• Title/Summary/Keyword: 공사계측비

Search Result 62, Processing Time 0.026 seconds

Evaluation for Fundamental Periods of Domestic Rockfill Dams with Micro-earthquake Records (미소지진 계측기록을 활용한 국내 사력댐 고유주기 산정방법)

  • Ha, Iksoo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.6
    • /
    • pp.53-60
    • /
    • 2011
  • The purpose of this study is to propose a method that can reliably evaluate the fundamental period of a rockfill dam using the micro-earthquake records, which were obtained at the domestic dam sites. For total 20 micro-earthquake records obtained at 7 domestic rockfill dam sites against 6 earthquake events which recently occurred, the fundamental periods of seven rockfill dams were evaluated by two kinds of methods; one is a method using acceleration amplification ratio and the other is a method using acceleration response spectrum ratio. Applicability of each method to evaluation of fundamental periods of domestic rockfill dams was examined. In the moderate seismicity region like our country, the method using acceleration response spectrum ratio, which could evaluate the fundamental period of the rockfill dam using the ratio between the response spectrum for acceleration observed at the dam crest and that observed at the dam base or abutment, proved to be reliable and was proposed in this study. From the results of analyses, it was found that the proposed method could consistently evaluate the fundamental period of the rockfill dam and the results obtained by the proposed method were very similar to the results by the existing method which was proposed from the analysis for the earthquake records observed at Japanese dam sites.

A Vibration Evaluation and Improvement Scheme for Open Test Blasting (노천시험발파의 진동평가와 개선방안)

  • Kim, Eung-Rok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.310-315
    • /
    • 2017
  • Although studies evaluating the effects of the blasting vibration on the adjacent structures from various angles have continued, cases of securing the safety of the adjacent buildings and researching the proper blasting method for the field condition by analyzing the vibration waveform of the measuring field while performing the open pit blasting are poor. Therefore, it is necessary to present a remedy for blasting pattern selection through test blasting that is appropriate for field conditions, and is economical and efficient. In this study, open pit blasting work was conducted based on the separation distance applied according to the standard blasting method by test blasting and the vibration regulation standard in the road expansion construction site to measure the blasting vibration value, and the vibration prediction equation by blasting methods was examined using a regression analysis computer program to calculate K, N, and R of the confidence level 95%. By setting the blasting allowed vibration standard of the test blasting target area to 0.3cm/sec, and the charring weight and blasting method by the separation distances according to the blasting vibration estimation equation of the open pit blasting guideline and the blasting vibration estimation equation of the test blasting were compared/analyzed, it was possible to identify the factors that increased the working expenses. In addition, the measurement and analysis of the adjacent structures during open pit blasting and the blasting vibration were performed after selecting the most adjacent structure to the open pit blasting spot to analyze the problems on the test blasting procedure and analysis method in the open pit blasting design/construction guidelines, which appeared in the process of completing open pit blasting construction, and a remedy is presented.

Application of Electronic Deck Charge Blasting Method to a Vertical Shaft Excavation (수직구 굴착시 전자뇌관을 이용한 Deck-Charge 발파 시공사례)

  • Kim, Jae-Hong;Kim, Hee-Do;Lee, Jun-Won;Kim, Gab-Soo;Son, Young-Bok;Kim, Jae-Hoon
    • Explosives and Blasting
    • /
    • v.31 no.1
    • /
    • pp.64-75
    • /
    • 2013
  • This case study deals with an excavation blasting carried out at "Sooseo-Pyeongtek ${\bigcirc}$-${\bigcirc}$ section construction site" in the vicinity of residential area. Originally, the sequential blasting (multi-stage blasting) using electric detonators was planed in this area. However, there was a concern that the sequential blasting method could increase the construction cost by delaying the construction period due to possible complaints from local residents. As an alternative, electronic deck blasting technique was taken in order to meet the ground vibration regulation (0.2cm/s, in apartment area) and to keep the construction schedule. The performance of the electronic deck charge blasting was two times better than the sequential blasting with electric detonators and the level of ground vibration was also within the regulatory value (0.2cm/s). In particular, it was shown that the use of electronic detonater eDevII, which was developed for tunnel, could provide more convenient and electrically safer working condition.

