and traffic assignment results. The total project budget necessary for construction of proposal line #1 set as effective one among target three lines in this project is calculated in 794.32 billion won. Construction accounts for the most expensive in expenses for project and contingency allowances, purchases for vehicles and collateral expense are followed in orders. However, compensation for lands is not counted. In particular, according to economic analysis in proposal #1, ratio of benefit/cost (B/C) is 0.584, net present value (NPV) is -217.47 billion won, the internal rate of return (IRR) is analyzed in 0.604 %. At the current stage, it is not economically feasible, but the B/C is 0.737 in long-term upon construction of Yangsan line between Wolpheong and Yongdang which is proposal line #3. Therefore, when Busan metro basic plan is reorganized to aim the benefit of residents in Ungsang area vulnerable to the metro service, we think it must be necessary to establish the metro railroad network connecting to Busan-Yangsan-Ulsan which is proposal line #2 by extending the existing Sinjeong line and including this task line in high-ranked plan related to metro railroad.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.24
no.4
/
pp.351-358
/
2006
The farming and fishing village roads is located in a mountainous geographical feature, a resident's movement zone is followed by many restrictions in economic activities or social activities. Establishment of general planning gets into guide of long-term development direction for road in farming and fishing villages area. This study examined and analyzed a regional characteristics such as a regional environment and traffic condition, etc. and an actual condition of farming and fishing village roads, selected a factor affecting a priority to open a road, calculated a weight per each factor by AHP & Statistical analysis techniques, converted it into GIS database, and determined a priority for paying forming and fishing village roads. It is that development precedence and estimation calculation are decided applying result of research, GIS and AHP and statistical processing techniques.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.