Development of Cost Data Prototype based on Production Crew by Productivity Analysis of Form Work (거푸집 공사의 생산성 분석을 통한 작업조 기반의 Cost Data Prototype 개발에 관한 연구)

  • Kang, Dong-Wan;Ji, Soung-Min;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.44-52
    • /
    • 2012
  • In the cost management of public construction projects, it is an important issue to develop an adequate cost data for estimating the predetermined amount by various methods. For a long time, a standard of estimation in korea is used as a basis for estimating the predetermined amount of public construction. However, they did not have a reasonable cost data based on a labor and equipment productivity analysis. For this reason, it is difficult to make a reasonable and efficient estimation of the costs, and this situation presents an urgent need for more accurate cost data to use in an early phase. This study analyzed the productivity of form work by the CYCLONE model, and presented the model on the number of optimal labor through sensitivity analysis. This CYCLONE model can be useful in analyzing productivity on the various sizes of form. Also, the regression model to estimate the daily output can be used in predicting the amount of labor. Considering the work duration in the regression model is expected to make the daily output estimation much more accurate.

WBS Development for Acquisition and Analysis of public Housing Productivity Data (공동주택 생산성 데이터 수집/분석을 위한 WBS 개발)

  • Kim, Jae-Woo;Kim, Yea-Sang;Kim, Young-Suk;Kim, Sang-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.86-94
    • /
    • 2008
  • Productivity is one of key management indexes for evaluating soundness of a manufacturing organization and its efficiency. In many aspects of productivity management in the construction industry, however, intuition of an experienced field manager still plays a greater role while productivity data is not utilized efficiently for the construction management purposes, because the collection and analysis of the productivity-related information are not systematic. Lack of systematic method in collecting and analyzing the productivity data results in such problems. The existing WBS should therefore be improved to solve them. The authors developed a new WBS for productivity data collection and analysis by following the research direction that was determined by literature reviews, overseas cases, and interviews with field engineers. The new breakdown structure was then evaluated for its feasibility as a productivity analysis framework. It is expected that the productivity data collected by the WBS will be used for OLAP and mining for future productivity forecast.

A Study on the Forecasting Model of the Required Cost for the Long-term Repair Plan in Apartment housings (공동주택의 장기수선계획 소요비용 예측모델 연구)

  • Lee, Kang-Hee;Yoo, Uoo-Sang;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.11 no.3
    • /
    • pp.63-68
    • /
    • 2011
  • Building deterioration would be proceeded by various causes such as physical, social, economic degradation. The deterioration would be inevitably prevented or delayed to get the decent function and performance in various building part and components. The maintenance and management are continued to provide the decent living condition for the household. The maintenance means mainly a repair, including the on-time and longterm plan. The longterm repair would be conducted by the systemic preparation in management activity and a required cost. Therefore, the annual due for the longterm repair plan is important to prepare the repair cost in a required time. In this paper, it aimed at analyzing the longterm repair cost and modelling to forecast the required cost in total area, number of household and time elapse in apartment housing. The estimation model of a repair cost is used with a power function which has a good statistics. Results of this study are shown that the sample has a longterm repair due in a $2,032won/m^2{\cdot}yr$ averagely which is higher than $912won/m^2{\cdot}yr$ in domestic. Second, the longterm repair due is proportionally correlated with the time elapse in both a total area and the number of household. Third, the estimation model for the longterm repair amount is suitable for the power function which is most in any other estimation models. Fourth, the ration of the longterm plan repair due a year to the cumulated longterm amount is about 26%.

An Analysis on the Users' behavior of the Parking Area for the handicapped (장애인전용주차구역제도의 이용행위 분석)

  • Yang, Sook-Mee;Kim, Man-Ki
    • Journal of Digital Convergence
    • /
    • v.9 no.5
    • /
    • pp.55-63
    • /
    • 2011
  • The purpose of this study is analyzes the violate behavior the Parking Area for the handicapped and monitor the management problem, therefore presents the improvement alternatives of it. We use the field interview survey method by visiting the government office of cities of 16, commercial facility, housings, medical centers, cultural and sports facilities, express highway rest area. We visited the 50 places and interviewed the 227 violating persons. As a result, violate behavior is divided into the not attachment of sticker on parking possibility and not accompaniment with walking disabled person. We presented the improvement alternatives for the lawful usage of the parking area for the handicapped. First, We have to magnify a recognition and a advertisement about the parking area for the handicapped. Second, We have to improve a management of expense, manpower and civil complains, etc. We have to prepare the legal revision which strengthens the concrete punishment for a violate behavior improvement.

Study of the Improvement of False Fire Alarms in Analog Photoelectric Type Smoke Detectors (아날로그 광전식 연기감지기 비화재보 개선에 대한 연구)

  • Seo, Byung Keun;Nam, Sang Gu
    • Fire Science and Engineering
    • /
    • v.30 no.5
    • /
    • pp.108-115
    • /
    • 2016
  • Fire detectors play an important role in alerting the related people to the initial stages of fire to protect assets and life. Therefore, the performance in detecting fires in the early stages without the risk of false alarms is important. Owing to a recent revision of the national fire safety standards to install smoke detectors in living rooms used for sleeping, staying, hospitalizing in apartment house/efficiency apartment/lodging facility/medical facility/facility for elderly and young, the application of smoke detectors is increasing. On the other hand, there is lack of research in preventing false alarms. This study improved algorithms to prevent false alarms in analog photoelectric smoke detector's due to sudden dust and better classify pollution and fire signals through a self-compensatory function. Through this study, alternatives are suggested to reduce the number of false alarms of Analog Photoelectric smoke detectors, and prevent financial losses due to false alarms.

