A Study on the Operation Development Method through the Application Results Large-Diameter Tunnel (대구경 터널공법 적용 사례분석을 통한 운영 개선방안)

  • Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.2
    • /
    • pp.108-118
    • /
    • 2012
  • The application of TBM tunneling has been progressively increased since the first entrance into korea in 1985. In order to an apprehension and operation development of TBM method which has excellent boring in hard rock tunnel, this study has analyzed mutual relation of lose time and TBM boring from actual construction results TBM tunneling. This study compared this analyzed results with TBM tunnelling construction results of korea, america, japan, analyzed a primary factor of TBM boring effect and suggested operation development method from the analyzed results. accordingly this study can be used an index when contract apply TBM method to planning steps.

The study on the tunnel double-deck blasting methods using electronic blasting systems (더블데크 전자발파를 이용한 터널 발파공법 개발 연구)

  • Lee, Jong-U;Mun, Hong-Pyo;Kim, Nam-Su;Lee, Gang-Il
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.23 no.4
    • /
    • pp.38-48
    • /
    • 2021
  • 최근 국내 건설현장들은 도심지 근접구간에서 발파진동피해를 최소화하기 위하여 전자뇌관을 이용한 미진동 전자발파공법 적용사례가 증가하고 있는 추세이다. 그러나 미진동 전자발파는 무진동 암파쇄 대체공법으로 경제성은 우수하나 시공현장에서 진동을 제어하는 공법으로 1회 굴진장을 1m 이하로 적용하고 있어 시공속도가 저하되는 문제점이 발생하고 있다. 따라서, 미진동 전자발파 수준의 진동제어와 굴착비 절감 및 시공속도를 높일 수 있는 더블데크 발파공법을 연구 및 시험을 수행하였다. 미진동 전자발파와 더블데크 전자발파 비교 시험결과 진동레벨, 발파효율, 파쇄입도, 여굴량 등이 비슷한 수준으로 평가되어 현장 적용시 굴진장 증대로 인한 공사기간 단축 및 시공비 절감이 가능할 것으로 판단되었다.

A risk analysis for the determination of a tunnel support pattern (터널 지보패턴 결정을 위한 위험도 분석)

  • You, Kwang-Ho;Park, Yeon-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.3
    • /
    • pp.241-250
    • /
    • 2003
  • Rock mass is very inhomogeneous in nature and data obtained by site investigations and tests are very limited. For this reason, many uncertainties are to be included in the process of constructing structures in rock mass. In the design of a tunnel, support pattern, advance rate, and excavation method, which are important design parameters, must be determined to be optimal. However, it is not easy to determine those parameters. Moreover if those parameters are determined incorrectly, unexpected risk occurs such as decrease in the stability of a tunnel or economic loss due to the excessive supports etc. In this study, how to determine an optimal support pattern and advance rate, which are the important tunnel design parameters, is introduced based on a risk analysis. It can be confirmed quantitatively that the more supported a tunnel is, the larger reliability index becomes and the more stable the tunnel becomes. Also an optimal support pattern and advance rate can be determined quantitatively by performing a risk analysis considering construction cost and the cost of loss which can be occurred due to the collapse of a tunnel.

  • PDF

A Study on the Comparison of Conventional Blasting vs Air-Tubes Blasting in the Tunnel (터널발파에서 일반발파와 AIR-TUBES발파의 비교연구)

  • 진정무;양국정;이천식;심동수;김용균;강대우
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.49-58
    • /
    • 2002
  • 발파공법이 소개된 이후로 계속해서 많은 우수한 발파이론이 발표되어 왔다. 그러한 이론들의 저변에 있는 궁극적인 목표는 효율의 증가와 경제성이다. 이에 본 연구는 Air-Tubes 발파공법을 소개하고 터널에서 일반발파와 비교하여 그 발파효율을 검토해 보았다 연구의 배경이 되는 곳은 산청군 시천면 내대리와 하동관 묵계리를 연결하는 2차선 국도 터널 공사 현장이며 전체 총연장은 2Km이다. 진동측정방법은 하나의 발파진동을 4개의 측정기로 측정하여 데이터분석에 사용하였다. 일반발파와 Air-Tubes의 진동측정을 4개소에서 각각 6회씩 실시하여 총 24개씩의 진동측정 데이타를 얻었고 회귀분석을 실시하여 95% 신뢰도의 발파진동 추정식을 얻었다. 시험발파 및 진동측정에 이어 매 발파마다 광파측량을 실시하여 진행장을 구하였으며 사용한 장약량은 Air-Tubes 발파시 25% 정도 적게 사용하였고 발파진동이 23% 감소하였다. 발파당 굴진장 및 Smooth blasting 발파시의 벽면의 상태는 동일하고 파쇄석의 크기는 Air-Tubes 발파시 더 작게 나타난다.

A Case Study of Minimizing Construction Time in Long and Large Twin Tube Tunnel (대단면 장대터널 공기단축 사례연구)

  • No Sang-Lim;Noh Seung-Hwan;Lee Sang-Pil;Kim Moon-Ho;Seo Jung-Woo
    • Tunnel and Underground Space
    • /
    • v.15 no.3 s.56
    • /
    • pp.177-184
    • /
    • 2005
  • The Sapaesan tunnel, the longest twin tube tunnel (4km) in Korea with 4 lanes each, is under construction with two years of delayed schedule because of the strong opposition from environmental bodies. Therefore, maximizing the construction efficiency was needed in tunnel project to compensate for time delay. This study includes improvements in the construction of the Sapaesan tunnel such as increasing excavation length and changing excavation sequence. In this paper the system for predicting tunnel face ahead is also introduced. Bulk-Emulsion explosive and Cylinder-Cut method were adopted in tunnel blasting to increase the excavation length. Optimum tunnel excavation step was designed to make up delayed time. Tunnel foe mapping, TSP survey and geological prediction system using computerized jumbo-drill were performed fnr safe construction of long and large twin tube tunnel.

