• 제목/요약/키워드: 굴착시스템

Search Result 252, Processing Time 0.026 seconds

Evaluation of pre-developed seismic fragility models of bored tunnels (기 개발된 굴착식 터널의 지진취약도 모델 적용성 평가)

  • Seunghoon Yang;Dongyoup Kwak
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.3
    • /
    • pp.187-200
    • /
    • 2023
  • This study analyzed the seismic fragility of bored tunnels based on their surrounding conditions and suggested a representative seismic fragility model. By analyzing the existed seismic fragility models developed for bored tunnels, we developed weighted combination models for each surrounding conditions, such as ground conditions and depth of the tunnel. The seismic fragility curves use the peak ground acceleration (PGA) as a parameter. When the PGA was 0.3 g, the probability of damage exceeding minor or slight damage was 20% for depth of 50 m or less, 10% for depth between 50 m and 100 m, and 3% for depth of 100 m or more. It was also found that the probability of damage was higher for the same PGA and depth when the surrounding ground was rock rather than soil. The probability of damage decreases as the depth increase. This study is expected to be used for developing a comprehensive seismic fragility function for tunnels in the future.

Turbidity Calibration of Borehole Roughness Measurement System (BKS-LRPS) Usable in Water (수중에서 사용가능한 굴착공 벽면거칠기 측정 시스템(BKS-LRPS)의 굴착공 내 혼탁도 보정에 관한 연구)

  • Park, Bong-Geun;Choi, Yong-Kyu;Kim, Myung-Hak;Kwon, Oh-Kyun;Nam, Moon-S.
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.10
    • /
    • pp.25-32
    • /
    • 2008
  • Based on recent studies, the side resistance of rock socketed drilled shafts was affected by unconfined compressive strength of rock, socket roughness, rock types and joints, and initial normal stress. Especially, the socket roughness was affected by rock types and joints, drilling methods, and diameters of pile. In this study, a new roughness measurement system (BKS-LRPS, Backyoung-KyungSung Laser Roughness Profiling System) usable in water was developed. Based on the laboratory model tests, an EMD (Effective Measurement Distances) according to various turbidity was proposed as $EMD=1149.2{\times}T_{b}^{-0.64}$.

심부시추공 지하수의 심도별 지화학 특성

  • 최현수;고용권;김경수;배대석;김천수
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2002.04a
    • /
    • pp.229-232
    • /
    • 2002
  • 대전 북부 화강암지역 내 심도 500m까지 굴착한 시추공에 다중패커 시스템(Multi-packer system)을 이용하여 구간별로 지하수 시료채취를 수행하고, 시추공 지하수에 대한 지화학 특성 연구를 수행하였다. 다중패커 시스템에 의해 구간별로 격리된 시추공 지하수의 수리화학자료는 구간별로 특징적인 화학조성을 나타낸다 다중패커 시스탬이 설치된 직후 채취한 지하수 시료와 일정시간이 경과한 후 채취한 시료간에는 시기별로 화학특성의 차이를 보이는데 이는 시추당시 사용된 시추수의 영향 때문인 것으로 사료된다. 또한 심도 115m를 기준으로 상부구간과 하부구간에 지화학 특성에서 큰 차이를 보이고 있는데 이는 시추공 굴착당시 단열대의 붕괴로 인해 시공된 그라우팅의 영향 때문이다. 이상치를 보이는 115m 구간을 제외하고, 시추공 지하수의 지화학 자료는 구간별로 명확히 구별되어 화강암 지역에서 지하수의 유동은 단열분포특성에 영향을 받음이 확인되었다.

  • PDF

An Analysis for the Formation and Kinematic Behavior of Potential Tetrahedral Block on the Roof of Underground Excavation (지하공동 천장에 발달된 잠재적 사면체 블록의 판별 및 거동 양상 분석)

  • 조태진;홍관석;김일석
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.5
    • /
    • pp.17-27
    • /
    • 2001
  • 지하 굴착공동의 천장면에 형성되는 잠재적 키블록의 존재성과 운동학적 거동 양상 및 안정성을 해석적으로 분석할 수 있는 시스템을 개발하였다. 천장에서 측정된 절리들의 상대적인 위치와 방향성 자료를 이용하여 데이타베이스를 구축하였으며, 굴착설계도와 연계된 전산절리도를 작성하였다. 잠재적 키블록의 존재성과 거동양상은 사면체로 가정된 블록 옆면의 3차원 공간에서의 평면식을 절리의 방향성에 의거하여 구성하며 대수학적으로 분석되었다. 블록의 안정성 분석은 자중에 의해 미끄러짐이 발생되는 블록면의 공간 기하학적 특성을 고려하여 수행하였다. 개발된 분석시스템의 현장활용성을 검증하기 위하여 언양 자수정동굴에서 키블록 형성 및 거동양상을 조사하여 분석결과와 비교하였다.

