• Title/Summary/Keyword: 공사단계

Search Result 1,097, Processing Time 0.028 seconds

Direction for Improving Cost Estimation and Management of Construction Projects : Comparing to Australian System (건설공사 공사비 예측 및 관리기술 발전방향 : 호주 사례를 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.170-181
    • /
    • 2008
  • Cost of construction project have to be estimated based on drawing before execution. Cost estimate and check would be performed numerously for preparing general outline of requirements and determining the budget at conceptual planning stage, for obtaining decision on every matter related to design, specification, construction and cost at design stage, and for predicting bidding cost. Thus, importance of cost estimation cannot emphasize too much in construction. However, there are lack of standard estimation method, process, and cost analysis method, that square foot estimation method is as used as eyer, in Korea. Thus, This research present the direction for improving cost estimation and management in construction; It is demanded that establishing standard data base methodology, multi-level database model CUBE, and standard cost planning process, choosing cost estimation methodology according to objectives and cost planning process, and making more experts.

Cost Prediction Model using Qualitative Variables focused on Planning Phase for Public Multi-Housing Projects (정성변수를 고려한 공공아파트 기획단계 공사비 예측모델)

  • Ji, Soung-Min;Hyun, Chang-Taek;Moon, Hyun-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.91-101
    • /
    • 2012
  • In planning phase of Public Multi-Housing Projects, it is required to develop the methodology and criteria for fair cost prediction with influencing power from planning phase to occupancy phase. Many studies still have focused on the prediction of cost by multiple regression. However, there is no logical explanation about the influence of nonmetric variables for the prediction of cost in planning phase. Accordingly, this research pursues a cost prediction model including nonmetric variables for use in planning phase. There are 3 steps of this research : 1) Finding the factors influencing construction cost and assigning variables for a multiple regression. 2) Conducting a dummy regression analysis with nonmetric variables and model validation by comparing actual cost data. 3) Developing the ratio of RC structure cost to wall structure cost by using cost predection model. The results could establish cost prediction process including the influence of nonmetric variables and the ratio of RC structure cost to wall structure cost.

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

Project Informations Classification System for Civil Works (토목공사용 정보분류 코드체계의 개발)

  • Lee, Bae Ho;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.4
    • /
    • pp.897-905
    • /
    • 1994
  • Project Informations Classification System (PICS) can be utilized as a springboard for advanced construction management techniques because it marries informations to networks and maintains a disciplined cost control. The present study attempts to develop a PICS which can be applied in construction management techniques. The frame work largely consists of the three parts such as: (i) development of the tentative Work Breakdown Structure with three divisions, facility calssifications, functional classifications and work classifications, covering the whole areas of civil works, (ii) development of the integrated informations system including the other informations in cost estimating and network scheduling, (iii) construction of relational database system for computer application. The system suggested in the study is found useful for the systematic and uniform management of construction works in the various stages.

  • PDF

Cost Estimating in Early Stage Using Parametric Method for Apartment Construction Projects (파라메트릭 방법(Parametric Method)을 이용한 사업초기 단계의 공사비 예측 방법)

  • Seong, Ki-Hoon;Park, Mun-Seo;Lee, Hyun-Su;Ji, Sae-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.207-211
    • /
    • 2008
  • The importance of cost management in early stage has been increasing due to market change and competition severence in construction industry. Because the adjustable budget is only 20% after finishing design stage, the critical decision is made in the early stage. However, in the early stage, the design information is not enough to make crucial decision. Therefore, this research suggests the predicting method on the purpose of accurate cost estimation. The parametric estimation is appropriate for the early stage, especially it has the strength of rapidity in cost estimation. This research analyzes 84 actual data of public apartment on the scale of $11{\sim}15$ stories, and then performs the correlation analysis between cost and influence factors. After eliminating the parameters which causes the problem of multicollinearity, this research derived the formula through the multi-regression analysis.

