• Title/Summary/Keyword: 굴착량

Search Result 300, Processing Time 0.027 seconds

Developing Predictive Modelling of CO2 Emissions of Construction Equipment Using Artificial Neural Network and Non-linear Regression (인공신경망 및 비선형 회귀분석을 이용한 건설장비의 CO2 배출량 예측 모델 개발)

  • Im, Somin;Noh, Jaeyun;Ro, Sangwoo;Lee, Minwoo;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.16-17
    • /
    • 2019
  • In order to measure the amount of carbon dioxide emitted from the construction sites, many literature which have been conducted have proposed methodologies for calculating coefficients based on actual data collections for estimating the emission formula. The existing data collected under controlled conditions not on site measurement were too limited to apply in actual sites. The purpose of this study is to conduct analysis based on the data measured in fields and to present predictive models using artificial neural network and nonlinear regression analysis for appropriate predictions and practical applications.

  • PDF

A Prediction Model of CO2 Emissions for Construction Equipment Using Curve Fitting (Curve Fitting을 이용한 건설장비 CO2 배출량 예측 모델)

  • Noh, Jaeyun;Kim, Yujin;Lee, Jiyeon;Lee, Minwoo;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.107-108
    • /
    • 2020
  • The severity of the global climate crisis is increasing due to greenhouse gases caused by human activities. As a result, countries and industries are making efforts to reduce carbon dioxide emissions, the biggest cause of global warming. Many studies have been conducted to predict carbon emissions in the construction sector to reduce this, but they have not actually produced a highly usable formula in the field. Therefore, the two variables 'Curve Fitting' were performed based on the data of excavators and trucks measured at the field. As a result, we have obtained a carbon dioxide emission prediction model for construction equipment, and we would like to use it to help establish an eco-friendly process plan.

  • PDF

An Analysis of Long & Short Term Variation for Riverbed in the Moonsancheon (문산천의 장.단기 하상변동 분석)

  • Kang, Kyung-Seok;Park, Mun-Hyun;Kim, Seo-Young;Kim, Kook-Il;Park, Bong-Jin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1535-1540
    • /
    • 2006
  • 하천의 평형상태를 판단하기위해 필요한 두가지 관점은 첫째, 대상 하천이 현재 평형상태에 있는 가이고 둘째, 하천에 하상변동을 일으킬 수 있는 인위적인 영향을 가한 후에 하천반응을 통해 궁극적으로 결정되는 평형상태를 예측하는 것이다. 따라서 본 연구는 하도의 특성을 토대로 하여 현 하도의 평형상태를 정성적인 측면에서 검토하고, 흐름과 유사 이송에 관련된 수학모형을 수치적으로 해석하는 하상변동모형의 분석을 통한 현하도의 안정성 및 하상변동 양상을 파악하는데 그 목적이 있다. 본 연구는 임진강 유역의 충적하천인 문산천을 대상으로 지배유량을 산정한 후 지배유량 유하시의 마찰속도와 무차원 소류력 등의 하도특성량을 산정하여 토사이송이 크게 발생하는 구간을 정성적으로 예측하였다. 예측된 구간의 현장조사결과 $No.29{\sim}No.35$ 구간의 하상의 상승은 개수공사와 수해복구공사로 인한 인위적인 굴착에 대한 퇴적으로 하천이 평형상태로 환원하고자 하는 것으로 판단되었고, $No.41{\sim}No.54$ 구간의 하상저하는 문산천 상류구간의 큰 하상경사와 보의 영향인 것으로 조사되었다. 또한 1, 2차원 모형에 의한 장 단기 하상변동 분석결과 하도특성량을 이용한 하도의 안정성 평가와 유사한 결과를 보였다. 따라서 문산천의 경우 하상변동의 양상 파악 및 하도의 안정성 판단을 하는데 있어 하도특성량을 근거로 판단하는 방법의 적용가능성을 파악할 수 있었다.

  • PDF

The Inflence of Excavation Damaged Zone around an Underground Research Tunnel in KAERI (한국원자력연구원 내 지하처분연구시설 주변의 암반 손상대 영향 평가)

  • Kwon, S.;Kim, J.S.;Cho, W.J.
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.11-19
    • /
    • 2008
  • The development of an excavation damaged zone, EDZ, due to the blasting impact and stress redistribution after excavation, can influence on the long tenn stability, economy, and safety of the underground excavation. In this study, the size and characteristics of an EDZ around an underground research tunnel, which was excavated by controlled blasting, in KAERI were investigated. The results were implemented into the modelling for evaluating the influence of an EDZ on hydro-mechanical behavior of the tunnel. From in situ tests at KURT, it was possible to determine that the size of EDZ was about l.5rn. Goodman jack tests and laboratory tests showed that the rock properties in the EDZ were changed about 50% compared to the rock properties before blasting. The size and property change in the EDZ were implemented to a hydro-mechanical coupling analysis. In the modeling, rock strengths and elastic modulus were assumed to be decreased 50% and. the hydraulic conductivity was increased 1 order. From the analysis, it was possible to see that the displacement was increased while the stress was decreased because of an EDZ. When an EDZ was considered in the model, the tunnel inflow was increased about 20% compared to the case without an EDZ.

