• Title/Summary/Keyword: 공간별 공사비

Search Result 77, Processing Time 0.03 seconds

Efficiency Analysis for RFID-based Curtain Wall of unit Type Construction (RFID 기술 적용에 따른 유닛타입 커튼월 공사의 효율성 분석)

  • Kang, Hyun-Koo;Ha, Young-Seo;Lim, Chul-Woo;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.206-213
    • /
    • 2008
  • Due to the following reasons, the management of curtain wall parts and material is very Important. Firstly, curtain wall work is one of the main works in High-rise building construction for it takes about $10{\sim}15%$ of the total construction cost. Secondly, the whole process of curtain wall work including manu acture, delivery, storage, installation and maintenance is very complicated and sometimes more than 30 companies involve in the process. Thus there are many control points for curtain wall units. Thirdly, there are not enough space on site for material storage and this situation is more serious for sites in urban area. The purpose of this research is to validate an information systems using RFID technology that is developed to manage the curtain wall units following the process of curtain wall work. For the validation, the cycle times of curtain wall work before and a ter the system was used. The results show that using the systems shorten the cycle time of the curtain wall work. Thus it is concluded that the system can increase the efficiency of managing curtain wall work.

A Study of Planning and Application of Fire Protection Facilities in Remodeling (리모델링시 소방시설의 계획 및 적용에 관한 연구)

  • Jung, Jin-Ho;Yun, Myung-O;Je, Jin-Ju
    • Fire Science and Engineering
    • /
    • v.22 no.5
    • /
    • pp.90-98
    • /
    • 2008
  • There are diverse barriers such as limits to space, time, economy, technology, institution, and etc. in remodeling construction compared to new construction and it needs to overcome such limits. Consequently, for effective performance of construction, planning and application fit for remodeling characteristics shall be made available in time and various studies into remodeling for each construction category are necessary to achieve this. Taking these into account this study conducted research of the followings to draw out necessary steps for planning and application of fire protection facilities in remodeling, to overcome various barriers that may arise during any project operations, and to provide useful materials for construction of reasonable and effective fire protection system.

The Evaluation on the Prediction Ratio of Landslide Hazard Area based on Geospatial Information (공간정보 기반 산사태 발생지역 예측비율 평가)

  • Lee, Geun-Sang;Lee, Ho-Jun;Go, Sin-Young;Cho, Gi-Sung
    • Journal of Cadastre & Land InformatiX
    • /
    • v.44 no.2
    • /
    • pp.113-124
    • /
    • 2014
  • Recently landslide occurs frequently by heavy rainfall, therefore there area many studies to analyze the vulnerable district of landslide and forecast the occurrence of landslide. This study analyzed soil characteristics in the occurrence district of landslide and the occurrence possibility of landslide ranked high in well draining soil as the result of frequency ratio according to the characteristics of drainage. Also as the result of frequency ratio of slope derived from DEM data, the occurrence possibility of landslide ranked high in slope range of $20{\sim}40^{\circ}$. And Also as the result of frequency ratio of aspect by geospatial analysis, the occurrence possibility of landslide ranked high in north aspect. Also, it is possible to evaluate the vulnerability of landslide by overlapping frequency ratio of the drainage of soil, slope and aspect. And future prediction ratio of landslide occurrence can be evaluated by performing the analysis and validation process respectively on the subject of the occurrence district of landslide.

The flow of Temporary Facility Planning Information in High-rise Building Construction (고층건축공사에서의 가설계획 정보흐름)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.91-96
    • /
    • 2002
  • The purpose of this study is to present a systemized flow of temporary facility(TF) planning information. The current TF planning tends to be established by subjective decision making of field workers. Therefore TF planning needs more systemized information flow to provide a reliable schedule. The study was implemented through interview with experts for reliable TF planning. The main contents of the study are as follows; 1) TF planning process model(IDEF0) are established. 2) Various information flow diagrams proposed to support TF planning decision-making. The study recommends that, as a future research, the computer system be developed for application of the information flow.

