Analysis of the 'Problem Solving and Invention' Units of Technology and Home Economics 1 Textbook (기술.가정 1 교과서 '문제해결과 발명' 단원 분석)

  • Jung, Jin Woo
    • 대한공업교육학회지
    • /
    • v.38 no.1
    • /
    • pp.49-67
    • /
    • 2013
  • The purpose of this study is to analyze the external systems and the units 'problem solving and invention' of the middle school technology and home economics 1 textbooks of the revised 2011 national curriculum in an effort to provide some information on the content system of invention education in technology class, as invention education was provided as part of a regular subject for the first time. The findings of the study were as follows: First, 'Technology and Inventions' chapter of Technology and Home Economics 1 Textbooks occupied 10-18% share, with the subchapter of 'Problem Solving and Invention' unit taking up 6.7-29% of the textbooks. Second, for most textbooks, 'Technological Problem Solving', 'Idea Generation' 'Multi-dimensional Projection Method', 'Expansive Thought-Processing Methodology', 'Converging Thought Methodology' and 'Invention in Everyday Lives' were included as main contents based on the accomplishment criteria presented in education process interpretation documents. Third, the detailed structures were generally made up as follows: Introduction (Broad Chapter Title, Subchapter Table of Contents, Introduction, Subchapter Title, Study Objectives, Open Thinking); Development (Unit Title, Thinking Ahead, Core Terms, Main Text, Study Helper, Activities, Research Exercises, Supplemental Readings, In-depth Study Topics, Technology in Everyday Lives, Reading Topics, Discussion Topics, and Career Helpers); and Summary (Subchapter Summary, Study Summary, Terms Summary, Writing Follow-up, Self Review, Broad Chapter Evaluation). Fourth, based on the analysis of figures included, photographs had the largest share, followed by figures, tables, and graphs. The photos were used to illustrate various inventions, invention methodologies, and exercise activities, while figures were included to depict the contents included in the main text, and the tables to assist to preparation of process diagrams or materials lists. Fifth, based on the analysis of content weights, greater weights were placed on 'Inventions and Thoughts', and 'Invention Experiment Activities,' while 'Understanding Inventions' and 'Invention and Patents' chapters did not have a lot of texts involved. Sixth, based on the analysis of content presentation methods, most textbooks combined figures, tables, illustrations and texts to discuss the topics. Based on the above study results, we suggest the following: First, a consistent education curriculum should be developed over the topic of invention; and second, more precise and systematic analysis of textbooks would need to be performed.

A Study on the Delay Analysis Methodologies in Construction of Korea High Speed Railway (경부고속철도 건설사업의 공기지연분석에 관한 연구)

  • Yun Sung-Min;Lee Sang-Hyun;Chae Myung-Jin;Han Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.250-255
    • /
    • 2004
  • To analyze delay, Seoul - Daegu line of Korea High Speed Railway was divided into three sections and analyzed independently by the business characteristics. The analysis on the project delay reasons was performed on macro and micro scales. This analytic method was named as 'Macro-Micro Delay Analysis Method (MMDAM)'. The macro scale analysis has three approaches, which are (1) scheduling, (3) structural characteristic, (3) and responsibility of project administrative works. Micro analysis also has three, methodologies which are (1) As Planned Method, (2) As Built method, (3) Modified Time Impact Analysis for analyzing the most influential section which the largest delay occurred. Using elicited project delay reasons from above analysis, the questionnaire was carried out for analyzing the influence of project delay reason. The reasons of the delay were driven from two different aspects (1) structural characteristic and (2) responsibility of the people involved in the project. The reasons that were identified from aforementioned three sections are the factors of the delay of the large-scale government driven projects. Finally, the author suggested the methodology of identifying the project delaying factors. The author also analyzed delay reasons in both the overseas and domestic cases of high rapid railway construction and has elicited some benchmarks for the future projects.

  • PDF

THE ROLE OF A CROSS-BAR AND THE ENLARGEMENT OF A GNOMON IN JOSEON DYNASTY (조선시대 규표의 대형화와 횡량의 역할)

