The Concept of Schedule and Cost Progress Integrated Management on the BDM Network (BDM 네트워크 공정 및 비용 진도율 통합관리 개념)

  • Kim, Seon-Gyoo;Lee, Yong-Hyun;Noh, Seong-Beom;Ko, Dae-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.54-64
    • /
    • 2011
  • Almost 40 years have been passed since the CPM was introduced to the construction industry in Korea. However most of construction projects in Korea do not prepare the CPM schedule neither operate it after established manually, as well as still depend on the Bar-chart schedule only. One of these reasons is because the CPM schedule does not reflect the site works realistically, it makes so difficult to recognize the actual progress clearly in visual format, and it is impossible to integrate and manage the time and cost oriented work progresses effectively. This paper proposes new concept of progress management that is able to integrate and manage the time oriented schedule progress and earned value oriented cost progress while maintaining the merits of CPM although the CPM schedule summarized automatically within a schedule hierarchy by the BDM that is a new CPM technique. We expect that this concept could make the applications of CPM technique to the domestic construction industry popular and help the advancement of the construction management in Korea as well.

An Implementation of Point of Production Management System using Wireless Network (무선 네트워크를 이용한 생산시점관리시스템)

  • Seo, Jeong Min;Song, Jeo;Lee, Sang Moon
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2013.07a
    • /
    • pp.399-400
    • /
    • 2013
  • POP(Point of Production) 시스템은 제조현장에서 발생되는 생산 정보를 실시간으로 수집, 분석하여 현장의 보고 체계를 정형화 시켜준다. 또한 실시간 분석 정보를 통행 생산 이후의 과정(품질관리, 유통, 판매, 생산계획 등)을 기획하고 관리하는데 많은 도움을 준다. 즉, 제조 환경 변화에 따른 생산 지휘 체계를 통제하는 운영 환경을 조성하여 생산성 향상에 크게 기여한다. 이는 특힝 단위 공정의 생산량, 공정의 정확한 측정과 그에 따른 소요시간을 감축하는 장점이 있다. 본 논문에서는 기존의 C/S환경이 아닌 무선인터넷을 이용한 POP시스템을 제시한다.

  • PDF

A Study on the Task Variation and Social Network Analysis in the Construction Process (시공 프로세스에서 발생하는 공사변동 요인 및 네트워크 분석에 관한 연구)

  • Park, Yoona;Lee, Dongdeok;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.105-113
    • /
    • 2019
  • A construction project is a complex process consisting of interdependent tasks. If one task has variation, other tasks will be affected additionally and it is difficult to reach consensus on task variation due to the characteristics of the construction site that is going on quickly and complicatedly. Therefore, this study identified the root cause of task variation in construction process. Adjacent matrix was created with the tasks corresponding to major causes of variation, and the network analysis was performed. The results of social network analysis in the construction process can stabilize the work flow in the complex process and improve the reliability of the process plan and the project performance.

Robust Plan Generation and Dynamic Execution for Intelligent Web Service (지능적인 웹서비스를 위한 강건한 계획 생성과 동적 실행 방법)

