A Priority and Impact Factor Analysis of Construction Management Tasks for Decreasing Change Orders and Defect Repairs in Cancer Treatment Center Projects (암센터 의료시설의 설계변경과 하자보수의 감소를 위한 중점 관리공사 분석)

  • Lee, Chijoo;Lee, Ghang;Sim, Jaekyang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.55-64
    • /
    • 2013
  • The complexity of constructing medical institutions is higher than that of general buildings, and many change orders in the design and defect repairs in the construction phase are required due to strict government regulations. The priority control of constructions and impact factors of medical institutions were analyzed in this study, and difficulties in the control in the design and construction phase were identified. First, the priority management factors that were identified were as follows: architecture, facilities, and electricity. Second, 1) priority management in constructions and factors resulting in change orders and 2) priority management in constructions involving defect repair were analyzed. Third, the importance recognized by the construction managers were analyzed. The priority management in constructions and factors that were recognized by the construction manager were deducted as having low importance, although there were many change orders and defects. The work of finishing, wall building, joining, office automation and communication function, and lighting were analyzed in the design phase, and waste, the office automation and communication function, ceilings, contamination control, and plumbing were analyzed in the construction phase. The results showed that there will be a decrease in change orders and defects if the concentration of the manager was elevated and priorities were managed.

Cost prediction model of Public Multi-housing Projects in Schematic Design Phase (공공아파트 계획설계단계에서의 공사비 예측모델)

  • Kwon, Ho-Suk;Moon, Hyun-Seok;Lee, Sung-Kyun;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.65-74
    • /
    • 2008
  • Public institutions recognize the importance of cost management from the planning stage but they do not have an organized construction cost estimation and management system. Thus, at the stage of planning a new public construction project and estimating the cost, those in charge of budgeting estimate construction cost based on existing data and experiences, compare construction cost estimated after the basic design stage and the execution design stage with budgets, and then decide whether to continue the project or change the design according to the budgets. Therefore, we would develop the cost prediction model through regression analysis that can predict construction cost in Schematic Design Phase of the Public Multi-Family housing. Accordingly, if public institutions have a construction cost prediction model and management system that can estimate the optimum construction cost, they can make and execute budgets in a more efficient way than they do at present.

Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project - (건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 -)

  • Kim, Soo-Min;Cho, Jae-Ho;Lee, Jong-Sik;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.212-215
    • /
    • 2008
  • When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.

  • PDF

A Study on the Construction Management Method based on BIM for Civil Engineering Project (토목시설물에 대한 BIM기반 공사관리 기법 연구)

  • Kim, Sung-Hoon;Lee, Sang-Ho;Nam, Sang-Hyeok;Sun, Oh-Young
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.463-469
    • /
    • 2011
  • BIM(Building Information Modeling) technologies should be applied for the construction life cycle to maximize its efficiency, but the utilization for the construction phase has been significantly lower than that for the planning and design phase. Recently, some of BIM techniques such as 3D design review, 4D schedule management and so on are being introduced for efficient managing to the big national construction projects. In this study, the utilization plans of BIM are presented for the construction phase of civil engineering facilities. The methods of utilization of BIM are discussed for each type of construction, and the techniques applied to the Seoul Subway Lot No. 919 are analyzed for checking the applicability and usability. In particular, a web construction management system based on BIM can help field engineers, headquarters and contractors to use BIM more effectively, and it can be extended to maintenance phase for more efficiencies.

Cost Estimation Model Framework of Road Construction Project through Quantity of Standard Work (대표물량을 활용한 도로공사 개략공사비 산정모델 프레임워크)

  • Kwak, Soo-Nam;Kim, Du-Yon;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.607-612
    • /
    • 2007
  • Early cost estimation promote efficient budget plan by comparing alternatives and presenting cost information However it is hard to predict accurate cost because of vague cost standard and lack of available information in the early stage. The precious cost model has limitations in the accuracy because they are simple linear model which uses the unit cost per kilometer. This study presents the framework of early cost estimation for road construction projects to overcome the limitation of previous cost model. This study analyzed domestic and foreign cost model and cost data of previous road construction project to present method of cost model framework.