  • Mihn, Byeong-Hee;Lee, Ki-Won;Kim, Sang Hyuk;Lee, Yong Sam
    • Publications of The Korean Astronomical Society
    • /
    • v.28 no.3
    • /
    • pp.55-63
    • /
    • 2013
  • Gyupyo (圭表, Gnomon) consists of Gyu (圭, Measuring Scale) and Pyo (表, Column), and was one of the traditional astronomical instruments in East Asia. Daegyupyo (Large Gnomon) was manufactured in the Joseon dynasty around 1434 ~ 1435. To increase the measurement accuracy, it was equipped with a Hoengyang (橫梁, Cross-bar) and used a Youngbu (影符, Shadow-Definer) which was invented during the Yuan dynasty (1271 ~ 1368). The cross-bar was installed on the top of the column and this structure was called Eol. In addition, three plumbs hanging from the cross-bar was employed to vertically built Eol on the measuring scale. This method was also used to not only check the vertical of Eol but also diagnose the horizontal of the cross-bar. Throughout this study, we found that a cross-bar in a gnomon has played three important roles; measurement of the shadow length made by the central part of the Sun, increase of the measurement precision using the shadow-definer, and diagnosis of the vertical of Eol and the horizontal of the cross-bar itself using the three plumbs. Hence, it can be evaluated that the employment of a cross-bar and a shadow-definer in a gnomon was a high technology in the contemporary times. In conclusion, we think that this study is helpful for understanding the Large Gnomon of the Joseon dynasty.

Enhancement of Immune Activities of Kadsura Japonica Dunal. through Conventional Fermentation Process (오미자의 전통발효에 의한 면역활성 증진)

  • Kim, Cheol-Hee;Kwon, Min-Chul;Kim, Hyo-Sung;Ahn, Ju-Hee;Chio, Geun-Pyo;Choi, Young-Beom;Ko, Jung-Rim;Lee, Hyeon-Young
    • Korean Journal of Medicinal Crop Science
    • /
    • v.15 no.3
    • /
    • pp.162-169
    • /
    • 2007
  • Immune activities of two different extracts of Kadsura japonica Dunal. by typical extraction processes using water and ethanol at 60 $^{\circ}$C and 100 $^{\circ}$C were compared to them by ultrasofication system and through traditional fermemtation process. The fermented broth Kadsura japonica Dunal. definitely improved the growth of human B and T cell up to 30% and 22%, respectively, compared to the control. The secretion of TNF-${\alpha}$ and IL-60 was also enhanced by the addition of the fermented broth, up to 35%. NK cell activation was significantly improved up to 1.4 times higher than the case of adding other extracts. It was also found that this broth could yield higher nitric oxide production from macrophage than Lipopolysaccharides (LPS). It can be concluded that Kadsura japonica has immune activities and, in general, the culture broth from a conventional fermentation has higher immune activities, possibly by yielding immuno-modulatory compounds, not existed in typcial extraction systems as the result of HPLC analysis.

A study on the normal project duration development for the construction of multi-utility tunnel in the existing city (기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구)

  • Lee, Seong-Won;Lee, Pil-Yoon;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.677-685
    • /
    • 2018
  • In construction, schedule management is the basic but important step, for the effective schedule management, the preparation of the reasonable schedule table should be prioritized. In the design stage, the optimal construction period can be selected through comparison of various conditions and construction methods considering weather conditions and site characteristics. But, At the planning phase, it is difficult to select the effective method and calculate the proper construction period by the basic data(D/B) analysis. In this paper, the construction method considering characteristics of each type and conditions of existing city was selected. For the reasonable duration calculation, we analyzed the unit schedule for RC method for open type and Shield TBM method for tunnel type. The normal project duration of construction assuming of 1,200m of extension and every 200m of ventilation was prepared by integrating each unit schedule. It was analyzed that it took 893 days for the open type and 616 days for the tunnel type. The results of this study will help to make type selection and normal project duration more easily in the planning phase. If it is linked to the design stage, it will be easy to estimate the process and construction cost.

On-site Inventory Management Plan for Construction Materials Considering Activity Float Time and Size of a Stock Yard (공정별 여유시간과 야적장 규모를 고려한 건설자재의 현장 재고관리 방안 연구)

  • Kim, Yong Hwan;Yoon, Hyeong Seok;Lee, Jae Hee;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.79-89
    • /
    • 2023
  • The inventory of many materials requires a large storage space, and the longer the storage period, the higher the potential maintenance cost. When materials are stored on a construction site, there are also concerns about safety due to the reduction of room for movement and working. On the other hand, construction sites that do not store materials have insufficient inventory, making it difficult to respond to demands such as sudden design changes. Ordering materials is then subject to delays and extra costs. Although securing an appropriate amount of inventory is important, in many cases, material management on a construction site depends on the experience of the site manager, so a reasonable material inventory management plan that reflects the construction conditions of a site is required. This study proposes an economical material management method by reflecting variables such as the status of the preceding and following activities, site size, material delivery cost, timing of an order, and quantity of orders. To this end, we set the appropriate inventory amount while adjusting related activities in the activity network, using float time for each activity, the size of the yard, and the order quantity as the main variables, and applied a genetic algorithm to this process to suggest the optimal order timing and order quantity. The material delivery cost derived from the results is set as a fitness index and the efficiency of inventory management was verified through a case application.