An Experimental Study on Characteristics of Sprinkler Head Activation in Low Growth Rate Fire (저성장속도 화재에서의 스프링클러 헤드 동작특성에 관한 실험적 연구)

  • Choi, Yong-Seob;Yoon, Jong-Chil
    • Fire Science and Engineering
    • /
    • v.30 no.5
    • /
    • pp.26-35
    • /
    • 2016
  • Sprinkler installations shall be operated at normal operating temperature of the atmosphere as a fire sprinkler head in any facility to control and extinguish the fire when the fire initially. Recently, however, some flush type quick response automatic sprinkler heads in slow fire place is a problem that can not be normal operation are raised. In this paper, by using the experimental model of the Apartment house of Commons and Cabinet burner size bedrooms fire conditions to form a slow growth rate and can supply more than 0.2 MPa pressure is the minimum pressure that can be applied inside the pipe in the field experiment was conducted. In the majority of experiments lush type quick response automatic sprinkler heads which is used in the country it was confirmed to be incompletely opened as the Cold Soldering occur. This phenomenon is likely to fail early fire suppression and control because they can cause the spread of fire and casualties needed to complement domestic product testing and type approval standards through additional research.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

Humidity Change Rate Analysis for Various Waterproofing Method in Underground Structures During Winter Season (지하 구조물 동절기 온도조건에서의 방수공법별 습도 변화량 분석)

  • An, Ki-Won;Lee, Yeon-Sil;Lee, Jung-Hoon;Song, Je-Young;Oh, Sang-Keun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.1
    • /
    • pp.118-125
    • /
    • 2016
  • This paper proposes the appropriate waterproofing methods for underground structures after applying different types of waterproofing materials on the concrete test specimens and selecting the best results out of humidity testing in winter conditions. Results of the testing showed that the underground structures absolutely require relevant waterproofing application based on the environmental conditions; when applied with interior waterproofing, the results showed that the concrete maintained high level of humidity and reinforcing steel within the concrete layer corroded. However, when applied with exterior waterproofing, it was shown that the waterproofing layer prevent direct contact with water and concrete, thereby protecting the concrete structure and improving overall durability. It follows that during underground structure construction, exterior waterproofing methods are have shown by an effective method for improving the durability as well as providing a comfortable interior environment for users.

A Study on the Improvement of Indoor Air Quality in Apartment Buildings (공동주택의 실내공기환경 개선에 관한 연구)

  • Lee, S.H.;Park, J.C.;Rhee, E.K.
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.8 no.3
    • /
    • pp.397-412
    • /
    • 1996
  • This study aims to present the fundamental strategies to improve the Indoor Air Quality (IAQ) in apartment buildings. To investigate the concentration of indoor air pollutants such as radon, formaldehyde, and VOCs, both the document survey and the field measurement were conducted. In addition, to identify the source of the air pollutants, the laboratory experiment was carried out for various building materials. Finally, the minimum period to be reserved befor3e building occupation to ensure healthy IAQ, which largely depends on the ventilation rates, was simulated using a simple compuer program. The results of this study can be summarized as follows: 1. In case of newly-constructed apartment houses, concentrations of formaldehyde, VOCs and radon were found to exceed the standard. Meanwhile, at existing apartment houses, concentrations of VOCs, particularly toluene and xylene, highly exceeded the standasrd level. Concentrations of formaldehyde and radon, however, had been lowered according to the duration of occupation. 2. The laboratory experiment of concentration of pollutants per square meter of building material surface area showed that radon gas was much emitted from the gypsumboard; formaldehyde from flooring and wallpaper; and VOCs from paints and kitchen furnishings. The emission rates of formaldehyde and VOCs were proportional to air temperature. 3. According to the simulation of the minimum period to be reserved before occupation, newly-constructed airtight houses required about 190-200 days, and naturally ventialted houses with fully-open-windows required about 20-45days, in order to keep the level of radon gas lower than standard. Therefore, with the current practice, the date of occupation should be delayed for about 15 days.

  • PDF

Nonlinear Static Analysis of Shear Wall Sub-assemblages Based on the Uniaxial Spring Model (선형 스프링모델을 이용한 전단벽식 부분구조의 비선형 정적해석)

  • Kim, Kyung-Min;Oh, Sang-Hoon;Lee, Sang-Ho;Lee, Han-Seon
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.16 no.2
    • /
    • pp.15-24
    • /
    • 2012
  • Domestic reinforced concrete (RC) apartments have a unique structural system that consists of shear walls and rink members of slabs and lintels. In this study, the nonlinear static analysis of two RC shear wall sub-assemblages, with and without lintels, was conducted using the uniaxial spring model to develop a method for accurately predicting the seismic behavior of domestic RC apartments. In the case of the specimen without lintels, the analytical result successfully represented a simulation of the nonlinear behavior of the specimen in accordance with the test result. On the other hand, in the case of the specimen with lintels, the analysis resulted in underestimating the nonlinear behavior of the specimen compared to the test result, because the coupling effect could not be predicted from the earlier loading cycle.