Improvement of existing drainage system for leakage treatment in exiting underground structures (운영중인 지하구조물의 누수처리를 위한 유도배수공법의 개선)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.669-683
    • /
    • 2017
  • The objective of this study is to propose a modification of the previously proposed drainage system for catching the partial leakage of underground concrete structures. Two techniques were proposed for applying the drainage system only to the leaking parts. One was for conveying leaking groundwater to the collection point in the drainage system and the other was for conveying the collected groundwater to the primary drainage system of the underground concrete structure. Four waterproofing materials for conveying leaking groundwater to the catchment point of the drainage system, Durkflex made of porous rubber material, KE-45 silicone adhesive with super strong adhesion, Hotty-gel made of polymeric materials and general silicone adhesive were evaluated for waterproofing performance. Hotty-gel only showed perfect waterproof performance and the other three waterproof materials leaked. The modified drainage system with Hotty-gel and drainage pipe with fixed saddle to convey the leaking groundwater from the catchment point to the primary drainage system were tested on the concrete retaining wall. The waterproof performance and the drainage performance were evaluated by injecting 1,000 ml of water in the back of the modified drainage system at the 7-day, 14-day, 21-day, 28-day, 2-month and 3-month. There was no problem in waterproof performance and drainage performance of the modified drainage system during 3 months. In order to evaluate the construction period and construction cost of the modified drainage system, it was compared with the existing leaching repair method in surface cleaning stage, leakage treatment stage, and protective barrier stage. Total construction period and construction cost were compared in considering the contents of work, repair material, construction equipment, working time, and total number of workers. As a result of comparing and analyzing in each construction stage, it was concluded that the modified drainage system could save construction period and construction cost compared to the existing leaching repair method.

Deduction of affecting factors for selecting the way of going into the main building of an apartment complex when constructing an underground parking lot. (지하주차장 공사시 주동진입방법 선정 영향요인 도출)

  • Song, Nak-Hyun;Whang, Kyoung-Jin;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.995-998
    • /
    • 2007
  • The number of households old over as much as 20 years is expected to get increased rapidly more than 1,000,000(1 million). As a measure to this fact remodeling is being revitalized over the country. parking lots expansion actually takes up a great deal of weight among the requirement for remodeling. When constructing a parking lot for enlargement, the way of going into the main building determines such construction features as selection of Retaining Wall Method, installation of an elevator, parking measure of capacity, etc. This study derived the affecting factors for selecting the way of going into the main building when constructing an underground parking lot. In a research way, we examined the features on each method of going into the main building in an apartment complex through an in-depth interview with some experts after investigating the method of enlarging an underground parking lot and going into the main building. After that, we derived the affecting factors for selecting the way of going into the main building. The affecting factors include constructability, convenience, economic efficiency as a high level as well as existence and nonexistence of basement and removal, safety of current building, parking measure of capacity, amenity, inhabitant traffic line, construction expenses and construction duration as a low one. This study will be applied as a reference for selecting the way of going into the main building when constructing an underground parking lot especially targetted on an old apartment house.

  • PDF

Earth pressures acting on vertical circular shafts considering arching effects in c-$\phi$ soils : II. Lab. Model Tests (c-$\phi$ 지반에서의 아칭현상을 고려한 원형수직터널 토압 : II. 실내 모형실험)

  • Kim, Do-Hoon;Cha, Min-Hyuck;Lee, Dea-Su;Kim, Kyung-Ryeol;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.2
    • /
    • pp.129-144
    • /
    • 2010
  • The earth pressure acting on the vertical shaft is less than that acting on the retaining wall due to three dimensional arching effect. Thus, it might be essential to estimate the earth pressure actually acting on the shaft when designing the vertical shaft. In this paper, large-sized model tests were conducted as Part II of companion papers to verify the newly suggested earth pressure equation proposed by Kim et al. (2009: Part I of companion papers) that can be used when designing the vertical shaft in cohesionless soils as well as in c-$\phi$ soils and multi-layered soils. The newly developed model test apparatus was designed to be able to simulate staged shaft excavation. Model tests were performed by varying the radius of vertical shaft in dry soil. Moreover, tests on c-$\phi$ soils and on multi-layered soils were also performed; in order to induce apparent cohesion to the cohesionless soil, we add some water to the dry soil to make the soil partially-saturated before depositing by raining method. Experimental results showed a load transfer from excavated ground to non-excavated zone below dredging level due to arching effect when simulating staged excavation. It was also found that measured earth pressure was far smaller than estimated if excavation is done at once; the final earth pressure measured after performing staged excavation was larger and matched with that estimated from the newly proposed equation. Measured results in c-$\phi$ soils and in multi-layered soils showed reduction in earth pressures due to apparent cohesion effect and showed good matches with analytical results.