  • PDF

Quantity-based Early Cost Estimation Model for Road Construction Projects (대표물량 기반의 도로공사 설계단계의 개략공사비 예측모델)

  • Kim, Du Yon;Kim, Byungil;Yeo, Donghoon;Han, Seung Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.373-379
    • /
    • 2009
  • Cost estimation in the early phase enables government to plan public budgeting more efficiently by providing information about construction cost. However, cost estimation in the early phase is difficult to predict because only a little information can be utilized. The cost estimation method now being used by the government is calculated by length of the road multiplied by unit cost per length and shows high error rate because it cannot reflect the unique characteristics of each project. As the project is being proceeded, level of available information also changed. So, reflecting available information of a project is important. This paper divided early phase into two parts : planning phase and early design phase, and developed cost estimation model considering level of available information of each phase. Total 143 cases are utilized to find influencing variables and develop cost estimation model and model validation is done by adopting required accuracy level. This cost estimation model reflecting level of available information can be applied to public budgeting, feasibility test, and comparison between routes.

Analysis of Greenhouse Gas Emission Factor in Construction Project (건설공사의 온실가스 배출영향요인 분석)

  • Kim, Tae-Yeong;Park, Hee-Sung
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2013.05a
    • /
    • pp.433-434
    • /
    • 2013
  • 본 연구는 건설공사의 온실가스 배출영향요인을 건설공사의 생애주기(Life Cycle)별로 제시하였다. 이를 위해, 건설공사의 생애주기를 4단계로 구분하였으며, 각 단계의 온실가스 배출에 대한 자료조사와 선행연구 분석을 통해 영향요인을 도출하였다. 따라서 본 연구는 건설공사의 온실가스 배출량 산정을 위한 기초적인 자료로 활용이 기대된다.

  • PDF

A Study on Participation of Consultant in Curtain Wall Construction (커튼월 공사에서의 단계별 컨설턴트 참여방안 연구)

  • Yoon Hyung-Soo;Yi Dong-Seob;Koo Cho-Jin;Hyun Chang-Tack
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.618-621
    • /
    • 2003
  • The purpose of this study was to propose the participation of consultant pertinent to ground situations. The careful consideration of participating consultant reduces life cycle cost. duration and improves quality. The first step is studying Curtain-wall construction process by researching the documents, and Second step is analyzing Curtain-wall construction's problem through having a interview with a concerned experts (Architect, Gene-con, Sub-con. Consultant). Then we study how consultant solves the problem, propose the way of participation of consultant. The way of participation consist of three phases. the first one is to participate in design & construction process and the second one is to participate in design process, the third one is to participate in construction process. These participations are decided by evaluating project, design phase. construction phase. The verification of these participating strategies was implemented by the interview with the experts.

  • PDF

A study of a plan for better construction process of pre-construction phase in general contractor (종합건설회사내 Pre-construction 단계에서의 업무흐름개선에 관한연구)

  • Park Jang-Seob;Song Jong-Seok;Shin Soo-Am;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.481-484
    • /
    • 2003
  • Recently, the importance of Pre-construction is gradually increasing in construction business. In addition to increasing greatness, Pre-construction affect to success or failure of projects. However, current domestic construction business doesn't constitute exact concepts and systems, and there are a lot of problems such as disorganize management of construction because most of Pre-construction depends on supervisors' experiences. Therefore, according as doing this study, We are going to analyze the tendency of Pre-construction step and bring up designed operation systems between departments in construction company. So we can expect to develop efficiency by excluding unnecessary operation and formulating more improved operation process.

  • PDF

Improving Constructability for Partnering in Large Hospital Construction Projects (대형병원 프로젝트의 시공성 증대를 위한 파트너링 모델 구축)

  • Kim Sang-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.153-165
    • /
    • 2004
  • Most engineering tasks require collaboration between many users in major hospital construction projects that have many reconstructions. Loss and change orders occurred in factors such as information exchange, misunderstandings, advanced technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. The objective of this paper is to reduce reconstruction for the pre-construction process of hospital projects, reconstruction factors were analyzed in recent hospital construction project the system was established in order to solve reconstruction factors, and this system was validated through applying to the real project. Therefore it is a major challenge to make high level of communication and to have mutual understanding.