  • PDF

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

Construction management integrated system based on BIM (BIM 기반의 통합 공사관리 시스템)

  • Kim, Sung-Hoon;Sun, Oh-Young;Park, Young-Ho;Lee, Sang-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.243-246
    • /
    • 2011
  • 본 논문에서는 최근에 개발되어 지하철 919공구에 적용된 BIM 기반 통합 공사관리 시스템의 구축방법과 적용성에 대해 검토하였다. 최근 대형 국책사업이 발주, 시공되면서 효율적인 공사관리를 위한 PMIS 도입이 보다 활발해지고 있는 가운데, 기존의 텍스트와 그래프 위주에서 BIM(Building Information Modeling) 기법의 하나인 4D, 5D 시스템을 이용한 다양한 시도가 되고 있다. 한편, BIM은 건설 전 생애주기에 걸쳐 활용되어야 그 도입목적을 극대화할수 있으나, 현 단계에서는 계획 및 설계단계에만 초점이 맞춰져 있어 실제 공사중에는 그 활용도가 상당히 낮은 수준이었다. BIM 기반의 통합 공사관리 시스템은 공사중, 현장과 본사를 비롯해 발주처와 감리단 등 다수의 공사 주체들이 계획, 설계시 구축된 BIM을 보다 효과적으로 사용하도록 함으로써, BIM의 공사중 활용성을 높일 뿐 아니라 유지관리 단계까지 확장하여 이용될 수 있다. 본 논문에서는 BIM 기반 통합 공사관리 시스템을 구축하기 위한 절차를 살펴보고, 최종 구축된 통합시스템의 적용성 분석후 활용방안을 제시하였다.

  • PDF

Road Construction Cost Estimation Model in the Planning Phase Using Artificial Neural Network (인공신경망을 적용한 기획단계의 도로건설 공사비 예측 모델)

  • Han, Hyeong Dong;Kim, Jeong Hwan;Yoon, Jung Ho;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.829-837
    • /
    • 2011
  • Construction cost estimation in planning phase which calculates the cost for performing construction tasks is used for various ways. Meanwhile, in the case of road construction, the existing cost estimating method in early phase based on numerical mean value of the past is not accurate to be used. This paper propose neural network model for estimating road construction cost in planning phase to solve the limit of current cost estimating method. The model was designed using past road construction bidding records, and variables of model were optimized through trial and error. The estimation result of the model was compared with regression analysis and government's standard and it was verified that the model is better in accuracy. It is expected that the proposed model will be used for road cost estimation in planning phase.

Suggestion and Verification of Assessment model on Construction Cost of Steel Box Girder Bridge in Project Performance Phases (사업 수행 단계별 강박스거더교 공사비 산정 모델 제시 및 검증)

  • Jeon, Eun-Kyoung;Kyung, Kab-Soo;Park, Jin-Eun;Kang, Sin-Hwa
    • Journal of Korean Society of Steel Construction
    • /
    • v.22 no.1
    • /
    • pp.55-65
    • /
    • 2010
  • To effectively secure and execute the national budget, it is very important to estimate the reasonable construction cost of each process in the construction of public facilities and works. The construction cost is generally estimated at the time when the design of the targeted structures has been completed. Without detailed sectional drawings and with only simple information on bridge structures in the planning stage or in the early design stage. it would be very difficult to predict the approximate construction cost. In this study, a more efficient and appropriate approximate construction cost estimation model in the planning stage and in the early design stage is presented and verified as reliable by analyzing the construction cost data of 61 existing steel box girder bridges from previous studies. The results of this study show that when the construction cost that was predicted using the construction cost estimation model in the design stage was compared with the cost from the conventional standards, the suggested model in this study produced results with a very high confidence level.

Cost Prediction Models in the Early Stage of the Roadway Planning and Designbased on Limited Available Information (가용정보를 활용한 기획 및 설계초기 단계의 도로 공사비 예측모델)

  • Kwak, Soo-Nam;Kim, Du-Yon;Kim, Byoung-Il;Choi, Seok-Jin;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.87-100
    • /
    • 2009
  • The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various researches have been attempted to develop cost prediction models in the early stage of a construction project. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the Case-Based Reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.