Nonstationary Surrogate Model for Reference Evapotranspiration Estimation Based on In-situ Temperature Data (온도인자를 활용한 비정상성 기준증발산량 대체모형 개발)

  • Kim, Ho-Jun;Nguyen, Thi Huong;Kang, Dongwon;Kwon, Hyun-Han
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.96-96
    • /
    • 2021
  • 수문기상인자 중 하나인 증발산량은 수자원 계획 및 관리 시 고려되며, 특히 물수지 모형 등의 입력자료로 활용된다. 우리나라를 포함한 각국 기상청 및 국제기구에서는 직접 관측이 아닌 FAO56 Penman-Monteith(PM)을 통해 증발산량을 산출하고 있다. FAO56 PM 방법은 복사(radiation), 대기온도(air temperature), 습도(humidity), 풍속(wind speed) 등의 기상인자로부터 기준증발산량(reference evapotransipiration)을 추정하며, 상대적으로 높은 정확성을 보여준다. 그러나 FAO56 PM 방법은 많은 기상인자를 요구하므로 미계측 유역을 포함한 일부지역에 대한 증발산량 자료 구축이 어려운 실정이다. 또한, 기준증발산량의 특성이 시간에 따라 변화하므로 비정상성(nonstationary)을 고려한 분석이 요구된다. 본 연구에서는 온도인자 기반의 대체모형(surrogate model)을 개발하여 기준증발산량의 비정상성을 고려하고자 한다. 한강유역에 위치한 관측소를 대상으로 모형을 개발하였으며, 시간에 따라 변동하는 기준증발산량의 특성을 고려하기 위해 Bayesian 추론기법을 통해 매개변수를 시간에 따라 추정하였다. 또한, 본 연구에서는 대체모형으로 산정된 증발산량을 활용해 가뭄지수인 EDDI(evaporative demand drought index)를 제시하였다. 가뭄 모니터링 및 조기 경보 안내를 위해 개발된 EDDI를 활용하여 기존 가뭄보다 빠르게 진행되는 초단기 가뭄(flash drought)를 평가하였다. 본 연구에서 개발된 모형은 미계측 지역에서도 적용이 가능하므로 수자원분야에서 활용성이 높을 것으로 사료된다.

  • PDF

A Study on Efficient Deconstruction of Supporters with Response Ratio (응답비를 고려한 효율적인 버팀보 해체방안에 관한연구)

  • Choi, Jung-Youl;Park, Sang-Wook;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.5
    • /
    • pp.469-475
    • /
    • 2022
  • As the recent structure construction is constructed as a large-scale and deep underground excavation in close proximity to the building, the installation of retaining wall and supporters (Struts) has become complicated, and the number of supporters to avoid interference of the structural slab has increased. This construction process becomes a factor that causes an increase in construction joints of a structure, leakage and an increase in wall cracks. In addition, this reduced the durability and workability of the structure and led to an increase in the construction period. This study planned to dismantle the two struts simultaneously as a plan to reduce the construction joints, and corrected the earth pressure by assuming the reaction force value by the initial earth pressure and the measured data as the response ratio. After recalculating the corrected earth pressure through the iterative trial method, it was verified by numerical analysis that simultaneous disassembly of the two struts was possible. As a result of numerical analysis applying the final corrected earth pressure, the measured value for the design reaction force was found to be up to 197%. It was analyzed that this was due to the effect of grouting on the ground and some underestimation of the ground characteristics during design. Based on the result of calculating the corrected earth pressure in consideration of the response ratio performed in this study, it was proved analytically that the improvement of the brace dismantling process is possible. In addition, it was considered that the overall construction period could be shortened by reducing cracks due to leakage and improving workability by reducing construction joints. However, to apply the proposed method of this study, it is judged that sufficient estimations are necessary as there are differences in ground conditions, temporary facilities, and reinforcement methods for each site.

Research on Agricultural Automated Water Management Project with 4th industrial Technology (4차산업기술이 적용된 농업용수관리자동화사업 연구)

