• Title/Summary/Keyword: 근접도 계측

Search Result 141, Processing Time 0.022 seconds

Accuracy Analysis of Close-Range Digital Photogrammetry for Measuring Displacement about Loading to Structure (하중에 따른 구조물 변위계측을 위한 근접수치사진측량의 정확도 분석)

  • Choi, Hyun;Ahn, Chang Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4D
    • /
    • pp.545-553
    • /
    • 2009
  • This paper describes the result of study on measurement of displacement of structure by means of non-contacting method, close-range digital photogrammetry using digital camera. To apply close-range digital photogrammetry to displacement measurement of structure, correction of lens distortion that interferes geometrical analysis has been carried out and then measuring displacement was performed on load regulated-rahmen. For enhanced applicability of displacement measurement, MIDAS which is a structural analysis program was used for modeling and the result was taken from comparative analysis. As a result of the study, it is showed that close-range digital photogrammetry could supplement several weaknesses of LVDT and cable displacement meter and, especially, economy in the perspective of measuring time could be realized. Close-range digital photogrammetry using digital camera can be applied to the area where requires visual analysis such as 3D modeling of structure, profile replication of measurement of structure as well as measurement of displacement of structure.

Safety analysis for the tunnel adjacent to the pier (교각에 근접한 터널의 안정성 평가)

  • Lee, Sun-Bok;Yoon, Ji-Son
    • Journal of the Korean Geophysical Society
    • /
    • v.7 no.4
    • /
    • pp.313-324
    • /
    • 2004
  • The finite element method and statistics of the convergence measurement are useful method of the stability analysis of the tunnel adjacent to the pier. It is the purpose of the this case study to certificate of validity of the application of those methods. The safety of the pilot tunnel method and LW pre-grouting has been evaluated from the FEM analysis. The three-dimensional finite element method is carried out for the decision of the level of stress redistribution at the two-dimensional numerical analysis. An analysis of the convergence is carried out by the estimation of preceding convergence at tunnel excavation. F-examination is applied for this estimation. As results of that analysis, The F-value is from 10.81 to 158.74 and the coefficient of determination is from 0.82 to 0.99. An analysis of convergence is carried out by using regression analysis. Consequently, it is shown that the convergence can be modeled as following function C(t) = a[1-exp(-bt)].

  • PDF

Analysis of Ship Handlers' Maneuvers with respect to Ship's Speed under Strong Cross Current in the Breakwater Channel of Busan Port (부산항 방파제 진입항로의 강한 횡조류 환경에서 선속에 따른 조종자의 선박조종의 결과 검토)

  • Lee, Dong-Sup;Jeong, Tae-Gweon
    • Journal of Navigation and Port Research
    • /
    • v.32 no.8
    • /
    • pp.577-582
    • /
    • 2008
  • In order to ascertain the effect of ship's speeds, in maneuver under the condition of strong cross current in the breakwater channel of Busan port, this paper is to deal with the analyses of vessel proximity measures, vessel controllability measures, and ship handlers' subjective evaluation measures of simulated maneuvers, which were carried out by 76 ship handlers who conned Panamax bulk carrier of 60,000 DWT, The set and drift of current are southwesterly and 2 knots. The speeds of the model ship are 5 knots & 10 knots respectively. The followings are concluded. ${(1)}$ In the approaches of the breakwater of Busan port, ship handlers psychologically tend not to give the drift angle of more than $10^{\circ}$ bemuse ship's head points out of the entrance. ${(2)}$ Ship handlers' subjective evaluation, vessel proximity and controllability measures are relatively larger under the speed of 5 knots than under that of 10 knots. due to direct pressure of strong current. ${(3)}$ A single index of controllability measures was suggested, by removing their units.

Study on Establishing Comprehensive Management Measures to Ensure Stability of Existing Metro when Constructing Ground Structures Adjacent to Subway (지하철 인접 지상구조물 설치시 기존 지하철 안정성 확보 위한 종합관리대책 수립 연구)

  • Jae-Hong Lim;Guk-Hwan Cho
    • Tunnel and Underground Space
    • /
    • v.34 no.3
    • /
    • pp.196-207
    • /
    • 2024
  • In this study, a comprehensive management plan was proposed to ensure the stability of the existing subway when constructing ground structures adjacent to the subway. In the first step, the measurement inspection cycle is selected through proximity evaluation, in the second step, the stability of existing subway and station structures such as displacement and stress is reviewed through 3D numerical analysis considering the construction stage and groundwater influence, and in the third stage, the safety of train operation was reviewed by examining the track stability, and based on the numerical analysis results in the fourth stage, the displacement concentration section was selected as an intensive management section and it was proposed that intensive measurement management be performed.

