• Title/Summary/Keyword: 공사관리시스템

Search Result 936, Processing Time 0.023 seconds

A Development of Computerized Management System for Construction and Demolition Waste (건설해체공사의 폐기물 통합관리 시스템의 개발)

  • Kim, Chang Hak;Kim, Hyo Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.627-634
    • /
    • 2006
  • Now, in a domestic country, the rebuilding and redevelopment of existing houses has been rapidly increasing with an economic growth and the improvement of living condition. As a result of that, a lot of C&D waste has been also produced. Nevertheless, it is not easy to find the research results for appropriate treatment and management of C&D waste in domestic. Therefore this study suggests the optimum deconstruction management system for minimizing construction waste and increasing reuse or recycle rate of material different from traditional demolition. The system makes it possible to plan and manage in advance quantity of C&D waste, demolition methods of each structural elements and application methods of produced C&D waste through an integrated and computerized system. The purpose of the system is ultimately to contribute to minimizing environmental damages and reducing construction waste quantity of a country. This system is largely composed of four modules such as planning of preliminary demolition survey, estimating of demolition quantity, planning of demolition schedule and planning of construction waste management and each module can be also used individually according to the purpose of a user.

시선집중, 선진안전사업장 - 근로자가의 안전보건 확보가 경영의 최우선 가치, 한국토지주택공사

  • Kim, Hyo-Seon
    • The Safety technology
    • /
    • no.185
    • /
    • pp.19-21
    • /
    • 2013
  • 경기도 성남시 분당구에 위치한 한국토지주택공사는 지난 2009년 10월 대한주택공사와 한국토지공사가 통합하고, 국가가 자본금 전액을 출자해 출범한 공기업이다. 한국주택공사는 전국의 300여 개의 사업장에서 주택 공급, 신도시 개발 등 국민들의 주거생활 향상과 국토 이용의 효율성을 높이기 위한 다양한 활동에 나서고 있다. 특히 주택 공급 분양과 관련해서는 보금자리 주택 건축 사업을 담당하면서 국민주거 수준을 높이는 역할을 톡톡히 수행하고 있다. 이를 구체적으로 살펴보면 한국토지주택공사는 2018년까지 150만호의 보금자리 주택을 공급한다는 목표를 세워 실천해 나가고 있다. 또 신도시 개발 분야에서는 세종시를 비롯해 부산, 대구 등의 혁신도시 개발 업무를 맡고 있기도 하다. 이처럼 국민주거 수준을 높이고 도시에 숨결을 불어넣는 막중한 업무를 진행함에 있어 근로자의 안전 보건은 경영의 최우선 가치로 여겨지고 있다. 여기에 더해 전국 본사와 33개 지역본부, 사업본부 및 사업단과 7천여 명의 임직원으로 구성된 거대한 조직이라는 점에서 이곳이 안전관리는 전국 안전인들의 남다른 관심을 받고 있다. 아울러 최근 전 직원의 안전보건 관련사항을 체계적으로 관리할 수 있는 안전보건시스템 개발이 한창 진행 중에 있어 더욱 뜨거운 화제가 되고 있다. 근로자의 안전보건을 밑바탕으로 국토 관리의 중추적인 역할을 담당하고 있는 한국토지주택공사를 찾아가 봤다.

  • PDF

Case Study of 4D CAD Modeling in Hi-Rise Complex Buildings Project (초고층 복합시설물의 4D CAD 모델링 사례연구)

  • Kwan Oh-Sung;Park Woo-Yul;Cho Hun-Hee;Kang Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.187-192
    • /
    • 2001
  • High-Rise Building Construction Project which has high uncertainty and complexity, causes lots of problems under construction. In particular, the integration between design phase and construction phase highly affects a construction project in terms of cost and time. To possibly make the flexible response and preliminary verification against the construction planning problems in high rise building project, this paper proposes the Engineering-Construction Management System based on 4D CAD that put the time factor together with 3D CAD. The usefulness of this system has been verified through the actual project. It could helps the reducing trials and errors during construction phase by catching the factors on problems of project. Ultimately it will allow users to save project cost and duration by field application.