Seepage Behavior with Unsaturated Soil-Water Characteristic in Reclaimed Deep Excavation Area (해안매립지 대심도 굴착지역의 불포화 함수특성에 따른 침투류 거동)

  • Shin, Bang-Woong;Lee, Heung-Gil
    • Journal of the Korean GEO-environmental Society
    • /
    • v.6 no.4
    • /
    • pp.47-58
    • /
    • 2005
  • Development of underground space is conducted for various useful facility and underground structures and deep excavation technology for reclaimed area has been researched and developed. The seepage flow and behavior of phreatic line in reclaimed area was predominated by transient flow caused by tidal action. Also the soil-water characteristic relation is most important factor for transient flow analysis, therefore the research about the soil-water characteristic is strongly required. In this paper, laboratory tests (pressure cell, desiccator, and tensiometer test) and theoretical analysis were performed to investigate the soil-water characteristic such as air-entry value, metric suction, and residual water content. And the feasibility of prediction method for soil-water characteristic are presented by transient seepage analysis and comparison between analysis results and in-situ measured seepage flux in LNG TK-00 storage tank. Based on the result of laboratory and theoretical analysis, Fredlund and Xing's method provide to work out well for reclaimed ground soils. Also, the transient analysis result is more reasonable and effective for design of deep excavation work in coastal and reclaimed ground.

  • PDF

Optimum Reinforcement Conditions of Large Diameter Reinforcement for Steep Slope of Conventional Railway Embankment under Train Loading (기존선 성토사면 급구배화를 위한 열차 하중 하 대구경 봉상보강재의 최적 보강조건)

  • Kwak, Chang-Won;Kim, Dae-Sang
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.11
    • /
    • pp.43-50
    • /
    • 2016
  • A reinforcement is required to ensure the structural safety in case of railway embankment excavation under railway load. A large diameter soil nailing with concrete wall is applied as the reinforcement method instead of the conventional soil nailing system. In this study, a series of 3 dimensional numerical analyses are performed to investigate the optimum reinforcement considering 15 different conditions based on the length, lateral spacing, diameter, and inclination of the reinforcement. The interface between soil nail and perimetric grout is considered by means of cohesion, stiffness and perimeter of the grout. 0.3 m of reinforcement diameter is assessed as the most appropriate based on the economical viewpoint though ground displacement decreases with the increase of diameter, however the difference of displacement is negligible between 0.4 m and 0.3 m of diameter. Surface settlement, lateral displacement of wall, and stress of reinforcement are calculated and economic viewpoint to reinforce embankment considered. Consequently, the optimum reinforcement conditions considering those factors are evaluated as 3 m in length, 0.3 m in diameter, 1.5 m in lateral spacing, and 10 degree of inclination angle in the case of 3 m of excavation depth. Additionally, inclined potential failure surface occurs with approximately 60 degrees from the end of nails and the surface settlement and wall lateral displacement are restrained successfully by the large diameter soil nailing, based on the result of shear strain rate.

Behavior of braced wall due to distance between tunnel and wall in excavation of braced wall nearby tunnel (터널에 인접한 흙막이굴착 시 터널 이격거리에 따른 거동특성)

  • Ahn, Sung Joo;Lee, Sang Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.4
    • /
    • pp.657-669
    • /
    • 2018
  • In recent years, the development of complex urban areas has become saturated and much attention has been focused on the development of underground space, and deep excavation is frequently performed in order to increase the utilization of underground space due to the enlargement of buildings and the high rise of buildings. Therefore, in this study, we tried to understand the behavior of the braced wall and the behavior of the tunnel adjacent to the wall according to the stiffness of the wall and the distance between the tunnel and wall. As a result of the study, the deformation of the braced wall tended to decrease with increasing the stiffness of the wall, and the axial force acting on the struts was also different according to the stiffness of braced wall. When the stiffness of the braced wall is small (2 mm), the point at which the axial force of the braces maximizes is near 0.3H of the wall. When the stiffness of the braced wall is large (5 mm), the axial force is maximum at around 0.7H of the wall. Also, the tunnel convergence occurred more clearly when the separation distance from the braced wall was closer, the stiffness of the wall was smaller, and the tunnel convergence was concentrated to the lower right part. The ground settlement due to the excavation of the ground tended to decrease as the distance between tunnel and braced wall was closer to that of the tunnel, which is considered to be influenced by the stiffness of the tunnel.

