Key Influence Factors for Efficient Cost Management of Design Stages (설계단계 공사비관리 효율성의 주요영향요인 분석)

  • Woo, Yu-Mi;Song, Jong-Kwan;Cho, Kyu-Man;Lee, Hyung-Jong;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.176-184
    • /
    • 2007
  • Recently, in the korean construction industry, the importance of cost management in the building design process has been grown up institutional systems and policies for the cost management of design stages are however weakness. Traditionally, the range of cost management has been limited to the construction stages, and due to inefficiency of the infrastructure such as standards and building cost data for cost management. It has trouble to perform the cost management in building design process. This study intends to derive key influence factors for raising efficiency of cost management. With questionnaire surveys to professionals, we analyze a current situations and the influence of obstacle factors on cost management. Finally, the key influence factors are induced, based on the result of the analysis on influence the obstacle factors.

A Study on the Estimation of Elemental Costs for an Apartment Building (공동주택에 대한 부위별 공사비 산정에 관한 연구 - 사례 H사의 실행단가를 중심으로 한 연구 -)

  • Kang, Hyun-Wook;Yoo, Jong-Hwan;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.173-181
    • /
    • 2007
  • The purpose of this study is to estimate elemental costs of an apartment building. The adapted research method includes a case study from $^{\circ}{\AE}H^{\circ}{\phi}$ construction company. The results of this study are as follows: 1) An elemental cost format of an apartment building is proposed, 2) An elemental cost table based on a case study of $^{\circ}{\AE}H^{\circ}{\phi}$ construction company is suggested.

A Study on the Estimation of Occupational Safety and Health Expense Rate by Safety Environment Change in Construction Industry (건설산업의 안전 환경 변화에 따른 산업안전보건 관리비 적정요율 산정에 관한 연구)

  • Oh, Se-Wook;Kim, Young-Suk;Choi, Seung-Ho;Choi, Jin-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.97-107
    • /
    • 2013
  • Occupational safety and health management expense in construction industry means the monetary amount that the purchaser appropriates to prevent various disaster from happening during the construction period by setting aside a certain amount from subcontract based on the construction type and scale. The current appropriation standard of the Ministry of Employment and Labor has been enforced since its stipulation in 1988 although various policy changes for the safety in construction industry, e.g. the development of occupational safety management techniques in construction industry, changes in construction field site environment, cost depreciation, etc., are happening in Korea and overseas. Therefore, it is required at this point to examine whether the current occupational safety and health management expense appropriation is proper or not on the basis of time trend and the changes in the construction industry environment. Accordingly, this study aims at investigating the appropriation of occupational safety and health management expense for construction industry by the construction type and target expense in response to current construction industry environment and proposing the proper appropriation. The above research result proposes the calibration of the appropriation as specified and stipulated by the Ministry of Employment and Labor by the construction type and target expense, which is necessary to reflect the actual condition of the current construction industry environment.

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF

A Study of Improvements in the Standards of Cost Estimate for the New Excellent Technology in Construction (건설 신기술의 원가산정기준 개선방안에 대한 연구)

  • Lee, Ju-hyun;Tae, Yong-Ho;Baek, Seung-Ho;Kim, Kyoungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.65-76
    • /
    • 2022
  • The New Excellent Technology (NET) designation system, introduced in 1989 for the purpose of promoting the development of domestic construction technology and enhancing national competitiveness, reviews the statement of construction cost of new technologies. And the cost reduction effect such as design, construction, and maintenance cost and the effect of reducing the construction duration are evaluated as an evaluation criteria of economic feasibility. However, in this evaluation process, differences of opinion between the institution of construction cost estimating standard management and the new technology developer about unique technologies frequently occur. In addition it is difficult to objectively compare the construction duration with existing similar technologies because there is no information on productivity as the current cost estimating standards for new technologies only present the required amount per unit quantity. In this study, the current state of cost estimating criteria review procedure, evaluation criteria, and cost estimating standards establishment method were analyzed when screening for the designation of a new construction technologies, and compared with overseas cost estimating standards, measures to improve the cost estimating standards of current construction new technologies were suggested. Through the improved cost estimating standards of this study, it is expected that cost information on new technologies will be provided to clients in more detail than the current ones, and the availability and applicability of new construction technologies would be improved by simplifying the construction cost calculation process more.

