A Study on Estimating Method for Actual Unit Cost Based on Bid Prices in Public Construction Projects (시설공사 입찰단가를 활용한 실적단가의 산정 방안에 관한 연구)

  • Kang, Sang-Hyeok;Park, Won-Young;Song, Soon-Ho;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.159-166
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

Establishment of Measurement Standards for Productivity Assessment in Construction Project (건설 프로젝트 생산성 평가를 위한 측정 기준 수립)

  • Kim, Junyoung;Yoon, Inseok;Jung, Minhyuk;Joo, Seonu;Park, Seungeun;Hong, Yeungmin;Cho, Jongwoo;Park, Moonseo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.3-12
    • /
    • 2022
  • In general construction project planning ratio of manpower and quantity of outputs produced, such as the construction estimate standard, is used as the criterion for labor productivity. This method is highly effective in construction projects with repetitive work, however, there is a limit to apply in large-scale projects with high complexity. This is because the influence of non-work time caused by various work interruption factors that act complexly on the productivity of the project is greater than the average labor productivity derived from the performance data of the project. Therefore, this study proposes a productivity measurement method that can evaluate the characteristics of construction works and the cause of non-working time. To this end, first, detailed work processes and their non-work factors for each work type are defined, and the Adv-FMR technique is developed for quantitatively measuring them. Next, based on the concept of obtainable productivity, methods for comparative productivity analysis by work type, evaluating non-work factors, and deriving productivity improvement methods are proposed. Finally, a case study is conducted to validate that the analysis results based on Adv-FMR data can support the decision-making of construction managers on productivity management.

A Proposal of Repair Cost Estimating Criteria for Persistent Defects in Apartment Houses

  • Lee, Hae-Jin;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.597-608
    • /
    • 2011
  • It has been often noted as a problem that as there are no objective and clear criteria for the repair cost estimate of persistent defects, when a claim arises in relation to an apartment construction, significantly different amounts of compensation may be given for similar defects based on the experience and tendencies of the construction experts asked to make a judgment. For this reason, this research aims to present defect managers with a more reasonable and objective estimation criteria and a system to determine the repair cost of defects based on an analysis of relevant factors. The research findings show that the historical cost system is applied first, and then a standard of estimation is used to estimate the cost for the items that are not included in the historical cost system. The criteria for the repair cost for each defect is as follows: the repair cost for defects arising from a regulation violation is determined by calculating the reconstruction cost of the parts in question after demolishing them; the repair cost for progressive defects is determined based on a contribution ratio proportional to the age of the building; the repair cost for repetitive defects is calculated by considering an alternative to maximize the intended function of the defective parts; and the repair cost for value depreciation defects is determined based on the ratio of the warranty period to the lapsed years. However, repair cost estimation for dual value depreciation defects should be studied in future research.

Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method (원가계산방식에 의한 다가구임대주택 해체공사비 예측)

  • Park, Seong-Sik;Lee, Sung-Bok;Shin, Sang-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.415-427
    • /
    • 2011
  • This study is aiming at estimating the demolition cost of deterioration housing by the rational method in order to provide for the demolition and new build project of the rental multi-family housing of LH. We investigated the actual state of demolition construction and work process of small size housing, and analysed an actual condition of estimation for the demolition cost through an advice by the expert of construction cost estimate. Furthermore, the 'estimation standard for the predetermined amount', 'estimation standard for the disposal cost of construction wastes' and precedent studies in public construction work were considered. As one of results in this study, cost accounting system, breakdown system and construction cost for the demolition work based on the standard of estimate were proposed and the predetermined amount of demolition construction for the multi-family housing with 2 or 3 floors could be produced by them. Eventually, It is estimated that the demolition cost per a multi-family housing is about 18,331,000(won) and 104,000(won) per floorage($m^2$). To the details, the result indicated that the direct demolition cost needs about 14,339,000(won) per a multi-family housing and the consignment disposal cost of wastes needs 3,992,000(won) per one. The results of the study will be used as the fundamental data to estimate the project cost in the phase of budget establishment for demolition and new build project of the deteriorated rental multi-family housings, and also cost accounting system of demolition construction and breakdown system are expect to be used effectively at the ordering of public construction work.