  • PDF

Assessment of predictability and Bias correction of Global seasonal forecasting system version 5 (GloSea5) for water resources planning and management (수자원 계획 및 관리를 위한 GloSea5모델의 예측력 평가 및 편의보정)

  • Son, Chanyoung;Jeong, Yerim;Han, Soohee;Cho, Younghyun;Suh, Aesook
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.241-241
    • /
    • 2017
  • 기후변화로 인하여 강우의 불확실성이 가중되고 홍수, 가뭄 등 물 관련 재해의 발생빈도 및 강도가 증가함에 따라 안정적인 용수공급 등 수자원 관리 및 운영에 어려움을 겪고 있어 예측기반의 수자원 계획 및 운영이 요구되고 있는 실정이다. 우리나라 기상청에서는 2010년 6월 영국기상청과 장기 계절예측시스템의 구축 및 운영에 관한 협정을 체결하였으며 2014년부터 전지구 계절예측시스템 GloSea5(Global seasonal forecasting system version 5)을 현업에 활용하고 있다. GloSea5 모델은 대기(UM), 지면(JULES), 해양(NEMO), 해빙(CICE) 모델이 커플러(OASIS)에 의해 결합된 통합 시스템으로 일단위 자료로 제공된다. 현재 수자원 분야에서는 장기예보자료가 제공되고 있음에도 불구하고 장기예보자료의 불확실성 및 수문 모형 입력자료로의 활용 어려움, 예측자료의 검증 미흡 등으로 기상청에서 제공하는 장기예보를 참고할 뿐 실제로는 과거 관측자료를 기반한 빈도해석 결과를 활용하여 댐 운영 계획을 수립하고 있는 실정이다. 따라서, 본 연구에서는 GloSea5모델에서 제공되는 일 단위 예측 강수량을 수자원 장기이수계획 및 관리에 활용하고자 GloSea5모델의 예측력을 평가하고 수치모델이 가지는 시스템 에러에 대하여 편의보정 및 지점 상세화를 수행하였다. 본 연구의 분석결과는 향후, 저수지 운영계획 및 증가하는 물수요와 불확실한 공급에 대한 의사결정 지원, 가뭄 대비를 위한 물 공급 제한 등에 활용 가능할 것으로 판단된다.

  • PDF

원전 지하 Box Culvert의 효율적 관리를 위한 자동화 설계시스템 개발

  • 송영철;조명석;방기성;우상균
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1998.05b
    • /
    • pp.891-896
    • /
    • 1998
  • 최근 도시의 기능이 날로 다양화되고 복잡해짐에 따라 지하공간에 대한 활용도가 대단히 높아지고 있으며, 한국전력공사에서도 원자력 발전소에 많은 전력구조물을 지하에 건설하고 있다. 이러한 지하구조물을 보다 효율적이고 신속하게 유지관리하기 위해서는 지하 구조물의 구조설계 및 도면제작을 자동으로 수행할 수 있는 시스템의 개발이 필수적이다. 이에 따라 한국전력공사 전력 연구원에서는 기존의 설계도면 및 정보에 쉽게 접근할 수 있으며, 구조설계에서부터 도면제작에 이르는 과정을 일괄 처리할 수 있는 “Box 구조물 자동화 설계 시스템”을 개발하여 실무에 적용하고 있다. 본 시스템의 개발은 지하구조물의 계획, 설계, 시공조건 등의 변경에 신속하게 대처할 수 있으므로 설계업무의 효율성을 극대화함은 물론 생산성의 향상, 품질의 고급화 및 설계자료 유지관리의 선진화에 크게 기여할 것으로 사료된다.