Cost Estimating in Early Stage Using Parametric Method for Apartment Construction Projects (파라메트릭 방법(Parametric Method)을 이용한 사업초기 단계의 공사비 예측 방법)

  • Seong, Ki-Hoon;Park, Mun-Seo;Lee, Hyun-Su;Ji, Sae-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.207-211
    • /
    • 2008
  • The importance of cost management in early stage has been increasing due to market change and competition severence in construction industry. Because the adjustable budget is only 20% after finishing design stage, the critical decision is made in the early stage. However, in the early stage, the design information is not enough to make crucial decision. Therefore, this research suggests the predicting method on the purpose of accurate cost estimation. The parametric estimation is appropriate for the early stage, especially it has the strength of rapidity in cost estimation. This research analyzes 84 actual data of public apartment on the scale of $11{\sim}15$ stories, and then performs the correlation analysis between cost and influence factors. After eliminating the parameters which causes the problem of multicollinearity, this research derived the formula through the multi-regression analysis.

  • PDF

Comparative Analysis of Conventional Tact and Compositive Tact in Apartment House Finishing Construction (공동주택 마감공사의 기존 Tact와 복합병행 Tact 비교분석 - 공동주택 미장공사 중심으로 -)

  • Hwang, SuHyeon;Sim, JeaHyung;Ham, NamHyuk;Kim, JaeJun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.47-56
    • /
    • 2022
  • In a construction project, process planning is an important factor in determining the success or failure of a project. In particular, it is necessary to systematically establish a process plan in the early stage because the finishing work of an apartment house involves more interference than the foundation work or the frame work. First, in this study the problems of Tact process management were identified, Based on the data from the case project, conventional Tact process management and compositive Tact process management were compared and analyzed. Second, cost analysis was performed on applicable plastering work to suggest the necessity and direction of compositive Tact process management. Third, the appropriateness of manpower according to the number of construction households is analyzed through cost analysis. Through this, the validity and effectiveness of compositive Tact process management were verified based on the results derived from this study.

A Trend Analysis of Small Type House Construction Cost in Multi-Family Housing (공동주택 소형평형 공사비 트렌트 분석)

  • Park, Wonyoung;Cha, Yongwoon;Park, Taeil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.261-262
    • /
    • 2021
  • Increasing construction costs are required due to increasing the supply of small type houses with changes in multi-family housing trends. However, a sharp rise in the construction cost of small type houses can raise the sale price, threatening the stability of national housing. Therefore, this study aims to estimate the change in the construction cost of small type houses from the basic construction cost of the sale price ceiling system and suggest an improvement plan.

  • PDF

Conceptual Cost Estimating System Development for Public Apartment Projects (공공아파트 프로젝트 기획단계 공사비 산정시스템 개발)

  • Lee, Hyun-Soo;Lee, Heung-Keun;Park, Moon-Seo;Kim, Soo-Young;Ahn, Jo-Seph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.152-163
    • /
    • 2012
  • At the conceptual phase of a construction project, estimated construction cost is very important as it significantly influences the owner's decision-making. Accurate cost estimating, in the early stage of a public construction project, serves as a critical factor because initial decision-making effects the final cost of a construction project. However in the cases of Korean public apartment projects, excluding a few of the public owners, there is a problem in properly estimating construction cost due to the lack of construction cost estimating system. Thus, this research developed a public apartment cost estimating system using case-based reasoning that was suggested by a previous research with 66 cases of Korean public apartment projects. Based on the system experiments involving 19 public officers and 10 cases of Korean public apartment projects, the effectiveness of the system in terms of estimation accuracy and user-friendly was confirmed. As a result, the developed system has an error range of 1.47% to 13.74% and mean of 6.15%. In addition, the system was evaluated that it could greatly improve the current estimation task of public officers. Consequently, the results of this research can be used as a foundation for a technological advance in estimating construction cost and improving the accuracy and consistency of construction cost estimation.

Standardization of Factors Classification Associated with Cost and Schedule Variations in Road Construction Projects (도로건설공사 공사비·공사기간 증감요인 분류체계 표준화 연구)

  • Mun, Junbu;Lee, Juhui;Baek, Seungwon;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.821-830
    • /
    • 2023
  • Various studies has tried to unveil causes of cost overrun and schedule delay in the road construction project. However, these causes need standardization due to difference by guidelines, relevant research, and facilities. Therefore, this study identifies and elaborate standard road construction cost and schedule variation factors that can be used in the planning and execution of the project. variation factors have been derived and grouped through literature review and modified and supplemented through expert interview. In addition, the connection with the relevant guidance factors is confirmed and the usability is reviewed by applying actual road construction cases. The factors suggested in this study comprehensively include factors of related guidelines and previous research, more clearly distinguish, support decision making.