• 제목/요약/키워드: 곡선터널

Search Result 197, Processing Time 0.022 seconds

A numerical study on the characteristics of the smoke movement and the effects of structure in road tunnel fire (도로터널 화재시 연기의 전파특성과 구조체에 미치는 영향에 관한 수치 해석적 연구)

  • Yoo, Ji-Oh;Oh, Byung-Chil;Kim, Hyo-Gyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.3
    • /
    • pp.289-300
    • /
    • 2013
  • This study numerically considered the characteristic of smoke movement and the effect of hot smoke gas on tunnel wall surface temperature during road tunnel fire under boundary condition of fire growth curve that is applied to fire analysis in road tunnels. The maximum heat release rate were 20 MW and 100 MW and tunnel air velocities were 2.5 m/s and velocity induced by thermal buoyancy respectively, also the cooling effect of tunnel wall was considered. As results, when tunnel air velocity was constant at 2.5 m/s during tunnel fire, due to the cooling effect of tunnel wall, the smoke layer was rapidly descent after some distance and it flowed the same patterns at the downstream. When heat release rate was 100 MW (and jet fan was not installed), the maximum temperature of tunnel wall surface has risen up to $615^{\circ}C$. The heat transfer coefficient of tunnel wall surface was varied from 13 to $23W/m^2^{\circ}C$ approximately.

VPN Tunneling Protocol Design based on ECC (ECC기반 VPN 터널링 프로토콜 설계)

  • Choi, Eun-Sil;Lee, Byung-Kwan;Jung, Eun-Hee
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2003.11c
    • /
    • pp.2001-2004
    • /
    • 2003
  • 본 논문은 네트워크계층에서 IP패킷을 송 수신자간에 사전에 합의된 알고리즘을 이용하여 암, 복호화 하는 통신 터널링 프로토콜로, 공유비밀키 생성을 위해 ECC((Elliptic Curve Cryptosystem)알고리즘을 사용함으로서 키 생성시간의 단축과 보안 강도을 강화시켰다. 또한, 공유비밀키 교환을 위해서 타원곡선을 이용한 EC-DH(Elliptic Curve Diffie Hellman)알고리즘을 사용하고, IP패킷의 무결성 검증과 인증을 위해 HMAC-SHA-1알고리즘, 패킷을 암 복호화하기 위한 대칭키 알고리즘인 DES를 사용하였다.

  • PDF

The applicability of FRP material for tunnel support (터널보강재로서 FRP재료의 적용성 검토)

  • Choi, Yong-Ki;Kwon, Oh-Youb;Bae, Gyu-Jin;Cho, Mahn-Sup
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.1
    • /
    • pp.11-19
    • /
    • 2001
  • The purpose of this study is to improve the problems in Umbrella Arch Method, such as the oxidation, the difficulties in installation and cutting of the steel pipe. The applicability of the high strength FRP (Fiber-Reinforced-Plastic) materials composed of glass fiber as a substitute of steel pipe was investigated in this study. The results of this study show that FRP material is better than steel pipe in work performance and the durability of material except for its price. From the numerical analysis with various types of FRP, it was evaluated that the equiangular curve type is more efficient than the flat type developed abroad, and the supporting effect of FRP-grout mixture is similar to that of steel-grout mixture in results of bending strength test.

  • PDF

A Study on the Application of Roof Panel Shield Method (RPS 공법의 적용성 연구)

