This study was performed for developing upscaling Environmental Conservation Value Assessment Map(ECVAM) of National Land in South Korea and presenting the application method of ECVAM. This ECVAM adopted the least indicator method and uses a Geographic Information System(GIS). This map is made through evaluation of 67 items. As a result, the construction of ECVAM was defined as a process of identifying land use to scientifically assess the physical and environmental value of land and classify conservation value into several grades for the sustainable management of environmental resources. After applying ECVAM criteria of five degrees to the whole of study area, Grade I, showing the highest conservation value, accounted for 29.3% by land area of ECVAM. Grades II, III, IV and V likewise accounted for, respectively, 21.7%, 17.2%, 7.1% and the lowest conservation value of 24.7%. other result, ECVAM and land suitability assessment agreement rate is Grade I 33.05%, Grades II, III, IV and V likewise accounted for 12.92%, 15.05%, 36.93% and last value of 53.28% This study set up "the realization of the improvement ECVAM" as the vision of the advancing strategy. In order to accomplish the vision, this study established the purpose as follow; constructing strategic assessment value relation to ECVAM based on knowledge, arranging the foundation to upscaling assessment value And this study devised preparatory plans to achieve the vision and the purpose as next; construction on base theme map by 1:5,000 scalie, base on land register theme map and precision land cover map. Therefore, for applying the result of this study to the upscaling Environmental Conservation Value Assessment Map(ECVAM), it considers regularly the systematic categorization of preceding item, consideration issue of national environmental geographic information using the ECVAM.
Korean Journal of Construction Engineering and Management
/
v.6
no.6
s.28
/
pp.107-114
/
2005
The time and cost is the most important information for the construction project management. Currently, a lot of studies have been done in order to clearly relate them with each other, but there have been some difficulties. Because of the characteristic of Korean government contract law, the construction project in Korea is managed by only cost and the time and cost information is distinctly separated. In order to manage all the major construction project information smoothly, the time and cost information should have relation with each other. This study suggest methods for relating the time and cost information, especially for road construction project of MOCT. Through the survey of construction field engineers and case study of the road construction project, several alternatives to improve the usability of construction information are suggested in this study. These alternatives can support relating other construction information.
Recently, a lot of interests are commanding in link practical use of country information and cadastral information for management of efficient country resource and administration of land. As map information, a lot of interests are commanding in construction of synthetic informations system including digital map and cadastral map. In this study, achieves analysis about non-coincidence causes of digital map and cadastral map, and achieve investigation about representative algorithm that is used in conversion of map for correct overlay between two map and opes overlay plan. Also, presented plan that can ready fetters for integration database construction of digital map and cadastral map by achieving study about matching security plan between map and plan elevation of the quality.
Lee, Young-Sung;Kim, Kab-Sung;Lee, Choon-Won;Kwon, Dae-Jung;Yu, Hyeon-Ji;Yun, Hyung-Seok;Kim, Jin
Journal of Cadastre & Land InformatiX
/
v.49
no.2
/
pp.23-38
/
2019
The National Land Census Project aims to survey the national land regularly to resolve the land category disagreement and reflect the actual land use. The objective of this study is to investigate whether not only the National Land Census Project but also related land and housing surveys bring about the improvement of social welfare in light of the invested budget, and to measure the project feasibility. The potential benefit after the National Land Census Project is not traded in the market. To determine the economic value of this potential benefit, the Contingent Valuation Method was used. This study utilized the single-bounded and double-bounded dichotomous choice models simultaneously to estimate the project feasibility of the cadastral system improvement. According to this study, cost-benefit ratio of the project was estimated larger than 1, which means that social benefits are larger than social costs.
Jang, Chorok;Jang, Moon Yup;Song, Juil;Kim, Han Tae
Proceedings of the Korea Water Resources Association Conference
/
2021.06a
/
pp.486-486
/
2021
국가에서는 수해예방 및 주민들의 삶의 질 향상을 위해 다양한 하천사업을 수행한다. 국토교통부의 경우 매년 막대한 예산을 투입하여 하천정비 및 재해복구사업 등을 추진 중에 있으나, 체계적인 공사관리와 산출물의 전산화를 위한 시스템은 부재한 실정이다. 현재 건설사업정보시스템(건설CALS)을 통해 하천공사에 관한 정보를 확인할 수 있으나 총 공사비, 참여업체 등 기본적인 정보만을 제공하고 있으며, 공정관리 및 예산정보에 관한 상세한 내역을 확인 및 관리할 수 있는 기능은 부재하다. 이러한 문제를 해결하고자 본 연구에서는 하천사업(공사)관리시스템의 필요성을 제시함과 동시에 우선적으로 하천사업 공종 표준화를 수행하고자 한다. 현재 건설공사표준품셈을 통해 건설공사의 공종을 확인할 수 있으나 '제2장 하천공사' 내에는 사석, 돌망태, 하천호안공에 관한 정보만을 담고 있다. 하천공사 공종 표준화를 진행하게 될 경우 공종별 공사 세부정보에 대한 관리가 가능해지며, 현재 하천을 관리 중인 국토교통부, 지방국토관리청 및 지자체 등 하천사업을 수행 중인 기관의 시스템 활용도를 제고할 수 있다. 하천사업 공종표준화를 위해 우선적으로 현재 건설공사표준품셈, 도로대장 전산화 입력지침 등기 수립된 지침 및 기준을 통해 건설토목공사 시의 공종을 조사·분석한 후, 하천공사 준공보고서 및 감리보고서 등 공사 관련 자료를 활용하여 하천공사에 주로 수행되는 공사들에 관한 종류를 도출하였다. 이후 건설토목공사 공종과의 비교·분석을 통해 하천공사에서 주로 수행되는 공종을 도출·표준화하는 작업을 진행하였다. 본 연구에서 제시한 하천사업 공종의 경우 향후 하천사업(공사)관리시스템 개발에 활용이 가능하며, 하천공사 관리의 효율성을 극대화할 수 있다.
