A Study on Development Framework of Lift-up and Procurement System for Effective Resource Management in the Building Construction (건설공사의 자재관리 효율화를 위한 조달 및 양중시스템 기반구축에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.133-139
    • /
    • 2004
  • The purpose of this study is to present an improved lift-up &procurement work flow for effective resource utilization in building construction. The current lift-up &procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up &procurement work flow. The main contents of the study are as follows; 1) Problems of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning was investigated. The study recommends continuous improvement of lift-up &procurement work flow and efficient management of information in building construction as a future research.

A Location Model for Tower Cranes of High-Rised Building Construction (고층건물 타워크레인 위치선정 모델)

  • Park Jung-Hyun;Lee Hyun-Shic;Hyun Chang-Taek;Koo Kuo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.614-617
    • /
    • 2003
  • Recently the demand of constructing high-rised building grows larger. So it becomes more important to make an exact plan of a tower cranes which has an important position in high-rised building construction. Nevertheless businessmen of construction sites only depend on a great store of experience without a clear process of locating tower cranes. The object of this study is to set up the process model for locating tower cranes. The study went off through a study of related documents, an interview with some experts and a visiting of job sites. In result the study suggests a process model which has four steps of considering an establishing, disjointing, a radius of working, easy working. Case study was examined to estimate the feasibility and applicability of the proposed model. As a result, the model is proven to be a method to locate tower cranes quickly and cleary, and to operate properly as a decision-making tool.

  • PDF

The application of tact time at finish work for building construction - Focused on Office Building - (건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로-)

  • Yoon, You-Sang;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.90-97
    • /
    • 2005
  • Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.

A Feasibility Study on Optimal Lifting Planning in the High-rise Apartment Building Construction (공동주택공사의 건설용 리프트를 이용한 양중계획 타당성 분석)

  • Lee, Jun-Bok;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.185-193
    • /
    • 2008
  • In order to improve work efficiency in high-rise apartment building construction, it is required to establish the major criteria and practical method for selecting the construction lifts. It is necessary to analyze work efficiency and economic feasibility depending on speed, size and capacity of lifting equipment and characteristics of construction projects. The purpose of this research is to develop the fundamental process and information for selecting the lift in order to plan and manage the material lifting and laborers' vertical transporting in the high-rise apartment building projects more effectively. In order to satisfy the objective of the research, work performance of the lifting machines with different speed and carrying capacity is analyzed under the practical constraints. In addition, potential economic evaluation is conducted. One of the significant findings of the research is that the mid-speed lift shows 43% improvement in work efficiency compared with the low-speed lift. The results of the research will be used as the basis for developing the further optimal lifting management system.

A Case Study on the Demolition of Power Plant with Blasting Method for the First Time in Korea (국내 최초 발파공법 적용 발전소 해체 사례)

  • Oh, Ki-Taek
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.87-88
    • /
    • 2023
  • 서해안 최고의 동백정해수욕장과 마량리 동백나무숲은 1970년대 오일쇼크 이후 에너지 자립을 위해 발전소를 건설하면서 사라졌다. 그 당시 준공된 화력발전소는 전력공급 이라는 소임을 완수하고 2021년 부터 동백정의 아름다운 옛 모습 그대로 지역주민에게 돌려 주기위한 친환경 사업으로 발전소 철거공사를 시작, 동백정 복원공사를 추진 하기로 했다. 고층 및 중량물의 건축물 및 구조물을 안전하게 해체하기 위해서는 국내 최초 발전소 철골구조물에 대한 발파·전도공법을 채택 하였다. 철거작업은 고위험 공종으로 참여 주체인 발주자, 설계자, 감리자, 시공자 및 근로자 전 계층의 참여로 사전 위험성평가를 통해 근원의 위험요인 발굴 및 안전대책 수립, 수립된 안전대책 100% 이행을 통해 무재해 준공 달성 하기를 기대한다.

  • PDF

A Study on the Influence of Blasting Vibration and Sound on Each floor in Building during Blasting Operation (저층건축물 인근 발파작업시 진동 및 폭음이 층별로 미치는 영향 연구)

  • 이신;김상욱;을지나란플래브토톡;강대우
    • Explosives and Blasting
    • /
    • v.22 no.3
    • /
    • pp.35-41
    • /
    • 2004
  • Many buildings have been bolt in Korea. Because blasting operations and more efficient to make excavate rock than other methods, it's more extensively used for new construction, enlargement of buildings, subway work, etc. However, blasting vibrations and sound often create pollution. A study, 'The place of gathering earth and sand to construct a building site in Yangsan', has been done in Gyo-dong, in Yangsan. There are two high-rise apartment and buildings, beside a construction site. The blasting vibrations and sound were monitored on the 1st, 4th floors in building(4th floor), and the results of the analysis are as follows: The blasting vibrations decreased being transmited from 1st floor to 4th floor.

