Digital Pen System for Inputting the Actual Amount of Labor Input at Construction Site (건설현장의 실투입 노무량 입력을 위한 디지털펜 시스템)

  • Kim, Daewon;Kim, Tae-Yong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.133-140
    • /
    • 2016
  • The amount of labor input in a construction project is used as source data to estimate construction cost and to understand the productivity of the construction industry. However, there is a significant difference between the standard of estimation and the actual amount of labor input, and a plan is needed to resolve this problem. For this reason, to establish a system with which the actual amount of labor input can be inputted in a more accurate and simpler manner, a new method is proposed in this study. In the new method, a digital pen is used to minimize the difference from traditional handwriting on paper using a pen, and eliminate the redundant input of information. This study is expected not only to reduce the actual amount of labor input but also to contribute to the productivity of construction cost estimate through the sharing or utilization of the information on the web.

Cost Calculation of the Implementation Project for the Management of Total Maximum Daily Loads (수질오염총량관리 시행계획 이행평가 사업의 대가산정 방안에 관한 연구)

  • Kim, So Hee;Baek, Song Yi;Jung, Na-ria;Hyun, Jae-Myung
    • Ecology and Resilient Infrastructure
    • /
    • v.9 no.3
    • /
    • pp.174-182
    • /
    • 2022
  • The existing cost calculation standard for the implementation project to manage total maximum daily loads calculates cost by considering the area scale and the population based on the basic cost. This method renders it difficult to calculate cost when the detailed characteristics of a business are considered. Therefore, in this study, we proposed a costing method that applied the standard fee calculation, reflecting the area scale, a number of human and livestock, wastewater discharge facilities, etc. And, through the review of related order cases, the suitability of factors affecting the implementation project is verified and the appropriateness of the cost calculation method is verified.

Case Study on the Cost Estimation standard for Smart Construction - Focused on Japan (스마트건설 공사비산정기준 사례조사 연구 - 일본사례를 중심으로 -)

  • Song, Tae-Seok;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.171-172
    • /
    • 2020
  • Recently, the need for smart construction technologies related to the Fourth Industrial Revolution has been increasing in order to improve productivity of the construction industry. The Ministry of Land, Infrastructure and Transport has established Smart construction technology road map to commercialize the smart construction, and research and development is also underway. However, due to the lack of cost estimation standards for such smart construction technologies to be deployed to actual sites, smart construction technologies are not actively applied to construction sites. In particular, cost estimation standards are needed for construction machinery equipment with ICT technology that is currently available for commercialization. Therefore, as a preliminary study for the development of smart construction cost estimation standards, a case study was conducted on ICT construction estimation standards in Japan and present them as basic data for standards in Korea.

  • PDF

A Study on Application of the Standard Market Unit Price for Electric Work. (전기공사 표준시장단가 산정기준 연구)

  • Choi, Seung-Dong;Hyun, So-Young;Oh, Dong-Suk;Hong, You-Jung
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1436-1437
    • /
    • 2015
  • "국가를 당사자로 하는 계약에 관한 법률" 시행령 제9조 1항 제3호 및 같은 법 시행규칙 제5조 제2항에 근거 전기공사의 예정가격의 결정기준은 (1)거래실례가격 (2)표준품셈 (3)표준시장단가 (4)견적가격 등 4가지 방법을 사용하고 있다. 특히 표준시장단가제도는 이미 수행한 공사의 계약단가만을 고려하여 발표하는 "실적공사비"제도를 계약단가, 입찰단가, 시공단가 등을 고려한 "표준시장단가"제도로 2015년 3월 1일부로 개정되었다. 제도는 시행되었으나 표준시장단가의 산정기준, 절차 및 방법 등 세부적인 제도가 미흡한 상황이다. 따라서 과거 실적공사비 산정방식을 검토하되, 계약단가, 입찰단가, 시공단가 등을 고려한 합리적인 표준시장단가의 산정방식을 제시함으로써, 예정가격결정시 적정공사비를 확보하고, 원 하도급간의 거래가격 투명성 및 객관성을 통해 전기공사의 품질 및 안정성이 확보될 것으로 사료된다.

  • PDF

Proper Estimating Method for Environmental Preservation Cost in Road Projects (도로공사 환경보전비의 적정 산출 방안)

  • Park, Ji-Sun;Lee, Sea-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.3-10
    • /
    • 2012
  • The current enforcement regulation of "Construction Technology Management Act" prescribes calculation standard of environmental preservation cost in construction site. According to this standard, environmental preservation cost is calculated by using the quantity-per-unit costing method or applied fixed rate on direct cost. However, when calculated by using the quantity-per-unit costing method it is few items to put in the budget according to standard of construction estimate and in the case of using the fixed rate on direct cost it is not considering various characteristics of the construction site. Therefore, it is needed a improvement plan of estimating method and management system for environmental preservation cost. In this study, it surveyed the actual state of the environmental preservation cost according to magnitude of project, site location, anti-pollution facilities and etc. over 38 road projects. The research reported in this paper environmental preservation cost was variously distributed over construction sites. Thus it needs to estimating method and management system to consider characteristics of construction site for environmental preservation cost.