  • Kim, Jung-Hyi;Jung, Byung-Chul;Shin, Eun-Chul;Kim, Jong-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1585-1592
    • /
    • 2008
  • 산업사회의 발전에 따라 사회 기반시설분야도 복잡다양해지고 특히 도시기능이 활발해지면서 지금의 도심지에는 지하철, 상수도, 하수도, 전력구, 통신구, 지하보차도, 지하상가, 지하주차장 등 여러 가지 용도의 지하공간이 요구되고 있으며, 이러한 지하 구조물을 축조하는데 있어 도로상에 차량 증가로 인한 교통 혼잡이나, 지하매설물의 장애로 인하여 기존의 개착식 공법으로 시행하지 못하고 지하터널공사로 시행하는 경우가 빈번하다. 기존 국내 외 터널공법 관련문헌과 현재 사용되는 터널공법의 실제 시공에 관한 정보를 수집하여 장 단점, 시공시 주의사항, 적용조건등의 조사내용을 바탕으로 RPS 공법을 고안하였다. 소규모 지하구조물을 구축하기 위한 RPS 공법은 출발갱내에서 상부에 파이프 루프를 시공한 후 광폭 유압 패널이 장착된 철제 선도관을 추진시켜 선도관을 원압잭에 의하여 압입한 후 P.C. 콘크리트 구조물을 거치하고 원압으로 압입 추진토록 하였다. 또한, 대규모 지하구조물 축조시에는 구조물 예정상단부에 지반조건에 따라 파이프 루프공법 또는 소구경 Semi-Shield 공법을 이용하여 루프를 시공함으로써 상부의 침하를 방지하고, 측벽은 광폭유압 패널을 이용하여 여굴의 최소화 및 곡선부 시공을 용이하게 하였다.

  • PDF

Influence of Zero Reading on Predicting Crown Displacement of Tunnel (초기계측 시점이 터널 내공변위 예측에 미치는 영향분석)

  • Kim, Kwang-Yeom;Kim, Ho-Geun;Seo, Youg-Seok
    • Tunnel and Underground Space
    • /
    • v.22 no.3
    • /
    • pp.214-220
    • /
    • 2012
  • Deformation behaviour of rock mass around an opening measured during tunnel excavation is very important in order to assess the stability of the tunnel. Unfortunately displacement measured only after the installation of displacement measuring device can be acquired, which results in inevitably excluding the pre-displacement occurred and accumulated before the displacement measuring devices are installed. So it is very important to consider the pre-displacement based on the elapsed time before zero reading after deformation behaviour started. In this study, the accuracy of total estimated displacement depending on the distance between face and measurement position is calculated by statistical non-linear fitting on measurable displacement data. Besides, the influence of the unavoidable measurement error is considered by using Monte-Carlo simulation. As a result, the faster the initial reading started and the smaller the measurement error is, the higher the accuracy of estimating total displacement is obtained.

A Study on Fire Resistance Character of a Tunnel and an Underground Structure (터널 및 지하구조물의 내화특성에 관한 연구)

  • Yoo, Sang-Gun;Kim, Jung-Joo;Park, Min-Yong;Kim, Eun-Kyum;Lee, Jun-Suk
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.2
    • /
    • pp.194-200
    • /
    • 2010
  • Recently, a longitudinal tunnel construction has increased because of subway construction extension, geomorphological effect and the development of construction Technologies etc. When the fire occurs in a tunnel and an underground structure, the many damage of human life and the economic losses are caused. In Korea, fire resistance character study of a tunnel and an underground structure is proceeding. However, when a concrete is exposed to high temperature, study of load carrying capacity reduction and stability evaluation for spalling of a concrete is not enough. Therefore in this study, fire resistance character of a concrete evaluated according to time heating temperature curve(RABT and RWS) and a result compared on virtual fire accident in order to apply fire scenario. Also this study performed thermo-mechanical coupled analysis of a FEM-based numerical technique and estimated fire-induced damage of a tunnel and an underground structure.

Clogging Phenomenon and Drainage Capacity of Tunnel Filters (터널필터재의 폐색현상과 배수성능 평가)