  • Hwang, Gyeong-Sun;Lee, Seung-Hui;Lee, Geon-Myeong
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2007.04a
    • /
    • pp.320-323
    • /
    • 2007
  • 웹 서비스와 같은 분산된 환경에서, 특정 서비스를 수행하기 위해서는 원격의 컴퓨터나 사이트상에서 다중 에이전트들의 협업을 통해 이루어진다. 이때 서비스는 여러 에이전트들의 복잡한 행위들에 의해 구성된다. 또한 지능적인 서비스를 위해서는 에이전트들의 상태정보, 목적정보, 그리고 계획정보 등을 이용한다. 특히 계획정보는 에이전트들이 일련의 행위들로 구성된다. 하지만 계획수립을 위한, 기존 연구들 대부분은 정적으로 기술된 서비스 명세와 초기상태 정보를 이용하여 특정 목표를 만족시키는 단일 계획 생성 방법을 연구해왔다. 따라서 계획수립이 실행 도중에 기대하지 않은 네트워크 장애나 방해 등으로 서비스 수행을 실패하는 경우, 그 계획은 무효가 되고 다시 계획을 생성 해야만 한다. 그러나 다시 계획을 생성하기 위해서는 많은 시간을 소비하게 될 뿐만 아니라 태스크 중복이 불가피하므로 매우 비효율적이다. 이 논문에서는 강건한 계획수립과 그 계획을 실행하기 위한 효과적인 방법을 제안한다. 즉, 계획수립의 재생성을 피하기 위한 방법으로 단일 계획수립 대신에 실행 가능한 다중 계획들로 표현된 강건한 계획을 생성하는 것이다. 강건한 계획의 행위들이 실행되는 동안, 각 단계마다 실행 가능한 행위를 선택한 후, 그 행위를 실행한다. 그러나 선택된 행위가 실행결과를 낼 수 없을 경우, 대체 가능한 서브 계획 경로를 선택하여 실행한다. 강건한 계획을 표현하기 위해 페트리 넷 기반의 방법을 제안한다. 강건한 계획 생성 방법에서는 이용 가능한 모든 계획들을 입력으로 사용한다. 그 계획수립 방법은 HTN 계획수립기로 잘 알려진 JSHOP2 계획수립기내에 구현하였다. 계획 실행 방법으로는 주어진 강건한 계획에 대하여 행위들이 직접 실행하수 있도록 한다.며 용량에 의존하는 양상을 보였다. $H_2O_2$에 의해 유발(誘發)된 DNA의 손상은 catalase와 deferoxamine에 의해 억제되었지만 DPPD는 억제시키지 못했다. 배기음(排氣飮)은 $H_2O_2$에 의해 유발(誘發)된 ATP의 소실을 회복시켰다. 이러한 실험결과 $H_2O_2$에 의해 유발(誘發)된 세포(細胞)의 손상(損傷)은 지질(脂質)의 과산화(過酸化)와는 다른 독립적인 기전에 의해 일어남을 나타낸다. 결론 : 이러한 결과들로 볼 때 Caco-2 세포(細胞)에서 배기음(排氣飮)이 항산화작용(亢酸化作用)보다는 다른 기전을 통하여 Caco-2 세포안에서 산화제(酸化劑)에 의해 유발(誘發)된 세포(細胞)의 사망(死亡)와 DNA의 손상(損傷)을 방지할 수 있다는 것을 가리킨다. 따라서 본 연구(硏究)는 배기음(排氣飮)이 반응성산소기(反應性酸素基)에 의해 매개된 인체(人體) 위장관질환(胃腸管疾患)의 치료(治療)에 사용할 수 있을 가능성(可能性)이 있음을 제시하고 있다.에 이를 이용하여 유가배양시 기질을 공급하는 공정변수로 사용하였다 [8]. 생물학적인 폐수처리장치인 활성 슬러지법에서 미생물의 활성을 측정하는 방법은 아직 그다지 개발되어있지 않다. 본 연구에서는 슬러지의 주 구성원이 미생물인 점에 착안하여 침전시 슬러지층과 상등액의 온도차를 측정하여 대사열량의 발생량을 측정하고 슬러지의 활성을 측정할 수 있는 방법을 개발하였다.enin과 Rhaponticin의 작용(作用)에 의(依)한 것이며, 이는 한의학(韓醫學) 방제(方劑) 원리(原理)인 군신좌사(君臣佐使) 이론(理論)에서 군약(君藥)이 주증(主症)에 주(主)로 작용(作用)하는 약물(藥物)이라는 것을 밝혀주는

  • PDF

A Study on NOS Model System for The Construction Work Planing and Management (건설 시공 계획 및 관리 업무의 적용을 위한 NOS 모델 구축 연구)

  • Choi, Jaejin;Park, Hongtae
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.10-18
    • /
    • 2016
  • This study presented a new NOS model through the following suggestions to apply the construction work planing and management to NOS(Network Operating System). First, This study presented CIMS(construction information classification system) reflected the characteristics of facility classification - functional component classification - functional component classification - work classification - resource classification. Based on this system. this study presented how to establish PMMB(performance measurement management baseline) with proposed master target equation which analyzed the trend of performance measurement management baseline and proposed work target equation which analyzed the execution results. Finally, this study presented NOS model that can be applied to fixed price method and cost plus fee method through the theoretical verification of executive performance analysis method.

A study on Comparison of the Palate Methods for Multi-objective optimization ptoblem (다중 최적화 문제에서 파레토 방법들 비교 연구)

  • Ko, Young-Sang
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2639-2641
    • /
    • 2003
  • 유전자 알고리즘은 다윈의 자연선택설과 유전자의 진화 개념을 이용한 적응 탐색 알고리즘으로 적용하고자 하는 문제의 매개 변수를 유전자와 비슷한 데이터 구조로 부호화하고, 유전 연산자를 이용하여 문제의 해답을 찾는 알고리즘이다. 최근 유전자 알고리즘은 이러한 복수개의 목적 함수를 최적화 하기 위한 다중 최적화 문제를 위한 최적화 기술로서의 관심이 크게 다루어지고 있으며 전송 문제, 생산 공정 문제 계획 등과 같은 다목적 함수를 다루는 많은 응용 부분에 대해 적용되고 있다. 본 논문에서는 기본적인 다중 목적 함수용 예와 Gen과 Kim이 제안한 네트워크 신뢰도를 고려한 연결 비용과 메시지 지연을 고려한 이중 구속 통신망 설계 문제를 가지고 가중치 합과 여러 가지 파레토 방법들을 비교하고 연구 검토 하고자 한다.