  • Yang, Yong Seok;KANG, Seung Mook;KIM, Kyoung Soo;PARK, Jong Hun;LEE, Joo Yong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.344-344
    • /
    • 2020
  • 기후변화 가속화와 국민의 높아진 서비스 요구 수준에 따라 농업용수의 관리방식을 현장인력의 경험적 물관리 방식에서 계측정보 기반의 과락적 물관리 방식으로 전환의 필요성이 대두되어, 2001년부터 농업기반시설 내 무인계측, 원격제어 기능이 탑재된 물관리자동화 시스템을 보급하는 농업용수관리자동화사업을 시행하였다. 농업용수관리자동화사업은 사업시행 초기 연구 결과, 농업기반시설 무인계측 및 원격제어 시스템 보급으로 인력에 의한 관행적 물관리 대비 수리시설의 관리 효율성이 크게 향상되어 유지관리 인력의 절감 및 용수수급의 적정성이 개선될 것으로 분석되었다. 하지만 영농환경의 변화에 따라, 당초 분석결과와 달리 자동화사업 추진과 한국농어촌공사의 유지관리 인력 규모 간 뚜렷한 상관성이 보이지 않는다는 정책기관의 지적이 발생하고 있다. 현재 4차산업기술이 산업 전 분야에 걸쳐 일어나고 있으며 농업분야에도 ICT, LOT, 빅데이터 기술이 도입되어 새로운 가치를 창출하고 있다. 농업용수관리 분야에 있어서는 데이터를 활요한 수요자 중심의 지능형 물관리 사업이 추진되고 있으며, 일정규모 이상 저수지 및 양수장 농업용수 공급량 측정 계측기의 설치가 추진중에 있다. 그러나 현재까지 이러한 설치된 계측장치들의 활용방안에 대해서는 뚜렷한 결과가 도축된 바 없으며, 현재 많은 예산과 인력이 투입되어 설치·운영되고 있는 계측장치들의 활용 방안에 대해서 연구가 필요한 실정이다. 2018년 2,228개 농업기반시설물에 자동화시스템을 설치 완료 하였으나, 각종 장비의 비표준화, 효과대비 고비용, 잦은 통신두절 등의 기술적 문제로 인해 현업부서의 수자원관리 업무에서 자동화시스템의 활용성이 저조한 것으로 관측됐다. 본연구에서는 국내 수자원 계측제어 기술 동향 및 운영환경 조사 결과를 기초로, 기술적 측면의 농업용수관리자동화사업의 개선사항과 4차 산업기술의 농업용수관리자동화사업의 적용방안을 제시 하여 농업용수관리자동화사업 중장기 계획 개정등 향후 정챡수립시 참고 자료로의 활용과 농업용수 효율적 활용과 관리를 위한 TM/TC 미래추진 방안을 제시로 정확하고 신뢰도 높은 농업용수 관리 체계를 구축 하고자 한다.

  • PDF

NATM Tunnel Designs in Taiwan High Speed Rail Project (대만 고속전철에 적용한 NATM 터널설계)

  • Kim, Dal-Sun
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.424-430
    • /
    • 2001
  • 현대건설(주)는 사업 주관사로서 해외 업체와 대만고속전철 턴키 공사를 2000 년 1 월에 공동으로 수주하였다. 고속전철의 총 연장 길이는 약 326 km 이며, 정거장 10 개소, Depot 및 야적장으로 구성되어 있다. 이번에 수주한 공구는 2 개의 연속된 공구 (C230, C240) 이며, 본 논문은 총 연장 23.6km 인 C230 공구에 대한 설계 과정을 수록하였다. C230 공구는 NATM 터널 (6.2km), Cut-and-Cover 터널 (0.5km), 교량 (7.8km) 및 토공 구간 (9.1km)으로 구성되어 있다. 전 구간의 지반조건은 "매우" 취약한 매질로 구성되어 있으며, 층리나 절리는 거의 발달되어 있지 않다. 따라서 화약발파에 의한 터널 굴착은 기계식 굴착 (Back-hoe Excavation) 방법에 비하여 현실성이 없는 것으로 분석되었다. 취약한 지반에서 계측 결과를 기준으로 굴착 공간을 안전하게 유지할 수 있는 NATM 보강 설계가 현지 암반조건에 가장 이상적인 방법으로 제시되었다. 특히, NAT설계는 대형 아파트 지역과 파쇄대 및 지하수 침투 예상지역을 통과하기 위하여 계측에 의한 Feed-back 과정을 탄력적으로 적용하도록 계획하였다.