  • PDF

Cost prediction model of Public Multi-housing Projects in Schematic Design Phase (공공아파트 계획설계단계에서의 공사비 예측모델)

  • Kwon, Ho-Suk;Moon, Hyun-Seok;Lee, Sung-Kyun;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.65-74
    • /
    • 2008
  • Public institutions recognize the importance of cost management from the planning stage but they do not have an organized construction cost estimation and management system. Thus, at the stage of planning a new public construction project and estimating the cost, those in charge of budgeting estimate construction cost based on existing data and experiences, compare construction cost estimated after the basic design stage and the execution design stage with budgets, and then decide whether to continue the project or change the design according to the budgets. Therefore, we would develop the cost prediction model through regression analysis that can predict construction cost in Schematic Design Phase of the Public Multi-Family housing. Accordingly, if public institutions have a construction cost prediction model and management system that can estimate the optimum construction cost, they can make and execute budgets in a more efficient way than they do at present.

A Framework on 3D Object-Based Construction Information Management System for Work Productivity Analysis for Reinforced Concrete Work (철근콘크리트 공사의 작업 생산성 분석을 위한 3차원 객체 활용 정보관리 시스템 구축방안)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.15-24
    • /
    • 2018
  • Despite the recognition of the need for productivity information and its importance, the feedback of productivity information is not well-established in the construction industry. Effective use of productivity information is required to improve the reliability of construction planning. However, in many cases, on-site productivity information is hardly management effectively, but rather it relies on the experience and/or intuition of project participants. Based on the literature review and expert interviews, the authors recognized that one of the possible solutions is to develop a systematic approach in dealing with productivity information of the construction job-sites. It is required that the new system should not be burdensome to users, purpose-oriented information management, easy-to follow information structure, real-time information feedback, and productivity-related factor recognition. Based on the preliminary investigations, this study proposed a framework for a novel system that facilitate the effective management of construction productivity information. This system has utilized Sketchup software which has good user accessibility by minimizing additional data input and related workload. The proposed system has been designed to input, process, and output the pertinent information through a four-stage process: preparation, input, processing, and output. The inputted construction information is classified into Task Breakdown Structure (TBS) and Material Breakdown Structure (MBS), which are constructed by referring to the contents of the standard specification of building construction, and converted into productivity information. In addition, the converted information is also graphically visualized on the screen, allowing the users to use the productivity information from the job-site. The productivity information management system proposed in this study has been pilot-tested in terms of practical applicability and information availability in the real construction project. Very positive results have been obtained from the usability and the applicability of the system and benefits are expected from the validity test of the system. If the proposed system is used in the planning stage in the construction, the productivity information and the continuous information is accumulated, the expected effectiveness of this study would be conceivably further enhanced.

Development of Wireless Communication System and Application Program for Realtime Schedule Management at Construction Site (건설현장 실시간 공정관리를 위한 무선통신시스템 구축 및 응용프로그램 개발)

  • 진교홍;이혜원;김지홍
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.1
    • /
    • pp.192-199
    • /
    • 2004
  • As the construction site becomes larger, more complex and more special, the information of construction is expanded in quantity and specialized in quality. Therefore the computing system is necessary to effectively manage the construction schedule management. At present, main office at construction site bring in the computing system to perform the schedule management, so the data input and access for schedule management is performed by engineer on foot between construction site and main office. Therefore in this paper, we arrange wireless communication system between construction site and main of office and develop application program for data input and access of schedule management immediately using PDA at construction site. Through the our system we can improve the schedule management at construction site, and we can look forward to reduction of manpower, equipments, time, and money in whole construction.

소통+섬기는 마음 - 우리 사업장 탐방 - 새롭게 증축된 한국건강관리협회 서울서부지부 개인맞춤형 검진시스템과 함께 고객 앞으로!

  • Kim, Eun-Seop
    • 건강소식
    • /
    • v.35 no.1
    • /
    • pp.40-41
    • /
    • 2011
  • 한국건강관리협회 서울서부지부가 지난해 11월, 장장 6개월 동안의 증축공사기간을 거쳐 한층 달라진 위용을 일반에 공개했다. 가장 큰 특징은 내부구조변경을 통한 건강검진시스템의 개선과 고객의 입장을 배려한 동선배치로 고객만족을 실현한 것이다.

  • PDF