A Study on the Operation Development Method through the Application Result TBM Tunneling in the Bard Rock (암반터널에서의 TBM 공법 적용 사례 분석을 통한 운영 개선 방안)

  • Song, Young-Sun;Choi, Jae-Jin;Park, Hong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.4
    • /
    • pp.1050-1058
    • /
    • 2008
  • The application of TBM tunneling has been progressively increased since the first entrance into Korea in 1985. In order to an apprehension and operation development of TBM method which has excellent boring in hard rock tunnel, this study has analyzed mutual relation of lose time and TBM boring from actual construction result TBM tunneling. This study compared an analyzed result with TBM tunnelling construction results of Korea, America, Japan, analyzed a primary factor of TBM boring effect and suggested operation development method from the analyzed results. accordingly this study can be used an index when similar construction apply TBM method to planning steps.

A Case Study of Application of the Emulsion Explosives in Long Hole Tunnel Blasting (장공 터널발파에서 Emulsion폭약의 시공사례와 적용성에 관한 연구)

  • 조영곤;김희도;이상돈
    • Explosives and Blasting
    • /
    • v.19 no.1
    • /
    • pp.31-40
    • /
    • 2001
  • 일반적으로 장공발파(長孔發破) 방법(Long hole blasting method)은 그동안 주로 대규모 채탄막장이나 댐 기초굴착, 광산 등에서 행하여져 왔으나 최근 토목터널에서 시공 효율성 및 경제성을 목적으로 관심이 높아지고 있다. 기존의 터널설계 패턴은 I -Type을 기준으로 3.5~3.8m 천공이며 신공법 적용시 최대 4.Om까지 설계되는 것이 보통이었다. 과거 착암장비는 천공장이 늘어남으로서 슬러지에 의한 천공속도가 저하되어 천공비가 증가하기 때문에 빠른 슬러지 배제가 필요하고 Rod의 휨 현상에 의한 천공오차의 증대를 초래할 수 있는 단점이 있었다. 그러나 최근 장비의 발달로 인하여 천공각도 및 천공장 등을 Computer로 모니터링하여 제어할 수 있어 정밀한 천공이 가능하여 졌고 또한, 고성능 에멀젼계 폭약(Super Emulsion)의 개발로 그동안 극 경암터널에서 에멀젼계 폭약의 단점으로 여겨졌던 비 장약량의 증대와 사압현상의 발생, 굴진효율 저하문제론 극복할 수 있었다. 따라서 본 연구는 현재 건설중인 대상현장을 중심으로 장공 터널발파의 효율성과 경제성을 분석하고 나아가 암질에 따른 새로운 Type별 설계기준을 마련하는 기초자료로서 활용하고자 하였다. 된 연구의 대상현장은 충북 괴산군 영풍면 소재 중부내륙(여주-구미간) 고속도로 제 9공구 이화터널 건설공사현장으로 $\varphi{102mm}$ 무 장약공 Cylinder 4공을 이용한 심발법을 사용하였으며 천공장은 최대 5.0m로 2000년 11일 15일에서 동년 12월 15일까지 31일간 총 112회의 시험발파를 실시하여 평균 92%의 높은 굴진 효율을 기록하였다.

  • PDF

A study on key factors of ground surface settlement due to shield TBM excavation using 3-dimension numerical analysis (3차원 수치해석을 이용한 Shield TBM 굴진시 지표침하 주요 영향요소 분석)

  • Jun, Gy-Chan;Kim, Dong-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.305-317
    • /
    • 2015
  • This paper is to perform 3-dimensional numerical analysis considering face pressure, backfill pressure, excavation length, soil model and element size for selecting key factors of ground surface settlement due to shield TBM advancement. According to the numerical analysis results, backfill pressure and soil model are governing factors inducing ground surface settlement. To complement this study, the ground conditions and characteristics of the boring machine will be considered using numerical analysis.

The Construction of large and Long Tunnel Using Bulk Explosives (벌크폭약을 이용한 대단면 장대터널 시공 사례)

  • 노상림;문상호;조영천;이상필;유지영
    • Explosives and Blasting
    • /
    • v.22 no.3
    • /
    • pp.65-70
    • /
    • 2004
  • Lately, the length of tunnel, the number of long-large tunnel over 3 lanes are steeply increased because of the request for high-speed and straight road. Therefore, the maximization of excavation efficiency is needed in tunnel construction. The sapaesan tunnel (4 lanes with the length of 4km) construction was delayed with environmental conflict far 2 years. For making-up delayed construction period, various new methods were adopted to improve excavation length, look-out and blasting efficiency. This study introduced bulk explosive which is new method in tunnel blasting and verified the efficiency of bulk explosive far long-large tunnel.

Development of Automated Pattern Generation Method for Tunnel Blasting (터널발파설계 자동화를 위한 발파패턴 설계식 개발)

  • Choi Yong-Kun
    • Explosives and Blasting
    • /
    • v.23 no.4
    • /
    • pp.19-29
    • /
    • 2005
  • Blasting design methods applied in Korea were originally made for foreign rock conditions and blasting environments. Therefore, it has not been fully fitted to the Korean rock renditions. Since 1998, several studies for the automated pattern design of tunnel blasting have been carried out. As the result, a new blasting design method which can settle the problems was developed. Through it is more complex than prior method, it call provide a variety of advantages for us. Through the method, it is possible to vary charge weight according to the changing advance. It ran also be applied to the various design for contour holes. In this study, the newly developed method is introduced.