  • PDF

Development of Flow Control Block for Hydraulic System of Tunnel Boring Machine (터널 굴착기 유압시스템용 유량 제어 블록 개발)

  • Lee, Jae-Dong;Lim, Sang-Jin
    • Journal of the Korean Society of Mechanical Technology
    • /
    • v.20 no.6
    • /
    • pp.929-935
    • /
    • 2018
  • This paper develops a flow control block for a hydraulic system of a tunnel boring machine. The flow control block is a necessary component to ensure stability in the operation of the hydraulic system. In order to know the pressure distribution of the flow control block, the flow analysis was performed using the ANSYS-CFX. It was confirmed that the pressure and flow rate were normally supplied to the hydraulic system even if one of the four ports of the flow control block was not operated. In order to evaluate the structural stability of the flow control block, structural analysis was performed using the ANSYS WORKBENCH. As a result, the safety factor of the flow control block is 1.54 and the structural stability is secured.

기고(1)-굴착공사 착수 전 원콜(One call)로 가스배관 확인해야

  • Sim, Seong-Geun
    • 월간 기계설비
    • /
    • no.4 s.201
    • /
    • pp.49-52
    • /
    • 2007
  • 정부가 도입하려 하는 원콜시스템(EOCS: Excavation One Call System)은 원콜센터에 전화 한통화를 하면 현장에서 만나 도시가스 매설배관을 지면에 표시해 주기 때문에 신청서 작성이 필요없고 곧바로 업무처리가 가능하다. 이 시스템 도입은 관계부처 협의를 거쳐 법제처 심사를 앞두고 있으며 올 하반기쯤 시행될 예정이다.

  • PDF

A study on drainage system of the room-and-pillar underground structure considering groundwater conditions (지하수 유출수 조건을 고려한 주방식 지하구조의 배수시스템 연구)

  • Lee, Chulho;Hyun, Younghwan;Hwang, Jedon;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.675-683
    • /
    • 2015
  • The room-and-pillar construction method for underground space is adopted from the room-and-pillar mining method which is one of the most popular underground mining method in the world. Drainage system in the room-and-pillar underground construction method can be similar with the concept of single shell in tunnel because additional reinforcement except the TSL (thin spray-on liner) is not applied in the room-and-pillar construction method. That is, to decrease groundwater level and maintain safety in tunnel, the drainage pin hole inside lining (shotcrete) can be used. However, if total amount of outflow in the underground structure is relatively small or groundwater is not detected, such drainage system will not be useful and cause additional construction cost. In this study, outflow of conventional tunnels in South Korea was investigated and the criteria to determine whether the drainage pin hole is effective was suggested. And the guided drainage system was suggested when drainage pin hole was not applied in the room-and-pillar construction method.

Prediction Model for Specific Cutting Energy of Pick Cutters Based on Gene Expression Programming and Particle Swarm Optimization (유전자 프로그래밍과 개체군집최적화를 이용한 픽 커터의 절삭비에너지 예측모델)

  • Hojjati, Shahabedin;Jeong, Hoyoung;Jeon, Seokwon
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.651-669
    • /
    • 2018
  • This study suggests the prediction model to estimate the specific energy of a pick cutter using a gene expression programming (GEP) and particle swarm optimization (PSO). Estimating the performance of mechanical excavators is of crucial importance in early design stage of tunnelling projects, and the specific energy (SE) based approach serves as a standard performance prediction procedure that is applicable to all excavation machines. The purpose of this research, is to investigate the relationship between UCS and BTS, penetration depth, cut spacing, and SE. A total of 46 full-scale linear cutting test results using pick cutters and different values of depth of cut and cut spacing on various rock types was collected from the previous study for the analysis. The Mean Squared Error (MSE) associated with the conventional Multiple Linear Regression (MLR) method is more than two times larger than the MSE generated by GEP-PSO algorithm. The $R^2$ value associated with the GEP-PSO algorithm, is about 0.13 higher than the $R^2$ associated with MLR.

Effect of New Tunnelling on the Behaviour of Grouped Pile and Adjacent Tunnel (신설 터널굴착이 지중 군말뚝 및 인접 터널의 거동에 미치는 영향 연구)

  • Kim, Su Bin;Oh, Dong-Wook;Cho, Hyeon Jun;Lee, Yong-Joo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.509-517
    • /
    • 2022
  • The demand for underground infrastructures such as tunnels is expanding due to rapid urbanization. Tunnels in urban areas are usually constructed adjacent to structures supported by piles. Therefore, a proper understanding of pile-tunnel interaction due to tunnel excavation activities is vital. Thus, in this study, a numerical analysis is conducted to analyze pile settlements, ground surface settlements and shear deformations above an existing tunnel subject to the presence of an adjacent tunnelling, with vertical offsets, the number of piles and the pile spacing considered as variables in the analysis. The results show that the vertical offsets between the tunnel crown and the pile tip generatelarger settlement than the pile spacing. In addition, the vertical offset shows an inversely proportional relationship to the shear deformation due to new tunnelling.