A Study of the Regulations for Calculation of Acceleration Costs on Construction Work (건설공사 공기단축으로 인한 추가비용의 산정규정에 관한 연구)

  • Min, Byeong-UK;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.409-417
    • /
    • 2017
  • The study is concerned with doing research on the plan to prevent the dispute occurring between contract parties regarding the additional cost generated when the construction period is shortened during construction work. After the review of the claim cases and the judgment cases of the court regarding the additional cost caused by the shortened construction period, the representative problem is the incomplete regulations on calculating the additional cost. In the 1st stage of the results of the research on the problem, the procedure handling the additional cost is presented, and the process of planning and approving the shortening of the construction period is gone through in the stage of the procedure to prevent the dispute on the additional cost between contract parties. In the 2nd stage, the plan on enacting and revising the regulations on removing the incomplete problems of the current regulations relating to the calculation of the additional cost. The basis for the advanced contract management is provided by resolving the incomplete problems of the current regulations relating to the shortening of the construction period with the prevention of a dispute and the resultant loss.

Development of System Model for Risk Management (건설공사 리스크관리를 위한 모형 개발 연구)

  • Park Seo-Young;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.418-421
    • /
    • 2003
  • Most construction companies recognize the necessity of risk management. The practical application, however, is not easy because of the absence of systematic procedure for risk management and the difficulty in objectification of subjective risk factors. This study suggests a systematic procedure and a models. In the first place for those researches, this study analyzes the present condition of risk management in the construction industry. The developed model can be used as a risk management tool that enables evaluation of construction risk factors by quantified method, and it provides project managers with the methods to prevent risk and to deal with potential risk factors in the planning and construction phases. The results of this study could be used as references for related researches because this study attempts to develop a systematic tool for risk management including risk identification, risk analysis. risk action phases.

  • PDF

A Study on the Improvement of Pfocedure Management in the Painting Works (전문건설업체의 업무관리절차 개선에 관한 연구 - 공사단계별 도장공사 참여를 중심으로 -)

  • 송천수;임상모;조형근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.153-156
    • /
    • 2003
  • Recently, as changing construction environment, we have come to need rational systematic and transparent in construction industry. In other to consider application possibility of CM in specialty construction, in this study improvement of procedure management by several construction phases in the coating with paint work.

  • PDF

A Fuzzy-based Risk Assessment using Uncertainty Model (불확실성 모델을 사용한 퍼지 위험도분석)

  • Choi Hyun-Ho;Seo Jong-Won;Jung Pyung-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.473-476
    • /
    • 2003
  • This paper presents a systematic risk assessment procedure with uncertainty modeling for general construction projects. Since the approach is able to effectively deal with all the related construction risks in terms of the assumed probability with conditional probability concept that systematically incorporate expert's experiences and subjective judgement, the proposed methods with uncertainty modeling is able to apply to all the construction projects inherent in lots of uncertain risk events. The fuzzy set theory is adopted to enhance risk assessment to effectively handle the vague and dynamic phenomenon of an event Therefore, the fuzzy-based risk assessment is very useful, for those countries, such as Korea, where objective probabilistic data for risk assessment is extremely rare, and thus the utilization of subjective judgmental data based on expert's experiences is inevitable.

  • PDF