Studies on the Selection of Microorganism for Food Wastes and Optimization of Fermentation Process (음식물찌꺼기 소멸효율 재고를 위한 발효균 및 발효 공정 최적화 연구)

  • Kim, Young-Kwon;Hong, Myung-Pyo;Kim, Myung-Jin;Hong, Suk-Il;Park, Myung-Suk;Kim, Jong-Suk;Chang, Ho-Geun
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.6 no.2
    • /
    • pp.95-112
    • /
    • 1998
  • For the effective disposal of organic food wastes, we seleted 4 strains of microorganism from 186 microbial candidate via enzyme activity test, salt tolerance, food decomposition rate, stability and safety of strains. The identity of these 4 strains are as follows : Fungi is Rhizopus sp., yeasts are Galactomyces sp., Pichia sp. and Hyphopichia sp., In the 50L fermenter scale, we tested various fermenting factor for the optimization of conditions of food waste decomposition using 4 selected strains. The optimum fomenting conditions were as follows : BIO-CHIP Volume 25-30 L, BIO CHIP size 2.0-6.0mm, air flow 200-280L/min, mixing intensity 2-4rpm, temperature $30-45^{\circ}C$. In these fermenting conditions, the efficiency of decomposition(rate of weight loss of food wastes) were 93%. Also the quality of fermenting output were assayed at the basis of fertilizer, and the results were as good as general compost.

  • PDF

A Study on the Performance Evaluation of the Welded Joint to Maintain the Quality of the Tandem GMAW (탠덤 GMAW의 품질확보를 위한 용접이음부위의 성능평가에 대한 연구)

  • Park, Cheol-Kyun;Lee, Jong Pyo;Park, Min Ho;Kim, Ill Soo
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.39 no.3
    • /
    • pp.230-237
    • /
    • 2015
  • To improve productivity and improve the welding process, we have studied the automated system of the weld by applying a tandem welding. Then, the speed of the welding process is improved, production of industries is increasing. Productivity of the industrial sector has increased the application of tandem welding for automated system of welding. But quality assurance for the product take place welding defects in the welding process because the speed of the process is increased. Definitive research solutions an dit's actuality, however, there is insufficient. Accordingly, it is a situation that the performance of the weld to ensure quality of the weld is required urgently after the welding process. Comparing and analyzing the results of passing each experiment of the two-electrode welding and the welding electrode1, a study attempted to quality assurance of the welded joint portion.

Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field (건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발)

  • Lee, Seung-Hak;Son, Jea-Ho;Lee, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.467-476
    • /
    • 2014
  • According to the expanding of construction machinery works, the number of civil complaints demanding compensations are increasing continuously from surrounding residents due to the noise from construction fields. However, the noise is usually managed restrictedly during the construction phase rather than prevented in advance. So, the efforts to solve the noise problem are occurring only after complaints have been made. Also, excessive cost and time consuming in order to solve the complaints negatively affects to construction companies. Therefore, the purpose of this study is to develop an optimized scheduling process model for controlling the noise in construction field by considering the planned time, cost, and the number of equipment before construction. In addition, this process model is expected to provide a useful information about the cost comparison between the original planned cost plus compensation and the optimized cost considering noise limitation so that the site managers can manage their projects effectively.

A Study on the Status of Occupational Environment and Health Examination Data of Aged Workers in Korea (고령취업자의 작업환경과 건강진단 결과에 관한 실태조사)

  • Paik, Jongmin
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.19 no.1
    • /
    • pp.63-72
    • /
    • 2009
  • 고령 근로자의 작업환경 실태와 건강검진 자료를 분석하여 그들의 건강한 생활과 삶의 질을 향상시킬 수 있는 정책의 기초자료를 마련하고자 시도되었다. 대상자는 부산, 경남지역에 소재하는 41개 사업장에서 유해인자에 노출되어 작업하는 공정에 있는 50세 이상 근로자 112명(남성 91명, 여성 21명)을 대상으로 소음, 분진, 유기용제, 중금속, 작업형태 및 작업강도 등을 측정, 분석하였으며, 건강검진 자료는 일반건강진단표를 이용하여 다음과 같은 결과를 얻었다. 1. 대상자의 평균연령은 54.9(남성 55세, 여성 54.7세) 세였으며, 평균근무기간은 8.7년이 였으며, 조사대상 사업장중 71.5%가 50인 이하의 근로자를 고용하고 있는 사업장이 였다. 2. 소음에 폭로 대상자 중 31.3%가 90dB(A)인 노출기준치을 초과하였으며, 그 외의 분진, 유기용제, 중금속 등의 노출기준치를 초과한 대상자는 없었다. 3. 조사대상자 중 9%는 청력이 비정상이였으며, 78.6%의 대상자는 경작업과 중등작업을 하였으며, 52.7%는 전신을 이용하여 작업하는 형태였다.