• Title/Summary/Keyword: 교량도로

Search Result 439, Processing Time 0.025 seconds

Development of Dry Process Caisson Method for Maintenance of Submerged Harbor Structure (수중 항만구조물의 유지보수를 위한 건식 케이슨 공법 개발)

  • Lee Joong-Woo;Oh Dong-Hoon;Kwak Seung-Kyu;Kim Sung-Tae
    • Journal of Navigation and Port Research
    • /
    • v.30 no.6 s.112
    • /
    • pp.447-455
    • /
    • 2006
  • Together with the trend of enhancement in domestic industrial development and economic progress due to import and export, the demand for construction of the roads, bridges, especially port facilities, and several coastal protection and ocean structures is increasing rapidly. MOMAF of Korean Government is driving construction cf 9 new ports and renovation cf the existing fishery ports. Among these structures most of bridge base, wharves, dolphins, quays, and jetties are being newly built cf steel or concrete pile. As the base, supporting bulkheads, and piles are underwater after construction, it is difficult to figure out the status of structures and not enough to get maintenance and strengthen the structures. Every year, moreover, these works suck the government budget due to higher incomplete maintenance expense for protection from corrosions cf structures and increased underwater construction period. For the purpose cf cutting down the expense cf government budget, it is necessary to extend the life cycle of the existing structures. Therefore, we developed a new method for maintenance of submerged structures near the waterline by allowing dry work environment with the floating caisson. The method shows easy to move around the working area and handle. It also showed not only a significant reduction of maintenance expenses and time for anti-corrosion work but also better protection This will be a milestone to reduce the maintenance and construction expenses for the shore and water structures.

The Characteristics of Disaster by Track of Typhoon Affecting the Korean Peninsula (한반도 영향 태풍의 이동경로에 따른 재해 특성)

  • Ahn, Suk-Hee;Kim, Baek-Jo;Lee, Seong-Lo;Kim, Ho-Kyung
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.3
    • /
    • pp.29-36
    • /
    • 2008
  • The purpose of this study is to examine the characteristics of disaster associated with typhoon passed through the sea areas excluding the South Sea around the Korean Peninsula. First, Korean peninsula-affecting typhoons were divided into their track patterns of passing through the Korean West Sea and East Sea based on typhoon data from 1951 to 2006 provided by Regional Specialized Meteorological Center(RSMC)-Tokyo. Then, annual and monthly frequency and intensity of typhoon in each pattern was examined. In particular, typhoon related damages during the period of 1973 to 2006 were analyzed in each case. Results showed that since early 1970, in the West Sea case, typhoon becomes weaker without significant change in frequency, while in the East Sea case, it becomes stronger with an increasing trend. It is also found that the high amount of typhoon damage results from the submergence of houses and farmlands in the East Sea case, while it is due to the breakdown of houses, ships, roads and bridges in the West Sea case. In addition, it is revealed from the analysis of rainfall and maximum wind speed data associated with typhoon disasters that the main cause of occurring typhoon disasters seem to be qualitatively related to strong wind in the West Sea case and heavy rainfall in the East Sea case.

Rectification of Smartphone Image Based on Reference Images for Facility Monitoring (시설물 모니터링을 위한 기준영상 기반 스마트폰 영상의 기하보정)

  • Kim, Hwiyoung;Choi, Kyoungah;Lee, Impyeong;Yoon, Hyuk-Jin
    • Korean Journal of Remote Sensing
    • /
    • v.33 no.2
    • /
    • pp.231-242
    • /
    • 2017
  • Monitoring of facilities such as roads, dams and bridges is important for their long-term sustainable usage. It has usually suffered with safety and cost problems, which makes more frequent monitoring difficult. As an efficient and economicalsolution to these problems, one may consider the use of smartphone to capture the status of the facilities. To derive quantitative analysis results with the smartphone images for facility monitoring, one should first rectify the images in a way as automatic and economical as possible. In thisstudy, we propose such a rectification method, which rectifiessmartphone images acquired from arbitrary locations based on reference images.In the proposed method, we determine the camera extrinsic parameters of each smartphone images using the reference imagesrather than ground control points, and project the image to the target surface of the facility based on the determined camera parameters. The method were applied to test data acquired from a small dam toward water-area facility monitoring. The experimental results showed that the camera extrinsic parameters were determined with the accuracy of 5 cm and $0.28^{\circ}$ in the position and attitude. The accuracy of the distance measured from the rectified image was evaluated to 10 cm. With the rectified images, one can accurately determine the location and length of the target objects required for facility monitoring.