A Study on the Excavation of the Center Wall for the Evacuation Passageway in the Operating 2-Arch Tunnel (운행 중인 2-Arch 터널의 피난연결통로 신설을 위한 중앙벽체 굴착에 관한 연구)

  • Lee, Jong-Hyun
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.3
    • /
    • pp.454-464
    • /
    • 2021
  • Purpose: There is a need to construct an evacuation passageway for the 2-Arch tunnel, which has been constructed and is in operation. Therefore, it aims to analyze tunnel and center wall behaviour and stability due to excavation of the center wall. Method: We describe the theoretical background of 2-Arch tunnel and evacuation passageway, and focused on analyzing the behaviour of tunnel and wall using 3-dimensional finite element analysis. Parametric analysis according to rock rating was performed with various ground conditions, and the displacement and stress of the center wall were intensively analyzed. Result: With the center wall excavation, the largest amount of settlement was shown in the center of the opening, and the stress was greatest during the first excavation. In addition, it was shown that stress concentration occurred at the top of both openings, and stability reviews considering the concept of allowable stress showed that it exceeded the allowable stress. Conclusion: Although the displacement of the tunnel has secured stability within the allowable standard, the generated stress is found to exceed the allowable standard, so it is necessary to prevent sudden stress release by applying appropriate reinforcement methods during construction.

A Study on Prediction of Earth Retaining Work Cost in the Project Planning Stage -Focusing on Apartment Construction Projects in Seoul- (사업기획단계에서 흙막이 공사비 예측에 관한 연구 -서울시내 아파트 건설사업을 중심으로-)

  • Lee, Jin-Kyu;Yang, Kyung-Jin;Park, Ki-Hyeon;Kim, Chan-kee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.385-392
    • /
    • 2021
  • In general, earth retaining work in construction works enables the construction of structures, prevents the displacement of the surrounding ground to the maximum extent, and plays an important role in ensuring the safety of the surrounding structures and field workers. The earth retaining work and the construction method differ according to the various ground characteristics, surrounding topographical characteristics, repair environment, and design conditions. In particular, in the case of Seoul city, the environments and ground conditions differ according to the area. This study analyzed the earth retaining work cost mainly for the apartment construction project in Seoul and calculated the approximate earth retaining work cost at the project planning stage. A model was developed to predict the cost of earth retaining work that matches the characteristics of Seoul City and predict the construction cost for earth retaining work. This paper presents the predicted earth retaining work cost using a multiple regression model that applies 10 project outlines as independent variables. The error rate of the prediction result of the earth retaining work cost of the apartment construction project in Seoul using multiple regression models was 10.75%.

Estimation of Greenhouse Gas Reduction Potential by Treatment Methods of Excavated Wastes from a Closed Landfill Site (사용종료매립지(使用終了埋立地) 폐기물(廢棄物)의 처리방법별(處理方法別) 온실(溫室)가스 저감량(低減量) 평가(評價))

  • Lee, Byung-Sun;Han, Sang-Kuk;Kang, Jeong-Hee;Lee, Nam-Hoon
    • Resources Recycling
    • /
    • v.22 no.6
    • /
    • pp.3-11
    • /
    • 2013
  • This study was carried out to estimate greenhouse gas reduction potentials under treatment methods of combustible wastes excavated from closed landfill. The treatment methods of solid wastes were landfilling, incineration, and production of solid recovery fuel. The greenhouse gas reduction potentials were calculated using the default emission factor presented by IPCC G/L method of IPCC (Intergovernmental Panel on Climate Change). The composition of excavated waste represented that screened soil was the highest (65.96%), followed by vinyl/plastic (19.18%). This means its own component is similar to the other excavated waste from unsanitary landfill sites. Additionally, its bulk density was 0.74 $t/m^3$. In case of landfilling of excavated waste, greenhouse gas emission quantity was 60,542 $tCO_2$. In case of incineration of excavated waste, greenhouse gas emission quantity was 9,933 $tCO_2$. However, solid recovery fuel from excavated waste reduced 33,738 $tCO_2$ of the greenhouse gas emission quantity. Therefore, solid recovery fuel production is helpful to reduce of greenhouse gas emission.