Journal of the Korean Association of Geographic Information Studies
/
v.5
no.3
/
pp.45-54
/
2002
The purposes of this paper are to review the shifts and changes in urban planning environment, and to grasp how the new 'National and Urban Planning Law' accommodates these changes. In order to accomplish proposed schemes, I suggest that the following three details should be considered for the proper way of Urban Planning Information System(UPIS) from the beginning stage. First, new techniques are required to realize the new concepts in 'National and Urban Planning Law' with GIS and constructed DB by NGIS, as planning support systems. Second, the status of UPIS rises to the highest status among land-related information systems. Third, to adapt the UPIS to the decision support system, the restructuring of urban planning itself should be proceeded under considering the changes of concepts, paradigms and techniques.
This study estimated the delay factor, which is the ratio of travel time at the speed limit and travel time at the actual speed using real-time traffic information in Seoul. The actual travel speed on the road was lower than the maximum speed of the road and the travel speed was the slowest during the rush hour. As a result of accessibility analysis based on travel speed during the rush hour, the travel time at the actual speed was 37.49 minutes on average. However, the travel time at the speed limit was 15.70 minutes on average. This result indicated that the travel time at the actual speed is 2.4 times longer than that at the speed limit. In addition, this study proposedly defined the delay factor as the ratio of accessibility by the speed limit and accessibility to actual travel speed. As a result of delay factor analysis, the delay factor of Seoul was 2.44. The results by the administrative district showed that the delay factor in the north part areas of the Han River is higher than her south part areas. Analysis results after applying the relationship between road density and traffic volume showed that as the traffic volume with road density increased, the delay factor decreased. These results indicated that it could not be said that heavy traffic caused longer travel time. Therefore, follow-up research is needed based on more detailed information such as road system shape, road width, and signal system for finding the exact cause of increased travel time.
Recently airspace became a hot issue considering today's international relations. However, there was no data that could be fully explained about a legal system of korean airspace, so I looked at law and practice about korean airspace together. The nation's aviation law sector is comletely separate from those related to civil and military aircraft, at least in legal terms. The Minister of Land, Infrastructure and Transport shall carry out his/her duties with various authority granted by the "Aviation Safety Act". The nation's aviation-related content is being regulated too much by the Ministry of Land, Infrastructure and Transport's notice or regulation, and there are many things that are not well known about which clauses of the upper law are associated with. The notice should be clearly described only in detail on delegated matters. As for the airspace system, the airspace system is too complex for the public to understand, and there seems to be a gap between law and practice. Therefore, I think it would be good to reestablish a simple and practical airspace system. Airspace and aviation related tasks in the military need to be clearly understood by distinguishing between those entrusted by the Minister of Land, Infrastructure and Transport and those inherent in the military. Regarding matters entrusted by the Minister of Land, Infrastructure and Transpor, it is necessary to work closely with the Minister of Land, Infrastructure and Transport when preparing related work guidelines, and to clarify who should prepare the guidelines. Regarding airspace control as a military operation, policies or guidelines that are faithful to military doctrine on airspace control are needed.
Journal of the Korea Academia-Industrial cooperation Society
/
v.20
no.2
/
pp.773-784
/
2019
With the recent development of 4th industrial revolution technology, BIM information systems are spreading to civil engineering fields as a link to this technology. Accordingly, the Land, Infrastructure and Transport Ministry is announcing a technical policy to introduce the BIM information system into the construction sector from 2020. Usually, SOC-related facilities are complex, making it difficult to implement BIM without a standards framework. To overcome these problems, it is urgent to develop a BIM standard classification system. In this study, the BIM property classification system was developed to link the previously developed object classification system by analyzing domestic and foreign prior studies and working standards. This includes property information of businesses, facilities, parts of facilities and components that correspond to the level of object composition in the road and river sectors. It also suggested ways to apply expansion to various SOC areas and to organize spatial information by facility. The results of this study were applied to road facilities to verify the possibility of information building. The development of the BIM Standards Classification System through this R&D will contribute to the development of construction IT by providing conditions for convenient modeling and information system.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2016.05a
/
pp.139-140
/
2016
최근 대도심지를 중심으로 빈번히 발생하고 있는 지반침하, 지반함몰, 도로붕괴 등의 지하안전사고로 인해 정부는 지하안전 대책 수립에 만전을 기하고 있다. 특히, 국토교통부는 지하공간통합지도 구축 기본계획을 수립하고 본사업에 박차를 가하여 지하공간 안전관리체계를 마련하고자 하고 있다. 그러나 국토교통부에서 구축계획하고 있는 지하공간통합지도는 서울, 부산, 대전 등 대도시를 중심으로하고 있어, 태풍, 집중호우 등에 의한 지반침하 및 함몰 등의 안전사고가 우려되는 항만구조물을 관리하기에는 어려운 실정이다. 이에 본 연구에서는 항만구조물의 안전관리를 위한 지하공간통합지도 구축 방안을 제시하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.