  • PDF

CPM Bar Chart Technique for Construction Scheduling (CPM Bar Chart 기법을 활용한 일정계획)

  • Kim Kyung-Hwan;Kim Soo-Yoo;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.135-142
    • /
    • 2004
  • This paper proposes the CPM bar chart (CBC), a hybrid of the bar chart and the critical pad method (CPM). The CBC overcomes shortages of the fenced bar chart, while still keeping advantages. The fence with direction is applied instead of the broken fence, which triggers considerable problems to identify and apply in the fenced bar chart. In addition, the notorious task to find dummy activities is no longer required. Upon the benefits of simplicity in the bar chart and logical work sequence in the CPM network. the CBC provides a relatively easy way to create and understand a schedule, thus improving communication quality between project participants. With the advantages, the CBC can also be effectively applied to various scheduling techniques such as resource constrained scheduling, resource leveling, scheduling with activity split, delay impact analysis, etc.

스마트그리드에서의 CPS (cyber-physical system) 시뮬레이션 구현을 위한 제반 연구이슈 및 방법론 검토

  • Kang, Dong-Joo;Kim, Huy-Kang
    • Review of KIISC
    • /
    • v.22 no.5
    • /
    • pp.62-72
    • /
    • 2012
  • 스마트그리드는 전력시스템과 이를 제어하기 위한 통신 인프라를 중심으로 다양한 시스템이 서로 통합되는 종합적인 플랫폼으로 이해할 수 있다. 기존에 각기 독립적으로 운영되는 시스템과 통신 인프라가 통합되기 시작하면서 다양한 상호작용이 파생되고 그로 인해 잠재적인 보안 측면의 위험성도 커지게 된다. 전통적인 전력시스템은 폐쇄적인 SCADA 네트워크를 기반으로 운영되었기 때문에 최소한의 보안강도가 보장되었지만, 스마트그리드 하에서는 개방형 통신망과 연계되면서, 기존의 사이버 보안 위협들이 전력시스템으로 유입하게 된다. 기존의 IT 시스템과는 달리 전력시스템과 같은 제어시스템은 물리적 작동과 공정이 수반되기 때문에 새로운 위험이 발생하기도 하고 기존의 위험이 증폭되기도 한다. 전력시스템에서는 가용성이 그 무엇보다 중요하기 때문에, 스마트그리드 체제하에서의 다양한 위협요인을 미리 파악하고 이에 대비한 계획을 수립함으로써, 그러한 가용성의 수준을 유지할 필요가 있다. 이를 위해서는 기존의 사이버 위협이 어떠한 경로를 통해 전력시스템에 영향을 미치게 되며 그로 인한 잠재적 위험이 얼마나 되는가를 평가할 필요가 있다. 그러나 스마트그리드는 아직까지 구축중인 미래형 시스템이고 누적된 과거 데이터가 없기 때문에 가상의 하드웨어 기반 테스트베드 내지 소프트웨어 기반의 시뮬레이션 모델을 통해 이를 사전적으로 테스트할 필요가 있다. 또한 스마트그리드는 서로 다른 IT 시스템과 물리적 설비들이 결합되는 복잡한 시스템이라는 측면에서, 잠재적으로 발생 가능한 다양한 위험을 분석하고 평가할 수 있는 모델의 수립이 요구된다. 본고에서는 그러한 CPS 기반 시뮬레이션 모델에 대한 현재의 연구동향을 검토하고, 향후 실질적으로 구현하기 위한 방안을 제안하고자 한다.

Load Leveling of Block Erection Network Using Diminution of Maximum Load Based on Constraint Satisfaction Technique (제약만족기법 기반의 최대부하감소를 통한 탑재 네크워크의 부하평준화)

  • Ryu, Ji-Sung;Kim, Hong-Tae;Park, Jin-H.;Lee, Byung-No;Shin, Jong-Gyu
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.41 no.5
    • /
    • pp.55-62
    • /
    • 2004
  • The logistics of entire shipbuilding process are integrated during the block erection process and the schedules for the erection process are made prior to. the schedules of any other processes. Therefore, efficient scheduling of the block erection process are one of most important issues in shipbuilding. There are only a few studies published regarding block erection scheduling methods because of its complexity and variability. This paper proposes an algorithm for diminution of maximum load based on constraint satisfaction technique. it is developed primarily for the efficiency in load leveling and applicability to the actual block erection process. The proposed algorithm is applied to actual block erection process and the results shows improvements in load leveling. It can also be used for the scheduling of fabrication, sub-assembly, and assembly to improve load leveling.