• Title/Summary/Keyword: 고속도로 터널

Search Result 155, Processing Time 0.025 seconds

Evaluation of Penetration Rate and Cutter Life of TBM in Jook-Ryung Tunnel (죽령터널에서의 TBM 굴착속도 및 커터수명 평가연구)

  • Park Chul-Whan;Synn Joong-Ho;Park Yeon-Jun;Jeon Seok-Won;An Hyung-Jun
    • Tunnel and Underground Space
    • /
    • v.15 no.5 s.58
    • /
    • pp.378-386
    • /
    • 2005
  • Jook-Ryung roadway tunnel was constructed by drill-blast after pilot tunnelling by 2 TBMS. nis report analyzes the data for TBM performance in the total length of 7.3 km for the two pilot tunnels. Net penetration rates were recorded as high as 2.3 m/h and 2.0 m/h for the two different directions while degrees of operation were $31.4\%$ and $33.3\%$, respectively. The cutter lives for No.2 tunnel were evaluated $200\~280\;m^3/c$ and around 400 m/set as high as for Meraker 10 km tunnel in Norway. The relationship between net penetration rate and characteristics of rock mass which were obtained by RMR and TSP measurement, coincides with the prior studies. This kind of evaluation is expected to be used to design TBM tunnelling and to help to perform the TBM operation effectively

Case Study on the Tunnel Collapse at the Shallow Depth (NATM터널 저토피 구간에서의 막장붕락 사례연구)

  • Baek Ki-Hyun;Roh Jong-Ryun;Kim Yong-Il;Cho Sang-Kook;Hwang Nag-Youn
    • Tunnel and Underground Space
    • /
    • v.15 no.2 s.55
    • /
    • pp.102-110
    • /
    • 2005
  • ○ ○ tunnel that is located at Iksan - Jangsu freeway ○ ○, has collapsed during construction at the valley with shallow depth. Although, the site investigations, such as TSP, drilling exploration and so of indicated the presence of discontinuities in this section. The RMR was upgraded and the construction were carried out because that not only actual rock qualities were relatively good during construction but also the tunnel foe was stabilized. However, the tunnel was collapsed at the same time blasting of full face, and surface and underground water was infiltrated due to the settlement of the upper part of the tunnel face. To restore the collapsed section, 3-d tunnel stability analysis was performed and suitable reinforcement methods were chosen. The cavity of the upper tunnel face was stabilized by means of UAM and ALC injection. And the settlement was restored using L.W grouting method.

Characteristics of Subsidence of a Road During the New Tubular Roof Construction Around a Shallow Tunnel (저심도 터널주변의 NTR보강 중 발생한 도로면 침하의 특성)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.620-634
    • /
    • 2018
  • The NTR(New Tubular Roof) method was used to secure the stability of the tunnel and minimize the subsidence of the road. The tunnel was constructed at about 7.5 meters deep below the highway. with a width of about 21 meters. Following the NTR method, 13 steel pipes with a diameter of 2.3 meters were digged and pushed in longitudinally along the tunnel profile and cut out sides of pipes to connect to adjacent pipes, then filled the inside of pipes and the connected space between pipes with concrete to complete the lining of the tunnel to be excavated. As the steel pipes were digged in sequentially, the area of relaxation was connected to each other and behaves like a gradually widening tunnel. When the steel pipes were digged in to the widest points of the tunnel, the settlement rate of the road surface was increasing to the maximum as 2.2 mm and the total settlement until the lining construction was approximately 7.7 mm. After that, by excavating a tunnel inside the pre-installed lining, an additional settlement of about 4.3 mm was occurred, resulting in the total settlement of about 11.8 mm after completing of tunnel construction.

Consideration of Speed Camera for Controling Road Traffic Noise (과속 단속카메라의 고속도로 소음저감대책 적용 효과 검토)

  • Kim, Chulhwan;Choi, Yoonhyeock;Chang, Taesun;Kim, Deuk Sung
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.868-869
    • /
    • 2014
  • 고속도로 주변에 공동주택이 건설되면서 도로소음에 의한 민원이 크게 증가하고 있다. 이러한 민원에 대한 소음대책 방법으로 방음벽이 주로 사용되고 있지만, 공동주택이 고층화 되어감에 따라 방음벽만으로는 대책이 어려운 경우가 자주 발생하고 있다. 이에 따라, 최근에는 방음터널, 저소음포장, 과속 단속카메라 등이 소음대책 방법으로 제안되고 있고, 본 연구에서는 과속 단속카메라의 소음저감효과에 대해 분석하고 평가하였다.

  • PDF

A study on development of fog dissipating system using dry air (건조공기를 이용한 안개 소산 시스템 개발에 대한 연구)

  • Lee, Yong-Ku;Choi, Jun-Seong
    • Proceedings of the KAIS Fall Conference
    • /
    • 2011.05a
    • /
    • pp.276-279
    • /
    • 2011
  • 본 논문에서는 고속도로 대형 추돌사고의 원인이 되는 안개로 인한 시정거리 악화를 개선하기 위한 방법으로 염화칼슘 연소탄, 초미립자 살포기, 강풍기, 건조공기 등을 이용한 안개소산 시스템에 대한 연구를 수행하였다. 국내 환경에 적합한 안개소산 시스템을 개발하기 위해 다양한 안개소산 방법에 대한 현장 성능실험을 통해 검증하였고 강풍기와 열풍기를 결합하여 생성한 건조공기를 통해 공기중의 상대습도를 떨어뜨려 안개를 소산하는 방식이 시정거리 개선효과가 우수하였으며 이를 통해 고속도로 및 터널의 출입구 등 안개 발생으로 운전자의 시정거리가 낮아져 발생하는 사고를 미연에 방지할 수 있을 것으로 기대된다.

