• Title/Summary/Keyword: 공공 건설공사

Search Result 368, Processing Time 0.028 seconds

Performance Measurement of ISO Quality Management System in the Construction Industry (건설산업 ISO 품질경영시스템의 성과측정에 관한 연구)

  • Lee Woo-Chang;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.414-418
    • /
    • 2004
  • Quality system of construction industry in Korea was a means to prevent unqualified construction work. But lately, it has became an essential requirement. So, lots of construction companies acquire ISO quality management system which provides fundamental management criteria. Now, most of the Korean construction companies have got IS0 quality management system. So, getting ISO quality management system doesn't mean advantage in public competition of construction bidding and that causes increase in the maintenance cost. That's why some construction companies abandon the 150 certificate. Therefore, the authors need to check the effect of ISO quality management system. For this, the authors provide the performance measurement index of ISO quality management system.

  • PDF

건설시장개방과 시장개방에 대응한 건설관련제도 개선방안

  • 대한설비공사협회
    • 월간 기계설비
    • /
    • s.66
    • /
    • pp.52-60
    • /
    • 1996
  • 우루과이라운드 협상에서 건설시장개방은 건설서비스로서 일반시장개방과 정부조달과 관련된 공공건설발주시장개방의 두 측면에서 이루어졌다. 정부는 건설시장과 함께 국내 건설관련 제도들을 계속해서 개선해 오고 있다. 제도 개선의 초점은 입찰, 면허제도 등과 같이 외국업체에 대한 영업자격부여방안이며 그밖에 감리제도 등도 부실공사방지대책과 맞물려 개선이 이루어지고 있다.

  • PDF

A Study on the Reformation of the Contract Time Extension Process in the Public Construction projects (공공건설사업에서 계약기간 연장처리방법 개선에 관한 연구)

  • Cho Young-Jun;Lee Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.81-89
    • /
    • 2005
  • Delay schedule coming about duration extension is happening essentially because public construction project consist of many sub contractor. The method which can calculate delay day is suggested by many studies in case of happing delay schedule, but It is difficult to apply to real construction project because there is no mention about the control of The law of contract according to delay schedule. The law of Contract which is cost of account has more uncertain problem than FIDIC condition of contract. This study suggests method which can make extension of duration procedure clear in case of happing the reason of design change related with activity duration during carrying on construction, and a submission process of the reason of duration extension and modify schedule making way about section which is basis of calculating contract amount clear.

건설기계임대차 표준계약서 제정, 시행

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.7 s.216
    • /
    • pp.52-55
    • /
    • 2008
  • 공정거래위원회가 건설기계임대차 분야에 있어서 불평등한 계약관행을 개선하고 공정한 거래질서를 확립하기 위해 최근 "건설기계임대차 표준계약서"를 제정했다. 이에 따라 국토부는 지난 6월 10일 산하 공공기관 관계자 등과 간담회를 갖고 표준약관으로 제정된 건설기계임대차 표준계약서가 공사대장의 작성.비치.관리와 함께 공사현장에서 널리 사용, 정착되어 건설공사의 투명성이 제고될 수 있도록 적극적인 협조를 당부했다. 이번에 제정된 건설기계임대차 표준계약서는 지난 해 대한설비건설협회를 비롯한 4개 단체와 국토해양부가 협의를 거쳐 공정위에 건설기계임대차 표준계약서 표준 약관을 공정위에 심사, 청구한 것을 공정위가 승인한 것이다.

  • PDF

Conceptual Cost Estimating System Development for Public Apartment Projects (공공아파트 프로젝트 기획단계 공사비 산정시스템 개발)

  • Lee, Hyun-Soo;Lee, Heung-Keun;Park, Moon-Seo;Kim, Soo-Young;Ahn, Jo-Seph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.152-163
    • /
    • 2012
  • At the conceptual phase of a construction project, estimated construction cost is very important as it significantly influences the owner's decision-making. Accurate cost estimating, in the early stage of a public construction project, serves as a critical factor because initial decision-making effects the final cost of a construction project. However in the cases of Korean public apartment projects, excluding a few of the public owners, there is a problem in properly estimating construction cost due to the lack of construction cost estimating system. Thus, this research developed a public apartment cost estimating system using case-based reasoning that was suggested by a previous research with 66 cases of Korean public apartment projects. Based on the system experiments involving 19 public officers and 10 cases of Korean public apartment projects, the effectiveness of the system in terms of estimation accuracy and user-friendly was confirmed. As a result, the developed system has an error range of 1.47% to 13.74% and mean of 6.15%. In addition, the system was evaluated that it could greatly improve the current estimation task of public officers. Consequently, the results of this research can be used as a foundation for a technological advance in estimating construction cost and improving the accuracy and consistency of construction cost estimation.