Cost Analysis of Construction Phase in Basement Composite Wall Form (지하 합벽 거푸집의 시공단계별 원가 분석에 관한 연구)

  • Choi, Oh-Young;Heo, Kyoung-Moo;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.189-195
    • /
    • 2009
  • Recently, the urban centralization phenomenon appears to be growing. As a result, many vigorous efforts for the use of underground space are being made. In particular, the basement depth of construction in the downtown area has deepened and construction is often done close to adjacent buildings. In this case, generally, the underground construction approach mainly used is the composite basement wall system. However, a cost analysis of the basement composite wall system does not exist. Therefore, in this study, the cost of the composite basement wall system was analyzed. The percentage breakdown of costs were: buttress work processes, 3% form work processes, 26% reinforcement work processes, 12% support work processes, 42% and other processes,17%. Accordingly, it will be necessary when developing new technology and construction methods to determine the development focus.

Optimal Design of Storm Sewer by Computations of Feasible Hydraulic Gradient Line (합리적 동수위 계산을 통한 최적 배수관로 설계)

  • Yoo, Hee-Sang;Kim, Mun-Mo;Ahn, Won-Sik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1585-1589
    • /
    • 2009
  • 최근 빈발하는 국지성 호우나 태풍에 의한 집중호우로 도시지역의 내배수불량으로 인하여 저지대 및 지하공간의 침수현상이 빈번히 야기하고 있는 실정이다. 특히 연안이나 외수위의 영향으로 강제배수가 요구되는 지역인 경우에는 개발에 앞서 선결해야할 중요한 재해저감대책 중의 하나이다. 이에 본 연구에서는 연안의 해수면 및 하천 홍수위로 인한 계획단지 내 배수관로의 동수위 산정을 위한 유출모의를 수행하였다. 연안저지대의 순성토 지역인 경우 동수위 계산에 따른 성토량에 의한 비용이 전체 공사비 결정 요인의 가장 큰 부분을 차지하고 있으므로 이에 따른 경제적이면서 치수안전도를 증가시킬 수 있는 계산 방법을 정립하는 것은 선결되어야 할 문제이다. 이를 위해 도시유역에 범용적으로 사용되고 있는 SWMM 모형을 활용하였다. SWMM 모형 중에서 EXTRAN 블록을 통한 유출모의는 관거내 동수경사를 계산하여 배수, 역류, 압력류, 월류까지도 모의할 수 있다. 다양한 조건으로 배수관로의 설계를 통한 동수위와 성토고를 분석하여 조건별 경제성과 치수안전도를 검토할 수 있으나 관로 크기, 경사, 방향 등을 우선하여 변경해가면서 최적안을 확인하였다. 검토된 계산 절차에 따라서 향후 지형적으로 유사한 지역에서의 배수시스템 설계에 적용 및 기존 배수관망 재설계 및 확장 등의 검토에 효과적으로 적용할 수 있을 것이다.

  • PDF

A Study on the Establishment Process and Spatial Composition of TaiSho Park in Modern Busan (근대 부산에서 대정공원의 성립 과정과 공간 구성에 관한 연구)

  • Kang, Young-Jo
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.31 no.2
    • /
    • pp.92-102
    • /
    • 2013
  • This study aimed to reveal the establishment process and spatial composition of TaiSho park in modern Busan. The TaiSho park is an athletic park which combines a playground and a rest facilities. The arguments on construction of playground commenced for commemorating Kameyama, Busan director official, when he moved to Taiwan in 1910. First Proposers which construct to sport park were businessman in that time. However, construction of playground was progress as a commemoration business of accession of Taisho Tenno. Playground construction got into stride by the proposal of the Busan mayor Wakamatsu in 1917. When it looks into process of discussion about a site selection candidate, norms of playground site selection are the paly ground which appropriate with effective site area and distance between park and a section of a city, in other hand, those are accessibility and budget. As a result of several arguments and actual site investigation, it was decide to select a site which enters to elementary school, after the isolation hospital relocates. The cost of construction of the TaiSho park is prepared by donation of the Busan civil. The donation fund raising committee was constituted by local commerce and industry people, a company, government, municipal offices and area, and funds was raised systematically. As a result, total amount of construction cost was made from the donation of local civil. The TaiSho park is broadly into two sectors; exercise area and rest and pleasure space. Entrance was set up in three aspects of the park and the subcontract planted. The baseball field took the seat in the central part of the park, and also prepared two tennis courts. Japanese Sumo field was also prepared for the north side of the park. The significance of the TaiSho park in Korea Park history can be summarized in South Korea's first sports park and which was made from the donation of local civil. The remained subjects from this study are to clarify the disappearance process of TaiSho park and a reason why modern Busan people want to get playground.