• Title/Summary/Keyword: 공용 중인 터널

Search Result 37, Processing Time 0.029 seconds

Field Test of Tunnel Lining Temperature Variation Using Insulation Material (단열재를 활용한 터널라이닝 온도변화 현장 실험)

  • Jin, Hyunwoo;Hwang, Youngcheol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.4
    • /
    • pp.11-16
    • /
    • 2019
  • The low temperature and temperature difference (variation) may cause to deteriorate the integrity of tunnel constructed in cold region. An insulation material was developed and applied to the tunnel lining surface to keep the temperature of tunnel lining constant in spite of temperature variation at outdoor. The lining surface where the insulation material applied showed the less sensitive to temperature variation than non-applied lining surface.

Analysis of temperature distribution per length in highway tunnel (공용중인 고속도로 터널내 연장별 온도 조사 분석)

  • Hong, Seung-Ho;Lee, Kyung-Ha;Kim, Nag-Young;Yun, Kyong-Ku
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.3
    • /
    • pp.259-267
    • /
    • 2005
  • This paper analyzed characteristic of temperature change as well as bottom of tunnel with thermometer according to tunnel length and region during one year. And it measured temperature distribution near tunnel portal. In the paper it was known that tunnel entrance and exit have different characteristic temperature distribution in accordiance with bottom of tunnel per tunnel length. Temperature of tunnel changed from tunnel exit to fifty meter and distribution of tunnel temperature was established uniform regardless of tunnel length. But temperature distribution of tunnel changed in tunnel entrance differ from tunnel exit in the location of one hundred twenty five meter and one hundred fifty meter. Cold air inflowed from tunnel entrance have influenced with the location of one hundred twenty five meter and one hundred fifty meter.

  • PDF

Deterioration Characteristic of Shotcrete Immersed in Chemical Solution (화학적 침식에 의한 숏크리트의 열화특성 분석 - 단기거동)

  • Lee, Gyu-Phil;Kim, Dong-Gyou;Bae, Gyu-Jin;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.2
    • /
    • pp.143-152
    • /
    • 2005
  • Shotcrete for support of tunnel structures may contact with groundwater. The hazardous components in groundwater may cause corrosion of shotcrete. Also, the hazardous components may deteriorate the engineering properties of shotcrete, such as compressive strength, bond strength, flexural strength and so forth. The more the effect of the hazardous components on the shotcrete may increase, the more the stability of tunnel structure may decrease. The specimens were artificially immersed in various chemical solutions including hazardous components after the specimens were made at the tunnel construction site. It was performed to analyze the effect of the hazardous components in ground water on the engineering properties of shotcrete. The uniaxial compressive strength test, XRD, SEM were conducted to evaluate the durability and corrosion of shotcrete.

  • PDF

Assessment of tunnel stability according to height of embankment by numerical analysis (수치해석을 통한 성토 높이에 따른 터널 안정성 평가 연구)

  • Lee, Kang-Hyun;Lee, Sangrae;Kim, Nag-Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.1
    • /
    • pp.37-45
    • /
    • 2021
  • The construction of the tunnel portal should be careful because cover depth is shallow and it is difficult to exhibit the arching effect. Tunnel stability may be reduced with additional embankment above the portal of tunnel. In this study, in order to examine the stability of the tunnel according to additional embankment above the portal of tunnel, numerical analysis was performed while changing the ground conditions and height of embankment. As a result of the numerical analysis, it was found that the allowable flexural compressive stress of shotcrete and allowable axial force of rockbolts were exceeded when the height of additional embankment was 12 m in rock mass rating V. When considering the displacement, the range of the plastic region and the behavior of the support materials, the tunnel stability seems to be greatly reduced if the height of additional embankment above the portal of tunnel exceeds 10 m.

A Case Study on Damage of The Tunnel Lining by Mine Waste Water (긴급제언 - 광산폐수에 의한 터널라이닝 손상사례 연구)

  • Lee, Yu-Seok;Oh, Young-Seok
    • Journal of the Korean Professional Engineers Association
    • /
    • v.45 no.4
    • /
    • pp.47-56
    • /
    • 2012
  • According to the policy of coal industry promotion, a lot of mines were abandoned. As the abandoned mines were neglected, environmental pollution such as settlement of ground, ground-water run-off, landscape damage etc were accompanied around abandoned mines. The government was promoting countermeasures of environmental contamination but most of the Countermeasures were aimed at protecting the ecological system not infrastructure. For this reason, abandoned mines impact on infrastructure has been relatively neglected. Most mines are located in mountainous so there is a tunnel among typical infrastructure around abandoned mines. In this paper, the effect of Mine drainage, Typical pollution source of abandoned mine, was introduced into the using tunnel focusing on the types and examples.