  • PDF

Quality Control Plan of Water Level in Agricultural Reservoirs using a Deep-Learning Based LSTM Model (딥러닝 기반 LSTM 모형을 이용한 농업용 저수지 수위자료 품질관리 방안)

  • Yang, Mi-Hye;Nam, Won-Ho;Shin, An-Kook;Kang, Mun-Sung;Kim, Taegon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.128-128
    • /
    • 2020
  • 최근 농업환경의 변화와 기후변화에 대응하기 위해 농업용수 관리 정보화 및 과학화의 필요성이 증대되어 실시간으로 저수지 저수량과 농업용수 공급량을 파악하기 위해 자동 수위계측시설이 도입되었다. 농림축산식품부의 저수지 자동수위측정기 설치 및 운영지침에 따라 현재 농어촌공사 관리 저수지 1,734개소 및 수로부 1,880개소에 자동수위계가 설치되어 있으며, 저수지와 수로에서 10분 간격으로 수위자료가 생성되고 있다. 농업용 저수지 수문자료의 공인지점은 2016년 6개소에서 2019년 49개소로 증대되고 있으며, 데이터 품질 저하의 최소화 및 신뢰성 있는 수문자료 생성의 필요성이 증가함에 따라 농업용 저수지의 특성을 반영한 저수지 수위 오결측 데이터 보정 방안 및 수문 자료 품질관리 방안이 요구된다. 농업용 저수지의 수위 변화 및 강우-유출 현상은 물리적 모형을 구축하여 기상, 지형 등 영향 인자와 수위(또는 유출)와의 상관관계를 분석하는 것은 무적으로 불가능하였지만, 최근 인공신경망 (Artificial Neural Network, ANN) 등과 같이 black-box 형태의 모형을 이용하여 비선형적인 수문해석이 가능해졌다. 본 연구에서는 빅데이터와 인공신경망을 결합시킨 알고리즘인 딥러닝 (Deep Learning) 기반의 LSTM (Long Short-Term Memory) 모형을 활용하여 농업용 저수지 수위자료를 검토하여 자동계측기에서 발생하는 오류 보정을 위해 품질관리 방안을 제시하고자 한다.

  • PDF

A study of spatial scaling approach for regionalization of streamflow data at ungaged watershed (공간적 scaling 기법을 적용한 미계측유역 하천자료의 지역화에 관한 연구)

  • Kim, Jin-Guk;Kwon, Duk-Soon;Choi, Byoung-Han;Kwon, Hyun-Han
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.36-36
    • /
    • 2016
  • 하천정비나 유역종합 치수계획 등 수자원계획을 수립하는 과정에 있어 하천의 설계홍수량 추정은 필수적이며, 하천의 수공구조물의 안전성과 수문학적 위험도를 산정하는데도 활용되고 있다. 그러나 매년 관측되는 강우량 자료에 비해 유출량 자료의 길이가 비교적 짧아 신뢰성 있는 홍수량자료의 구축이 어려운 실정이며, 미계측 유역에 위치한 중소규모 하천의 설계홍수량과 같은 수문학적 자료는 매우 제한적이다. 이러한 이유로 본 연구에서는 기 수립된 하천정비기본계획의 자료들을 활용하여 유역의 특성(면적, 경사, 고도)이 고려되는 새로운 홍수량 산정식을 개발하였으며, Bayesian GLM(generalized linear method) 기법을 활용하여 미계측 유역의 지역화를 통한 홍수량의 추정이 가능하도록 하였다. 또한 Hierarchical Bayesian 기법을 활용하여 개발된 공식에 활용되는 매개변수의 불확실성을 구간을 산정하였다. Bayesian 기법의 도입으로 산정되는 홍수량의 불확실성 구간을 정량적으로 제시할 수 있었으며, 제안된 연구 결과는 미계측 유역의 홍수량을 추정하는 도구로서 활용성이 높을 것으로 기대된다.

  • PDF

Research on the support system and reinforcement range of cross passage tunnel (피난연결통로터널의 지보패턴 및 보강범위 연구)

  • Jung, Min;Han, Ki-Hwan;Park, Jin-Won;Baek, Kyung-Min;Moon, Hoon-Ki
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.3
    • /
    • pp.201-213
    • /
    • 2010
  • Recently, plans of tunnel and construction have increased. Unfortunately, the more we have tunnels, the more we have accidents in there. Because an accident or a fire in the tunnel is fatal to user safety, social concerns are focusing on the disaster prevention facilities. Cross passage tunnel is regarded as one of the useful disaster prevention facilities, which is increasing, while there were only few studies about the support system. This study tried to verify whether the support system is appropriate or not with empirical methods-theoretical methods and back analysis using measurement data. Additionally, we also looked into the range of reinforcement in accordance with strength/stress ratio of rock mass.