조립식 위생기구 시스템 - [제일시스템 토일렛]

  • 대한설비공사협회
    • 월간 기계설비
    • /
    • s.97
    • /
    • pp.79-84
    • /
    • 1998
  • 현재의 오피스빌딩은 인간생활의 쾌적함을 추구하기 위하여 인텔리전트화, 대형화, 고층화로 발전하고 있다. 아울러 화장실 공간은 단순한 생리현상 해소의 장소뿐만 아니라 로비, 엘리베이타홀과 더불어 건축물의 이미지를 높여주는 장소, 기분전환의 장소, 건강관리의 장소, 더 나아가 활력을 불어넣는 휴식의 장소로서 역할을 담당하게 되었다. 제일시스템 토일렛은 공장에서 제작된 일체화된 유니트가 즉시 현장에 설치되므로 공기의 단축, 경제성, 품질의 균일화를 동시에 해결한 제품으로 한차원 높은 화장실 공간을 연출하고 있다.

  • PDF

Automated Life-Cycle Management System Based on SCM for Super High-rise Buildings Construction (SCM기반 Automated Life-Cycle Management System 구축방안 - 초고층 빌딩 커튼월을 중심으로 -)

  • Yoon Jeong-Hwan;Kim Yea-Sang;Chin Sang-Yoon;Kim Chang-Duk;Choi Yoon-Ki;Chun Jae-Youl;Lim Hyung-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.430-433
    • /
    • 2003
  • Cost, schedule, quality are the essential parts of success of every construction project. It is especially true in high-rise building construction. Among the construction components in high-rise building construction, curtain walls are very important elements for the project success because they take large portion of cost and schedule. However, curtain wall construction process are very complicated, where many entities including designers, suppliers, contractors and even maintenance contractors are involved. Therefore, control and management of their relationships and production process are critical. It is suggested that this can be solved by the concept of Supply Chain Management which is supported by the automated information technology with Radio Frequency Identification. Such concept is defined as 'Automated Life-Cycle Management System Based On SCM' and this study suggests rode map to establish the system.

  • PDF

A Study of the High-rise building's Lift-up Management - through Division of Loading Factors of Equipment materials (초고층 건축 공사의 효과적인 양중 제안 - 설비공사 양중부하 분배 개선 방안)

  • Chung Yun-Woo;Kim Eun-Sang;Suh Hyun-Ah;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.539-542
    • /
    • 2004
  • Nowadays, High-rise building becomes higher and bigger than ever. As a result, lots of construction materials are needed at the same times. Because of divided diverse process of construction, several different Processes concur simultaneously with complexity of procurement. So, effective construction material supply and lift-up are essential part of the spot. Especially, when ending part of construction, there are much conflict between finishing and equipment materials also problems of folding lift-up. The Purpose of this paper is suggesting better effective lift-up system through analysis of loading factors.

  • PDF

The Voluntary Assurance of Quality by Contractors in the Construction Phase (건설 공사단계에서 수급자 중심의 품질확보방안)

  • Cha, Sang-Ho;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.292-300
    • /
    • 2011
  • The construction industry in Korea has seen significant improvements in quality management techniques, driven by the dramatic development of new technology through Manhattanization and enlargements, but compared with technical development, the level of building quality improvement is still lagging behind. In the meantime, as the interest in construction quality soars due to changes in user consciousness, the level of quality that is being demanded is rising. The government has reinforced quality systems by implementing responsible supervision requirements and granting overseas companies permission to enter the supervision business in Korea, and private sector companies also are attempting quality improvement through quality assurance approaches like the preliminary qualification screening system and ISO 9000 series. But currently, building constructions are done only according to the construction specifications of project owners, whose design, materials and construction methods are already decided, and do not leave any necessity or opportunity for technical developments for the quality improvement of contractors. Therefore, in this study, a work process and system improvement plan for payment regulations is proposed, with which contractors can secure quality voluntarily in the building construction phase.