The Case study on internal and external Rapid Railroad Operation in Metropolitan Area (국내외 수도권 광역급행열차 운영에 관한 사례연구)

  • Choi, Yeong-Jin;Kim, Yun-Soo;Kim, Bo-Sung;Park, Jung-Soo
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1886-1894
    • /
    • 2009
  • The widening national capital area of Korea has caused a traffic jam problem with increasing commuting hours. In addition, as the economic crisis goes on, the people moving to the outside of a city has increased. So we expect that the expansion of this metropolitan area will do grow and it will cause a more severe traffic jam in the near future. Therefore, We will study about 'Rapid Railroad Operation in Metropolitan Area' to solve this problem and improve rail's competitive power as a reasonable transportation method. The Rapid Railroad can sharply reduce commuting hours. Also, it is more eco-friendly transportation than the others. Through many cases revealed in both domestics and overseas, we will solve the problem of a traffic jam getting senous m metropolitan area. After studying successful cases of overseas, rapid railroad, such as France and Japan, we will study domestic cases of Yongsan$\sim$Dong-inchoen, Guro$\sim$Cheonan and Gaehwa$\sim$Sin-nonhyeon, and comparison will do made among these case. In conclusion, The introduction of Rapid Railroad show the effective plan for strengthen the competitiveness and solve the traffic problem.

  • PDF

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

A Prediction of $CO_2$ Concentration and Measurement of Indoor Air Quality in the EMU (전동차 실내공기질 측정 및 $CO_2$ 농도 예측)

  • So, Jin-Sub;Yoo, Seong-Yeon
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.4
    • /
    • pp.378-383
    • /
    • 2008
  • In December 2006, the Ministry of Environment Republic of Korea established the guideline which is "Indoor Air Quality Management Guidelines in Public Transportation." as control items, $CO_2$ (carbon dioxide) and PM10 (particle matter) are classified two categories, that is, Level 1 (non-rush hour), Level 2 (rush hour). Therefore, the quality of air in train and subway should be controlled in accordance with the guideline. We took a measure the air freshness inside train twice at Line 4 (Tangogae-Oido), in Sep. 2007 and at Line 1 (Dongincheon-Yongsan) in Nov. 2007, respectively and, also expected the emitted $CO_2$ concentration by using a property of matter such as EMU (Electric Multiple Unit) design reviewing specification and air. According to the measured values, the concentration of PM10 was 44, 57, 45% and the concentration of $CO_2$ was 39, 36, 44% respectively, all measured values are within the guideline and also, as a result we found the expected value and measured value are similar.

A Study on the Application Status and Appropriateness of Light Railway Systems - In the Seoul Metropolitan Area - (경량전철의 도시별 적용실태조사와 적정성에 관한 연구 - 수도권을 중심으로 -)

  • Kim, Jongki;Ha, Seungwoo;Seo, Jongwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.403-411
    • /
    • 2010
  • Nowadays, Light railway system is attracted public attention as solution for metropolitan traffic congestion. But it is difficult to decide an appropriate light railway system. It is especially hard in the Seoul metropolitan to decide an appropriate system, because there are many factors that must considered. So we research application status of light railway system that is scheduled or promoted in the Korea and the foreign nations. And we selected systems by types of city. In this paper, we divided into 6 types of city through factor analysis and cluster. And we considered various factor such as technology, transportation, environment etc that used previous research and feasibility study. To determine the priority among the factors, AHP(Analytic Hierarchy Process) was applied as a method for multi-standard decision method.