Development of Defect-Repair Method-Cost Mapping Algorithm of Concrete Bridge Using BMS Data (BMS 데이터를 활용한 콘크리트 교량의 결함-공법-비용 매핑 알고리즘 개발)

  • Lee, Changjun;Park, Wonyoung;Cha, Yongwoon;Jang, Young-Hoon;Park, Taeil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.267-275
    • /
    • 2023
  • As aged infrastructures have been increased, the importance of accurate maintenance costs and proper budget allocation for infrastructure become prominent under limited resources. This study proposed a mapping algorithm between representative defects, repair methods, and the estimated maintenance costs for concrete bridges. In this regard, using BMS (Bridge Management System) data analysis, bridge repair methods were classified and matched with defects according to their locations, types, and sizes. In addition, the maintenance costs were estimated based on the amount of work-load and quantity per unit using CSPR (Cost Standard Production Rate). As a result, the level of accuracy was an average of 85.1 % compared with the actual bill of quantity for Seoul bridge maintenance. The accuracy of maintenance costs is expected to be enhanced by considering the various site conditions such as pier height, extra charge conditions, additional equipment, etc.

A Study on the Standardization of Construction Types for the Management of River Project (하천사업 공사관리를 위한 공종 표준화 방안 연구)

  • Jang, Chorok;Jang, Moon Yup;Song, Juil;Kim, Han Tae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.486-486
    • /
    • 2021
  • 국가에서는 수해예방 및 주민들의 삶의 질 향상을 위해 다양한 하천사업을 수행한다. 국토교통부의 경우 매년 막대한 예산을 투입하여 하천정비 및 재해복구사업 등을 추진 중에 있으나, 체계적인 공사관리와 산출물의 전산화를 위한 시스템은 부재한 실정이다. 현재 건설사업정보시스템(건설CALS)을 통해 하천공사에 관한 정보를 확인할 수 있으나 총 공사비, 참여업체 등 기본적인 정보만을 제공하고 있으며, 공정관리 및 예산정보에 관한 상세한 내역을 확인 및 관리할 수 있는 기능은 부재하다. 이러한 문제를 해결하고자 본 연구에서는 하천사업(공사)관리시스템의 필요성을 제시함과 동시에 우선적으로 하천사업 공종 표준화를 수행하고자 한다. 현재 건설공사표준품셈을 통해 건설공사의 공종을 확인할 수 있으나 '제2장 하천공사' 내에는 사석, 돌망태, 하천호안공에 관한 정보만을 담고 있다. 하천공사 공종 표준화를 진행하게 될 경우 공종별 공사 세부정보에 대한 관리가 가능해지며, 현재 하천을 관리 중인 국토교통부, 지방국토관리청 및 지자체 등 하천사업을 수행 중인 기관의 시스템 활용도를 제고할 수 있다. 하천사업 공종표준화를 위해 우선적으로 현재 건설공사표준품셈, 도로대장 전산화 입력지침 등기 수립된 지침 및 기준을 통해 건설토목공사 시의 공종을 조사·분석한 후, 하천공사 준공보고서 및 감리보고서 등 공사 관련 자료를 활용하여 하천공사에 주로 수행되는 공사들에 관한 종류를 도출하였다. 이후 건설토목공사 공종과의 비교·분석을 통해 하천공사에서 주로 수행되는 공종을 도출·표준화하는 작업을 진행하였다. 본 연구에서 제시한 하천사업 공종의 경우 향후 하천사업(공사)관리시스템 개발에 활용이 가능하며, 하천공사 관리의 효율성을 극대화할 수 있다.

  • PDF

Development of an outline project cost calculation module for disaster prevention facilities in the living area due to winds and floods (풍수해 생활권 방재시설에 대한 개략 사업비 산정 모듈 개발)

  • Kim, Sol;Lee, Dong Seop;Lee, Jong Jin
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.1
    • /
    • pp.45-52
    • /
    • 2023
  • Due to natural disasters such as heavy rain that occurred in the metropolitan area in August 2022, human casualties and property damage are increasing. Accordingly, the government is making efforts to respond to natural disasters, but due to the absence of related standards and standardized standards, problems such as increased construction costs and deterioration in construction quality for disaster prevention facility maintenance projects are occurring. Accordingly, a rough construction cost estimation module was developed and applied to 25 new pumping stations in Korea. As a result of the analysis, the accuracy of the rough construction cost derived through the module recorded 70% of the detailed design cost, which is 4% higher than the previously used rough construction cost accuracy of 66% by the Ministry of Environment. Accordingly, it is expected that the efficiency of the disaster prevention project can be increased if the developed module is used to calculate the rough construction cost for storm and flood disaster prevention in the future.

A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.219-224
    • /
    • 2007
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan(2004${\sim}$2006) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, l,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.

  • PDF

A Study on Landscaping Repair Work Classifications in Cultural Heritage Industry (문화재 수리의 조경분야 공종 분류에 관한 연구)

  • Kim, Min-Seon;Lee, Jae-Yong;Kim, Choong-Sik
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.59-66
    • /
    • 2022
  • The purpose of this study was to suggest the landscaping repair work classification, the standard for securing the independence of and establishing the scope of landscaping repair works. Standard construction specifications currently specify the landscaping repair work classification around the planting construction, while standard work estimate does not include the field of landscaping. The landscaping construction specifications and the standard work estimate in the construction industry should be, however, applied, so it is difficult to specifically understand what is the landscaping repair work classification in the cultural heritage industry. From 1961 to 1980, not only the tree planting but also a variety of landscaping facilities had been specified as the landscaping repair works, and it was found that all of these work classifications are established as the landscaping repair work classifications in the construction industry. A total of 20 work classifications were verified by comprehensively arranging those specified in notices of tender for working drawing services for cultural heritages during three years, from 2018 to 2020, except for those for the maintenance and Dancheong of architectures, plant protection and conservation. All 20 work classifications corresponded to the landscaping work classifications in the construction industry. On the basis of the landscaping work classifications in the construction industry, this study divided the landscaping repair work classifications into site-building and shaping, planting work, facility construction, paving work, ecological landscape architectural construction and vegetation maintenance, by considering the specialty of cultural heritage space.