Comparison of Goal-point and In-length Analyses in the Proximity Measures of Simulated Maneuvers (선박조종시뮬레이션의 근접도 계측에서 연속 분석과 목표점 분석에 관한 비교 연구)

  • Jeong, Tae-Gweon;Lee, Dong-Sup
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.31-36
    • /
    • 2006
  • The evaluation of safety of simulated maneuvers is frequently analysed by so called goal line or point of interest. This paper is to suggest that regarding the results of simulation the goal analysis and in length analysis are investigated respectively and the availability of which is effective and is also to suggest closest distance to channel boundary at each ship's position, not centerline, as one of proximity measures.

  • PDF

Study on the Vibration Intensity in a Beam (보에 있어서 진동인텐시티에 관한 연구)

  • Kim, Young-Wan;Park, Byeong-Jeon
    • The Journal of the Acoustical Society of Korea
    • /
    • v.16 no.5
    • /
    • pp.36-42
    • /
    • 1997
  • This paper purposes the measurement method of vibration intensity in building structure which is a method of measuring the intensity and the flow of vibration energy. We derived basic theory and measuring theory for a simple beam, and comparison of the experimental results with calculated results. As a result, according to the calculated value from acceleration distribution and the measurement result from the method of vibration intensity under the condition except near field of measurement zone. The measured results, show that this method is useful for measuring the vibration energy flow in building structure.

  • PDF

A Study on the Monitoring Case of the Soil Blocking Facilities Due to Water Pipe Rupture Accident (상수관 파열 사고로 인한 흙막이 가시설 계측사례 연구)

  • Woo, Jong-Tae
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.244-246
    • /
    • 2023
  • 아파트 신축공사 흙막이 가시설 현장에 근접 매설된 상수관의 누수 및 파열 사고로 인접 건물이 공사현장 방향으로 58~188mm 기울어졌으며, 지중수평경사계 계측결과 21.07.20일 22.64mm가 21.10.18.일 101.46mm로 급격하게 78.82mm의 큰 수평 변위가 발생되었으며, 이로 인해 흙막이 가시설의 사보강재가 변형되고 토류판 일부가 파손되었다.

  • PDF

A Case Study on the Application of Safely Analysis for the Tunnel Adjacent to the Pier (교각에 근접한 터널의 안정성 평가에 대한 사례 연구)

  • 이선복;윤지선
    • Tunnel and Underground Space
    • /
    • v.13 no.2
    • /
    • pp.77-86
    • /
    • 2003
  • The finite element method and statistics of the convergence measurement are useful method of the stability analysis of the tunnel adjacent to the pier. It is the purpose of the this case study to certificate of validity of the application of those methods. The safety of the pilot tunnel method and LW pre-grouting has been evaluated from the FEM analysis. The three-dimensional finite element method is carried out for the decision of the level of stress redistribution at the two-dimensional numerical analysis. An analysis of the convergence is carried out by the estimation of preceding convergence at tunnel excavation. F-examination is applied for this estimation. As results of that analysis, The F-value is from 10.81 to 158.74 and the coefficient of determination is from 0.82 to 0.99. An analysis of convergence is carried out by using regression analysis. Consequently, it is shown that the convergence can be modeled as following function C(t)=a[1-exp(-bt)].

국내외 정보

  • Korea Electrical Manufacturers Association
    • NEWSLETTER 전기공업
    • /
    • no.94-2 s.99
    • /
    • pp.29-44
    • /
    • 1994
  • PDF

TBM 터널과 NATM 터널의 초 근접시공 사례

  • 이인기
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.1 no.2
    • /
    • pp.161-170
    • /
    • 1999
  • 본고에서는 $1986.8\~1988.7$월중에 시공된 부산지하철 1호선 3단계 건설구간 중 서대신동 로타리에서 괴정국민학교 앞까지 연${\cdot}$경암지역에서의 TBM(Tunnel Boring Machine)으로 시행된 단선터널(7.0m)과 NATM으로 시행한 복선터널의 근접시공에 따른 간벽부 보강설계 내용과 근접부 시공시 계측결과 분석, 지보 Pattern조정 및 시공 실적 등을 제시하였다. 원설계 내용 분석 결과 지보 Pattern이 현장 지반조건에 비해 과다하였고 TBM 굴진시 Thrust 2500kN(본 기계 기준) 이상인 연암이상의 지반에서는 TBM 굴착으로의 효율성이 있었고, 경암구간에서 병행터널의 간섭영향을 배제하려면 터널간의 중심거리가 터널직경의 2배 이상이 되어야 하며, TBM 단선터널(7.0m)의 일 평균 굴진 길이는 4.6m로 분석되었다. 앞으로 이와 유사한 암층에서의 터널근접 시공 및 TBM 굴착시 본 분석내용이 참고가 되기를 기대하여 본고를 작성하였다.

  • PDF