  • PDF

Analysis and cause of occurrence of lining cracks on NATM tunnel based on the precise inspection for safety and diagnosis - Part I (정밀안전진단 결과를 활용한 NATM터널(무근)의 라이닝 균열 종류별 발생원인 및 분석 - Part I)

  • Choo, Jin-Ho;Park, Sung-Woo;Kim, Hyung-Tak;Jee, Kee-Hwan;Yoon, Tae-Gook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.3
    • /
    • pp.199-214
    • /
    • 2011
  • A crack is the main cause to affect the integrity of tunnel lining as well as leakage, spalling, exposed rebar, corrosion, carbonation and so on. Since the 1980, NATM has prevailed on excavation method and geotechnical philosophy in tunnel. Although the pattern of cracks has been reported by several engineers' effort, it was only focused on longitudinal cracks of lining. Eleven operational NATM tunnels have been conducted with the precise inspection for safety and diagnosis by KISTEC (Korea Infrastructure Safety and Technology Incorporation). With those results, the crack patterns by the spatial distribution and appearance for each tunnel have been analyzed and the cause of occurrence for seven common types of cracks in NATM tunnels was classified. Additionally, the longitudinal crack on lining above duct slab was figured out by numerical simulation and field inspection. Each crack has been analyzed by CCD (Charge-Coupled Device) scanner image with 3D configuration. Each type of cracks is also explained with output of experimental and condition of construction. Defined cracks on NATM tunnels will be good example for periodical inspection and precise inspection for safety and diagnosis.

Analysis of cause and deterioration about using 3-Arch tunnel (공용중인 3-Arch터널의 열화조사 및 원인분석)

  • Lee, Yu-Seok;Park, Sung-Woo;Whang, In-Baek;Shin, Yong-Suk;Kim, Sun-Gon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.1
    • /
    • pp.97-105
    • /
    • 2009
  • This paper studied the cause of the deterioration of the four 3-Arch tunnels built in mid-1990. The common deteriorations of the four 3-Arch tunnels were longitudinal cracks, leakage and efflorescence at the same parts of lining concrete. Three fourths of 3-Arch tunnels, there was high percentage longitudinal cracks and a quarter was low frequency about longitudinal cracks. So the material reviewed to find out the differences between two groups in construction process and analysis was conducted such as non-destructive testing, precise visual survey and safety evaluation of one tunnel which had bad ground condition As the result, the tunnels were safety condition and the primary deterioration occurred during the construction process, namely, problems arrangement of rebar and the effects of the blast at middle tunnel.

A Study on the Proposal of Strength Presumption Equation of Concrete Using Rebound Test and Aging Effects of Underground Structures (지하구조물 공용년수를 고려한 반발경도법에 의한 강도추정식의 제안)

  • Na, Sung Oak;Yoon, Tae Gook;Rhee, Jong Woo
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.4
    • /
    • pp.59-65
    • /
    • 2009
  • The rebound test using Schmidt hammer is most popular method to estimate strength of concrete. However, this method is inappropriate for Seoul Metro underground structures due to unsuitable aging effects. Consequently, the strength presumption equation of underground structures is proposed according to the correlation of uniaxial compressive strength, rebound test results and age of concrete. To achieve this, the results of in-depth inspection of Seoul Metro underground structures performed annually for last 8 years was anlayed.

  • PDF

A Case Design of a Tunnel Passing Under an Adjacent Unlined Tunnel Designated As a Cultural property (문화재로 지정된 무라이닝 암반터널 하부통과 설계사례)

  • Kim, Seon-Hong;Jeong, Dong-Ho;Seok, Jin-Ho;Park, Myoung-Lyul
    • Tunnel and Underground Space
    • /
    • v.17 no.2 s.67
    • /
    • pp.152-164
    • /
    • 2007
  • Recently as increasing the amounts of cargoes and passengers, it is necessary to improving railway capacity and speed. So the constructions of improving the existing railway line have been advanced. Sometimes the new railway tunnel is built to adjacent the existing railway line. Furthermore the new tunnel might be built near the existing facility within the tunnel width. In this case, it should be analyzed the influence of existing tunnel and if it is necessary, it should be taken the appropriate counterplan. The major analysis contents are follows. One is the influence on the existing tunnel by a blasting and train vibration and the other is stability problem of the existing tunnel by excavation of new tunnel. Therefore, we peformed the following analysis. Refer to a domestic and foreign standard and paper, the permitting level of blasting vibration is decided and the excavation plan of the new tunnel are designed. The numerical analysis is performed about the stability of the existing tunnel and new tunnel. The influence of the train vibration on tunnel is analyzed by the empirical equation.