  • 이인모;유승헌;박광준;이석원;김홍택
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.5
    • /
    • pp.3-18
    • /
    • 1999
  • The geotextile filter, which is installed between the ground and the lining and used as a tunnel drainage system, should have sufficient groundwater drainage capacity so that water pressure does not act on the lining. The clogging may have a serious effect on the long term behaviour of geotextile filters. Two typical weathered residual soils in Korea, Shinnae-dong soil and Poi-dong soil, were chosen to investigate the in-plane flow characteristics of the soils with varying degree of compressive stresses applied on the geotextiles and with various conditions of hydraulic gradient. The Shinnae-dong soil is a relatively coarse material classified as'SW-SM'; on the other hand, the Poi-dong soil is much finer and is classified as'SC'. Based on the comparison of the $O_{95}$ of geotextile to the $D_{15}$ of residual soils, existing clogging criteria were reviewed, and a tentative clogging criterion for the in-plane flow of the residual soil through filters was proposed. The Shinnae-dong soil showed noticeable clogging phenomenon, while the clogging of the Poi-dong soil was not so serious. The Poi-dong soil seemed to be hindered in particle transport by its cohesiveness.

  • PDF

Study on a Wire Saw Rock Cutting Model for Tunnel Excavation and Cutting Performance Improvement (터널굴착용 와이어쏘 암반절삭 모델 구축 및 절삭성능 향상 연구)

  • Lee, Jin-Ho;Ahn, Sung-Kwon;Lee, Kyoung-Chan;Bang, Choon-Seok;Sagong, Myung
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.39 no.10
    • /
    • pp.1069-1077
    • /
    • 2015
  • In tunnel excavation using blast, the wire saw rock cutting method generates a discontinuity perimeter around the center cut, and thus prevents blast vibration propagation to reduce vibration and noise. Therefore, the method is expected to be easy to use and economical compared with other methods. In this paper, the cutting mechanism of wire saw in tunnel excavation is investigated. A model describing the changes in cutting depth and wire saw shape inside a rock during cutting is established and validated for this purpose. Through a simulation using the model, the important characteristics of wire saw cut are investigated, and the influences of cutting conditions, such as wire saw tension, wire saw speed, feed speed, depth, and diameter of boring, on cutting performance are also examined. A method to improve the cutting performance is proposed based on the results.

An Assessment of Rock Pillar Stability in Tunnel Asymmetric Diverging Area using the Mohr-Coulomb Failure Theory (Mohr-Coulomb 파괴접근도 방법을 이용한 비대칭 분기부 암반필러의 안정성 평가)

  • Lee, Choul-Kyu;Lee, Kang-Il;Kang, Jae-Gi
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.4
    • /
    • pp.17-23
    • /
    • 2016
  • This study assessed the behavior of rock pillar in tunnel asymmetric diverging area by using a three dimensional numerical analysis. The stability of pillar is very important for the ensure the stability of the tunnel asymmetric diverging area. Based on parameters affecting the behavior of rock pillar, this study evaluated different safety factors according to pillar width, depth and rock conditions. It turned out that as the rock pillar width increases, the change curve of safety factors in accordance with depth and rock conditions shows more of the nonlinear behavior. By the assessment of the minimum safety factor, a safety factor chart on the behavior of rock pillar in tunnel asymmetric diverging area was suggested.

A study on numerical modeling method considering gap parameter and backfill grouting of the shield TBM tunnel (쉴드 TBM 터널의 gap parameter와 뒤채움재를 고려한 수치모델링 방법에 대한 연구)

  • You, Kwang-Ho;Kim, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.5
    • /
    • pp.799-812
    • /
    • 2017
  • Backfill grouting and realistic convergence distribution were not properly considered in previous studies on 2D numerical analysis of a shield TBM tunnel. In this study, a modeling method was suggested to cope with this problem by considering a realistic convergence distribution and proper properties of backfill grouting. To this end, the influence of gap parameter and depth of rock cover on volume loss and composed of ground volume loss around tunnel excavation and surface volume loss were analyzed with a single layer of weathered soil. As a result, most of surface settlements were occurred immediately after excavation. Additional, as depth of rock cover and gap parameter increased, the influence range of surface settlement curves obtained from 2D numerical analyses became broader than a suggested theoretical equation. Therefore, it is inferred that gap parameter should be applied based on load distribution ratio and the property of backfill grouting properly considered for the estimation of the precise behavior of a shield TBM tunnel in 2D numerical analysis.