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

A Case Study on the Application of Machine Guidance in Construction Field (공사 현장에서의 Machine Guidance 적용에 관한 사례연구)

  • Kim, Wanbong;Park, Sangil;Lee, Riho;Seo, Jongwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.5
    • /
    • pp.721-731
    • /
    • 2018
  • Manpower in domestic construction sites is becoming more and more aging. Various methods have been devised to prevent productivity and quality deterioration of construction due to absence of skilled workers and difficulty in supplying manpower. Especially, many researchers study various methods such as Machine Guidance (MG) and Remote Machine Control to improve productivity and quality. Although many prior studies have been conducted since the advent of MG, There is lack of field test in a difficult site to stakeout. In this study, field test of MG excavator was carried out at difficult site to stakeout, and productivity analysis and quality evaluation were conducted. As a result of the analysis of productivity, the minimum value was 20.5%, the maximum value was 56.9%, and the average productivity in 4 days was 38.3% higher than the standard product. As a result of the analysis of quality, the horizontal error ${\pm}1cm$ and the vertical error ${\pm}2cm$ confirmed in the previous study were verified.

The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project (근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석)

  • Park, Taeil;Kim, Kyunghoon;Shin, Eun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.37-43
    • /
    • 2019
  • After the new standards for labor hours has been released, various problems come up in construction field, such as income reduction of employees, extension of construction period and increased construction cost. Although it is expected that the impact of the new standard on the construction industry is more worse than other industries form the view of productivity, not much works have been done to identify those impacts. Thus, this research proposes the standard construction processes, excavation cycle, and unit construction period for NATM tunnel project based on 'Construction Standard Production Rates.'The study also investigated the impact of reduced labor hours on the management of work crews, construction periods and costs of tunnel projects. The results showed that under the 52 labor hour standard, the construction periods for the excavation work and whole project was increased by 20% and 8.9%, respectively, but the construction costs for the excavation work and whole project was decreased by 1.4% and 0.6%, respectively.

Felling Productivity in Korean Pine Stands by Using Chain Saw (체인톱을 이용한 잣나무의 벌도작업 공정 분석)

  • Han, Won Sung;Cho, Koo Hyun;Oh, Jae-Heun;Song, Tae-Young;Kim, Jae-Won;Shin, Man Yong
    • Journal of Korean Society of Forest Science
    • /
    • v.98 no.4
    • /
    • pp.451-457
    • /
    • 2009
  • This study was conducted to evaluate the felling productivity by chain saw in thinning operation of Korean pine (Pinus koraiensis) stands. Time study data were collected from 4 thinning site in Korean pine stands. This study derived a regression model to estimate the average felling cycle time for evaluating the productivity in felling, which was used to analyze the felling productivity by thinning period. In the study sites, the average felling cycle time per a tree was 463 sec/cycle and the productivity was $2.26m^3/hr$. Thinning period in Korean pine is divided into three groups by producing purposes; small-diameter log, medium-diameter log, and large-diameter log. And analyzed working time and productivity from thinning period fixed by producing purposes. For the small-diameter log producing purpose estimated to be thinning period operated once when the mean DBH was 16 cm and its productivity was $8.94m^3/man{\cdot}day$. For the medium-diameter and large-diameter log producing purposes, thinning period was twice and three times when the mean DBH of the 1st and 2nd thinning period was 16 cm and 21 cm, and its productivity was $9.06m^3/man{\cdot}day$ and $10.86m^3/man{\cdot}day$. The 30 cm in DBH and $15.12m^3/man{\cdot}day$ in productivity was operated 3rd thinning for the large-diameter log producing purposes.

The Fact-finding and Analysis of the Environmental Management Cost in Construction Projects (건설공사의 환경관리비용 계상 및 운용 실태 분석)

  • Choi, Min-Soo;Kang, Woon-San
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.186-192
    • /
    • 2005
  • The purpose of this study is to find the reality of environmental management cost in construction projects and to suggest some policies in order that owners appropriate the environmental management cost reasonably in the construction budget for reducing the environmental pollution at job sites. We surveyed the actual state of appropriating and expending the environmental management cost over 122 construction sites. According to the results of the survey, while the appropriated rate of the environmental management cost was 0.59% of the total construction cost. the expended rate reached at 0.94%. When examining the antipollution facilities which were operated in job sites, the investment for equipment against air-pollution such as tire washer, dust-proof device was relatively higher than other antipollution equipment. As the method appropriating the environmental management cost, we concluded that a quantity-per-unit costing method is more reasonable than appropriating at a fixed rate of total construction cost considering that there is little correlation between total construction cost and the environmental management cost. To do so, antipollution facilities that must be examined at a design or estimation stage of a construction project should be prescribed by the law. Moreover, referenced cost data for the quantity-per-unit costing should be prepared and officially published.

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.