• Title/Summary/Keyword: 고속도로공사

Search Result 243, Processing Time 0.023 seconds

Parameter Estimation & Validation of Volume-delay Function based on Traffic Survey Data (교통조사를 통한 도로통행비용함수 구축 및 검증)

  • Kim, Ju-Yeong;Chu, Sang-Ho;Gang, Min-Gu;Heo, Heon
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.1
    • /
    • pp.115-124
    • /
    • 2010
  • VDF(volume-delay function) is one of the most important factor to improve the reliability of traffic demand estimation because it is for estimation of link travel time based on the traffic volume variation. Because VDF of link except for freeway is applied as the parameter of BPR(bureau of public road) of U.S., it causes to deteriorate the accuracy of traffic demand estimation. The purpose of this paper is to establish new parameter of VDF based on the real-surveyed traffic data in order to improve the problem of the existing VDF. We suggest the reclassification of road hierarchy, the approach of traffic survey, the estimating method of VDF parameter, and the improvements of new VDF application. The new VDF allows us to estimate more realistic traffic situation in parts of demand, travel time and path between origin-destination.

A Case Study of Tunnel Stability due to the Shallow Shaft and Change Penetrating Location (터널 갱구부 저토피 및 관통부 변경에 따른 안정성 검토 사례 연구)

  • Lee, Saik;Choi, Youngchul;Jung, Wooyong;Kim, Kookhan;Kim, Dongin
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.87-98
    • /
    • 2013
  • Around 70% of Korea is mountainous, an increase in tunnel construction. It's due to the growing interest of the public for the environment and land required for the road construction is very scarce. During construction of 'Daedong 1 tunnel' in the expressway expansion project between Naengjeong and Busan, there are shallow shaft due to this tunnel located in the valley and the shafts are separated, and penetrating location change was inevitable for construction was delayed because of complaint. So, we change the position of the penetrating by applying multi-channel TSP, and conducted a stability analysis. The analysis results showed that there is no problem on the stability of the tunnel. To secure the construction of additional stability, We installed instrument, performed mechanical excavation, added reinforcement at shallow shaft and conducted bench cut.

An Extensive View on the Highway Network in North Korea and the Determination of Investment Priority Using AHP Analysis (북한의 고속도로 전망 및 AHP기법을 활용한 투자우선순위 결정)

  • Man, Seol-Young;Cho, Yun-Ho
    • Land and Housing Review
    • /
    • v.2 no.2
    • /
    • pp.171-182
    • /
    • 2011
  • Current state of population, the existing roads, and the function of roads and highways of North Korea have been reviewed in this paper. In addition, the 'Five by five' road network has proposed for North-South and East-West directions to be connected with the road network of South Korea, China, and Asian Highways. Furthermore, the evaluation criteria and weighted values have suggested to determine the investment priority of highway based on the survey results from expert group members using AHP analysis method. Throughout the analysis, the ranking of the investment priority has been decided for the North-South axis and East-West axis. The second North-South axis (Geasung-Pyungyang-Anju-China) has been ranked as the first priority for the North-South axis followed by the fifth North-South axis as the second, the first axis as the third, the third axis as the fourth and the fourth axis as the last priority. For the East-West axis, the second East-West axis(Nampo-Pyungyang-Wonsan) has been ranked as the first priority followed by the first axis as the second, the third axis as the third, the fourth axis as the fourth and the fifth East-West axis as the last priority.

Research on the Residential Environment of New Town & Surrounding Area (대규모 신도시 및 주변지역 거주환경 비교분석 연구)

  • Cho, Young-Tae;Seong, Jang-Hwan
    • Land and Housing Review
    • /
    • v.2 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • During the 1990's, five new towns were constructed around Seoul such as Bun-Dang and Il-San. These new towns are very popular since they were created based on systemic urban planning and they provide various residential amenities. Many people consider them livable cities. Taking such advantages, other small-scale new public and private developments continued around those new towns and consequently created 'agglomerated region with new development'. The most representative area is Bun-Dang and north-western Yong-In area which are formed along the Seoul-Busan expressway. This area is a mega-community having more than one million residents in 2005.Judging from recent development trends in the Seoul metropolitan area, it is expected that the formation of other 'agglomerated region with new development' would be continued for the time being. This study is aimed to analyze the residential environment of Bun-Dang and north-western Yong-In and find implications to the management of 'agglomerated region with new development'. The relevant existing studies have their limits, only focusing on analyzing current conditions and pointing out current problems. This study could be differentiated from the existing analyses in that it conducted comprehensive analyses on various factors that constitute urban residential environment. The conclusion of this study was derived from diverse analyses of current development condition, residential sites, regional transportation, awareness of residents, and oversee cases.

A Field Construction of PSC Girders with 60MPa Cast-in-Place High-Strength Concrete (60MPa급 현장 타설 고강도 PSC 거더의 시험 시공)

  • Min, Kyung-Hwan;Yang, Jun-Mo;Cheong, Hai-Moon;Ahn, Tae-Song;Yoon, Young-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.405-408
    • /
    • 2008
  • The most effective factors that improve sections and elongate spans of the prestressed concrete girders are shapes of sections and strengths of concretes, and the concrete strength is more influenced to enhance the allowable tensile strength on top and bottom fibers than increasing of flexural strength of girders. In this study, 60 MPa high-strength prestressed concretes were constructed at the Wonsoo Bridge where in the 1st section of expanding constructions of the Nonsan to Junjoo Expressway, the high-strength concrete was placed on the eight- 35 meters simple span IPC girders of four lanes of Nonsan direction. During casting of girder concretes, quality controls were carried out with continuing controls of surface moistures and corrections of the unit water using the air-meter methods right after batching. It was confirmed that compressive strengths of girder concretes ensure the target strength and the heat of hydrations of girder concrete were measured. Though using same materials and constructing methods, there're a wide range of strengths of each girder, so, when high-strength concretes cast in the place hereafter, a countermove should be prepared.