A Comparative Analysis on Safety Evaluation System and Requirement in the Tendering Process of Public Construction Projects - Cases of Singapore and Japan - (공공공사의 입찰과정에서 안전평가체계와 요건의 비교분석 - 싱가포르, 일본 사례를 중심으로 -)

  • Park, Hee-Taek;Oh, Chi-Don;Park, Chan-Sik;Choi, Jin-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.130-139
    • /
    • 2013
  • Construction accident rates are reflected in the pre-qualification of public construction projects in order to prevent accidents and facilitate the safety management of construction companies. However, the construction industry is still experiencing an increase in accident rates. Hence, there is a need to strengthen existing safety evaluation systems and requirements in public construction tendering. The objective of this study was to acquire and provide basic data for benchmarking to select tenderers in domestic public construction projects. In Singapore and Japan, safety evaluation systems and requirements are applied based on various aspects in order to screen tenderers. These evaluation systems include safety regulations and institutional requirements, as well as safety performance and safety management plans of respective construction projects. This study recommends that korean public construction projects also apply similar safety evaluation systems which include comprehensive safety criteria in order to decrease accident rates in the industry.

Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.

A Study on the Improvement of Safety and Health Activities in the Construction Contractor (Public Institutions) (건설공사 발주처(공공기관) 안전보건활동 수준향상에 관한 연구)

  • Ji-Hwan Moon
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.624-633
    • /
    • 2023
  • Purpose: It Vas intended to identify problems and derive improvement plans by grasping the current status of safety management of public institutions among construction Vork orders. Method: By comparing the disaster status of public institutions compared to the total construction Vork, the analysis Vas conducted based on the results of the evaluation of the level of safety activities of public institutions Vith a high disaster rate and the results of actual consulting. Result: As a result of comparing and analyzing the current status of safety management of public institutions, the current status and problems of safety management in public institutions Vith a high accident rate Vere similarly discovered. Safety management organizations, document management systems, safety management systems, and risk assessment activities are operated Vithout reflecting the size and characteristics of the organization, so improvement in the relevant field is needed. Conclusion: Safety-related professionals and organizations should be formed according to the size of construction orders, and responsibility and authority should be clearly assigned. Since risk assessment is conducted formally to prepare a safety and health ledger, it is necessary to derive risk factors to prevent safety accidents for the actual construction. It is expected that the level of safety activities can be improved if it is improved by reflecting the size and characteristics of public institutions.

An Empirical Analysis on the Presumption of Public Apartment's Construction Cost in Housing Land Development Project (택지개발사업의 공공주택건설공사비 추정의 실증적 분석)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.81-88
    • /
    • 2011
  • Providers haven't recently had a flexible construction cost estimation system to meet various needs of consumers about public housing. So the subject of this study is to estimate construction cost reasonably in early project stage of public housing and then develop reliable means which is able to support construction cost management and establish a adequate funding investment plan as a provider. In this study, Regression analysis was performed by the case on 20 public apartment complex which were designed from the first half of 2007 to the first half of 2008. A total construction cost of construction, civil engineering, machinery, elevator, land scape, electricity and communication work was used as one sample for increasing explanation and representativeness of the case. In addition, The total construction cost which is devided into design, contract and completion cost was variously analysed for increasing relevance of model and actual utilization. The result of estimation model based on a total construction cost set up completion and design cost showed that error rate is within 2%, which is a excellent result. The estimation model of the construction cost developed by this study is expected to estimate approximate construction cost which is adjacent real construction cost in early stage of the project by using some data.

A Suggestion of the ADR in Public Construction Disputes (공공건설사업에서의 사전분쟁해결(ADR)방법 도입방안)

  • Cho, Young-Jun
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2006.05a
    • /
    • pp.356-359
    • /
    • 2006
  • Dispute is construction itself. Serious difficulties ore occurred between contract parties when These disputes have occurred. Authority may fear the defective work if the requirement of contractor is fully reflected in the adjustment of contract. On the other hand the contractor may have fears that no payment or some payment of the extra work or the additional work done will be required. Therefore these problems must be resolved before these result in an enlarged riffle effect. To reduce the fear of the contract parties, ADR(Alternative Dispute Resolution) process were suggested.

  • PDF