  • PDF

Stability analysis of an existing utility tunnel due to the excavation of a divergence tunnel emerging from double-deck tunnel (복층터널의 분기터널 굴착에 따른 지하 공동구의 안정성 분석)

  • Nam, Kyoung-Min;Choi, Min-ki;Kim, Jung-Joo;Jafri, Turab H.;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.231-248
    • /
    • 2017
  • Government plans to construct a double-deck tunnel under a portion of Gyeongbu Expressway that will solve traffic problems and could also be used as a flood storage facility. Divergence tunnels connect the main tunnel to the urban areas and their construction effects on adjacent structures at shallow depth need to be analyzed. This study primarily includes the numerical analysis of construction effects of divergence tunnels on utility tunnels. The utility tunnel was analyzed for three cases of volume loss applied to the divergence tunnel and two cases of the angle between main tunnel and divergence tunnel ($36^{\circ}$ and $45^{\circ}$). The results show that the more the volume loss was applied and the shorter the distance was between utility tunnel and divergence tunnel, the more the utility tunnel was affected in terms of induced displacements, angular displacement and stability. The worst scenario was found out to be the one where the angle between main tunnel and divergence tunnel was $36^{\circ}$ and the distance between divergence tunnel and utility tunnel was 10 m, resulting in the largest displacement and differential settlement at the bottom of the utility tunnel. A relationship between the angular displacement and the distance to diameter ratio was also established.

Fire resistance assessment of segment lining with PP fiber amount (PP섬유 혼입량에 따른 세그먼트 라이닝의 화재저항성 평가)

  • Choi, Soon-Wook;Kang, Tae-Ho;Lee, Chulho;Kim, Hae Song;Ahn, Byoungcheol;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.303-314
    • /
    • 2021
  • With the high quality/high stiffness/high strength of segment lining, segment lining is increasingly used as the final lining of the tunnel. Precast concrete lining has higher quality and strength than field concrete. Paradoxically, this contributes to greater damage to concrete in the event of a fire in a tunnel. In this study, tests were conducted to determine the fire resistance performance of segment linings according to fiber content in fire resistance methods using synthetic fibers such as PP fibers. As a result, it was confirmed that fire resistance performance required by the relevant project can be secured when using 1.5 kg/m3 of PP fiber. In addition, comparison of the results of PP fibers with PET, a similar synthetic fiber, showed better fire resistance performance than when PP fibers were used.

Analyzing drivers' visual response variation in very long expressway tunnel ; the Yuksimnyeong tunnel (장대터널에서의 운전자 시각각성변화 분석연구 (육십령터널을 대상으로))

  • Kim, Ju-Yeong;Kim, Hyeon-Jin;Jang, Myeong-Sun
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.1
    • /
    • pp.17-25
    • /
    • 2009
  • This research analyzed the changes of drivers' visual workload with beta wave of bionic signals from brain's occipital lobe from entrance to exit section of the Yuksimnyeong tunnel which is 3.1km long in Daejeon-Tongyeong section of Jungbu expressway. There are 10 subjects who Participate our experiments and the results are as follows. First. the drivers' visual workload is higher about 41% in entrance section of the tunnel than 200m in advance of the section of the tunnel. Second, it is higher than 200m in advance of the section of the tunnel by 34.5% that the value of the drivers' visual workload who is driving in the tunnel. Third, as a result of analyzing the tunnel into 200m unit section, it is statistically different from other sections' at the 1.0km and 2.4km section from the entrance of the tunnel. If drivers sustain average visual workload for safe driving in very long tunnel, it's not desirable environment that drivers' visual workload goes under the average workload. Therefore, it would be the section where drivers who is driving in tunnel could cause a traffic accident.

Performance of Feature-based Stitching Algorithms for Multiple Images Captured by Tunnel Scanning System (터널 스캐닝 다중 촬영 영상의 특징점 기반 접합 알고리즘 성능평가)

  • Lee, Tae-Hee;Park, Jin-Tae;Lee, Seung-Hun;Park, Sin-Zeon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.5
    • /
    • pp.30-42
    • /
    • 2022
  • Due to the increase in construction of tunnels, the burdens of maintenance works for tunnel structures have been increasing in Korea. In addition, the increase of traffic volume and aging of materials also threatens the safety of tunnel facilities, therefore, maintenance costs are expected to increase significantly in the future. Accordingly, automated condition assessment technologies like image-based tunnel scanning system for inspection and diagnosis of tunnel facilities have been proposed. For image-based tunnel scanning system, it is key to create a planar image through stitching of multiple images captured by tunnel scanning system. In this study, performance of feature-based stitching algorithms suitable for stitching tunnel scanning images was evaluated. In order to find a suitable algorithm SIFT, ORB, and BRISK are compared. The performance of the proposed algorithm was determined by the number of feature extraction, calculation speed, accuracy of feature matching, and image stitching result. As for stitching performance, SIFT algorithm was the best in all parts of tunnel image. ORB and BRISK also showed satisfactory performance and short calculation time. SIFT can be used to generate precise planar images. ORB and BRISK also showed satisfactory stitching results, confirming the possibility of being used when real-time stitching is required.