A Study on Normal Project Duration for Water Resource Project (수자원시설 건설공사 표준공기 산정을 위한 기초연구)

  • Lee, Bongsu;Kim, Kinam;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.35-43
    • /
    • 2015
  • It is important to have enough design and construction duration for infrastructure projects. However, recent water resource project in Korea shows several problems caused by their fast-tract schedule. National Audit Committee report several water resource projects have quality problems caused by insufficient project duration. Especially, water resource projects such as dam and water pipeline construction should have proper time to secure their structure quality. Normal project duration for these projects should be estimated based on previous similar projects' historical data analysis. However there is no standard model which can estimate normal project duration for water resource projects in Korea. There are several normal project duration estimation models for building project developed by public(LH) and private construction companies. However, there is no proper model for water resource projects. So, this study developed normal project duration model for dam and water pipeline projects using historical data and show application of models.

A Study on Effectiveness for Car-Crash Fires Prevention through a Full-length Speed Enforcement System in Highway Tunnels (고속도로 터널내 차량추돌화재사고를 방지하기 위한 구간과속단속시스템 설치에 관한 통계적 연구)

  • Lee, Young-Jae;Kim, Gab-Cheol;Park, Hyung-Joo
    • Fire Science and Engineering
    • /
    • v.25 no.5
    • /
    • pp.119-127
    • /
    • 2011
  • Because of most notably the increase in vehicular traffic in Korea, as measured by highway transport usage, relief is being sought by expanding the construction of highways after 1970s'. These highways have opened up over 70 % of the mountainous areas in Korea's country side which includes the construction of tunnels. Currently there are 607 tunnels installed that are being maintained and by 2015, under the next medium-term plan, Korea will build an additional 440 tunnels. In addition, the use of 1,000m double-pole tunnels is expected to increase significantly in 256 locations. There is no doubt that these tunnels will relieve traffic congestion and aid improved communications, but halfclosed underground highway tunnels in particular are required to reduce tunnel fires caused by poor vehicle maintenance, and other factors such as speeding motorists that increase the number of vehicular accidents. Double-pole tunnels in 1,000m length over require vehicle drivers to be more cautious in terms of the continuous speed limit, judged by how devastating most of car-crash fires within these tunnels can be. In order to prevent these disasters, a full-length tunnel speed enforcement system should be considered mandatorily in legal clauses.

Development and Application of Landslide Analysis Technique Using Geological Structure (지질구조자료를 이용한 산사태 취약성 분석 기법 개발 및 적용 연구)

  • 이사로;최위찬;장범수
    • Spatial Information Research
    • /
    • v.10 no.2
    • /
    • pp.247-261
    • /
    • 2002
  • There are much damage of people and property because of heavy rain every year. Especially, there are problem to major facility such as dam, bridge, road, tunnel, and industrial complex in the ground stability. So the counter plan for landslide or ground failure must be necessary In the study, the technique of regional landslide susceptibility assessment near the Ulsan petrochemical complex and Kumgang railway bridge was developed and applied using GIS. For the assessment, the geological structures such as bedding and fault were surveyed and the geological structure, topographic, soil, forest, and land use spatial database were constructed using CIS. Using the spatial database, the factors that influence landslide occurrence, such as slope, aspect, curvature and type of topography, texture, material, drainage and effective thickness of soil, type, age, diameter and density of forest, and land use were calculated or extracted from the spatial database. For application of geological structure, the geological structure line and fault density were calculated. Landslide susceptibility was analyzed using the landslide-occurrence factors by probability method that is summation of landslide occurrence probability values per each factors range or type. The landslide susceptibility map can be used to assess ground stability to protect major facility.

  • PDF

A Study on the Excavation of Tunnel Portal Zone Located at High Steep Slope (급경사 지형에 위치하고 있는 갱구부의 굴착 방안 연구)

  • Kim, Woo-Sung;Lee, Sang-Eun
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.38-44
    • /
    • 2008
  • Recently, planning road construction in South Korea is focused on upgrading of the existing road by rerouting or restructuring. For this, roads under current construction in Korea go for more straight in its alignments and routing. Straight routing makes it all the more required to construct many mountain tunnels and bridges in Korea where mountains are so widely spread. Some portal of mountain tunnel is not rarely planed at high steep slope of mountain valley where it is not easy to secure working space for tunnel excavation. Reverse excavation is an alternative measure for excavation of tunnel portal at high steep slope. Construction in reverse excavation method has three important points requiring careful consideration: 1)planning of pilot tunnel in proper width, height, and length etc., 2)measure against the effect of one-side earth pressure to the direction of tunnel portal, 3)securing tunnel safety against shallow ground condition at portal zone. This paper intends to suggest applicable range of pilot tunnel for reverse excavation at the portal zone located at high steep slope, and shows result of study on the appropriateness of a reverse excavation by means of 3D numerical analysis. Result of 3D numerical analysis for reverse excavation at high steep slope shows that pilot tunneling will be applicable to start from the point $20{\sim}25m$ before the portal from inside the tunnel.

Nonlinear Three-dimensional Analysis of Piled Piers Considering Coupled Cap Rigidities (교량 말뚝기초의 캡강성을 고려한 비선형 3차원 해석)

  • Won Jin-Oh;Jeong Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.6
    • /
    • pp.19-30
    • /
    • 2005
  • A coupled three-dimensional pile group analysis method was developed by considering complex behavior of sub-structures (pile-soil-cap) which included soil nonlinearity and the behavior of super-structure (pier). As an intermediate analysis method between FBPier 3.0 and Group 0.0, it took advantages of each method. Among the components of a pile group, individual piles were modeled with stiffness matrices of pile heads and soils with nonlinear load-transfer curves (t-z, q-z and p-y curves). A pile cap was modeled with modified four-node flat shell elements and a pier with three-dimensional beam element, so that a unified analysis could be possible. A nonlinear analysis method was proposed in this study with a mixed incremental and iteration techniques. The proposed method for a pile group subjected to axial and lateral loads was compared with othe. analytical methods (i.e., Group 6.0 and FBPier 3.0). It was found that the proposed method could predict the complex behavior of a pile group well, even though piles were modelled simply in this study by using pile head stiffness matrices which were different from the method introduced in FBPier 3.0.

Aquatic Ecosystem Assessment and Habitat Improvement Alternative in Hongcheon River using Fish Community (어류군집을 이용한 홍천강의 수환경 평가 및 서식처 개선방안)

  • Kang, Hyeongsik;Hur, Jun Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5B
    • /
    • pp.331-343
    • /
    • 2012
  • In this study, the site investigation for fish was performed in the 15 km of Hongcheon river including Oancheon stream. The river ecosystem health was evaluated using the field data for fish. The field survey was carried out at 9 sites, 4 times from August to November 2011. The ecological diversity, including dominance, evenness, and richness and the ecological health using IBI and QHEI were evaluated. The result shows that the mean IBI in the 9 sites is in good-common condition, but the downtown section has a common-worse condition. The result evaluated by QHEI shows optimum-good condition. Also, the habitat suitability index for Pseudopuntungia tenuicorpa, which is one of endangered species, was evaluated, and then the environment flow was calculated by using the PHABSIM model. The previous research in the literature reports that Acheilognathus signifer, one of the endangered species, inhabited in Hongchen river. However, the existence of Acheilognathus signifer was not found in the recent research and this study. Thus, the physical habitat condition for Acheilognathus signifer was evaluated using the field data in the previous study. Also, the habitat improvement for Acheilognathus signifer in Hongcheon river was proposed.

Application of Total Station for Structure and Terrain Displacement Monitoring (구조물 및 지형변위 모니터링을 위한 토털스테이션의 활용)

  • Park, Joon-Kyu;Um, Dae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.4
    • /
    • pp.582-587
    • /
    • 2020
  • Recently, disasters caused by extreme weather and the damage caused by them are increasing worldwide. The interest in disasters, such as earthquakes, typhoons, and ground subsidence, is increasing in Korea. Korea has enacted a special law based on disaster management, and has built monitoring systems for individual facility units by building precision sensors and related systems to measure the displacement status of long bridges and high-rise composite buildings. On the other hand, the application of a real-time monitoring system is insufficient for slopes, open-pit mines, small and medium structures due to weather, measurement methods, cost, and constant monitoring difficulties. In this study, the displacement monitoring method using the total station was studied and the applicability was suggested through the experiment. Through the research, the concept and operation flow of a monitoring system that can measure the displacement of the terrain or the structure using the total station was presented. The monitoring system allows the user to select the location and operation method of the equipment so that the equipment can be installed according to the site situation, and set the number of observations, the period, and the observation range of the object. Using the experiment on the monitoring system, the station was monitored with precision within 5mm, and it was suggested that the displacement of the object can be monitored using the total station. Further research will be needed to assess the applicability of monitoring to real slopes and structures.