  • PDF

A Prediction Model of Resilient Modulus for Recycled Crushed-Rock-Soil-Mixture (재활용 암버력 - 토사의 회복탄성계수 예측 모델)

  • Park, In-Beom;Mok, Young-Jin
    • International Journal of Highway Engineering
    • /
    • v.12 no.4
    • /
    • pp.147-155
    • /
    • 2010
  • A prediction model of resilient modulus($E_R$) was developed for recycled crushed-rock-soil mixtures. The evaluation of $E_R$, using the "orthodox" repeated loading tri-axial test, is not feasible for such a large-size gravelly material. An alternative method was proposed hereby using the subtle different modulus called nonlinear dynamic modulus. The prediction model was developed by utilizing in-situ measured shear modulus($G_{max}$) and its reduction curves of modeled materials using the large free-free resonant column test. A pilot evaluation of the model parameters was carried out for recycled crushed-rock-soil-mixture at a highway construction site near Gimcheon, Korea. The values of the model parameters($A_E,\;n_E,\;{\varepsilon}_r\;and\;{\alpha}$) were proposed as 9618, 0.47, 0.0135, and 0.8, respectively.

Development of An Adaptive Route Guidance Strategy under Non-recurrent Traffic Congestion (돌발적 교통혼잡하에서 적응형 경로 안내 전략의 수립 및 평가에 관한 연구)

  • 이상건
    • Journal of Korean Society of Transportation
    • /
    • v.15 no.1
    • /
    • pp.175-192
    • /
    • 1997
  • 첨단 교통정보 시스템(ATIS)의 핵심요소라고 할 수 있는 동적경로안내 시스템 (Dynamic Route Guidance System)은 운전자가 목적지에 도착하기까지 실시간 교통정보를 토대로 최적경로를 안내해줌으로써 날로 심화되고 있는 교통혼잡을 최소화 할 수 있으리라 기대를 모으고 있다. 특히 교통사고나 긴급 도로공사 등으로 인해 발생하는 돌발적 교통혼잡하에서는 DRGS의 역할이 더욱 커질 것으로 예상되고 있다. 본 논문은 돌발적 교통혼잡하에서 보다 효과적인 DRGS의 경로안내 전략을 수립하고 평가하는데 그 목적이 있다. 이를 위해 우선 하부구조기반 DRGS와 개인차량기반 DRGS의 장단점을 비교하고 시스템 아키텍쳐와 경로안내전략의 관계를 규명하였다. 또한 효율적인 경로안내를 위해 사용자평형 (User Equilibrium) 경로안내전략과 시스템 최적화(System Optimal) 경로안내 전략을 이상형교통망 (Idealized Network)을 통해 비교 분석하였다. 그리고 돌발적 교통 혼잡하에서 사용자평형 경로 안내를 사용할 경우 야기될 수 있는 Braess Paradox 문제와 시스템 최적경로안내를 사용할 경우 일어날 수 있는 사용자 호응도(User Compliance) 문제를 동시에 감안한 적응 형 경로안내 전략을 개발하였다. 이 방법은 위의 경로 안내 전략들이 가지고 있는 장단점을 상황에 따라 평가하여 경로안내 전략을 선택하는 과정을 수행시간을 절약하지 못할 것으로 평가되면 사용자 호응도를 고려하여 사용자 평형 전략을 선택하도록 하였다. 돌발적 교통 혼잡하에서 통행 시간을 동적으로 예측하기 위해서는 이산 확정적 대기행렬모형 (Discrete Deterministic Queueing Model)이 적용되었다. 한편, 적응형 전략의 효율성을 평가하기 위 해 이상형교통망과 실제 미국 Virginia 주의 Fairfax Country에 소재한 주간 고속도로 66번 과 인접 교통망을 대상으로 각종 돌발교통혼잡상황을 전제로 한 Traffic Simulation과 정보 제공 시나리오를 INTEGRATION Model을 사용하여 실행하였다. 그 결과 적응형전략이 단지 사용자평형 경로안내전략만 사용하는 경우에 비해 교통 혼잡도와 유고상황의 체류정도에 따라 3%에서 10%정도까지 전체통행시간을 절약할 수 있다는 결론을 얻었다.

  • PDF

Analysis of Characteristics and Removal Efficiency of Road-deposited Sediment on Highway by Road Sweeping According to Particle Size Distribution (고속도로 노면퇴적물의 특성 및 도로청소에 의한 입도별 제거효율 분석)

  • Kang, Heeman;Kim, Hwang Hee;Jeon, Ji-Hong
    • Journal of Korean Society on Water Environment
    • /
    • v.37 no.4
    • /
    • pp.286-295
    • /
    • 2021
  • The removal efficiency of road-deposited sediment (SDR) by road sweeping was analyzed by performing particle size analysis before and after road sweeping at four highways during May to December 2019. The SDR accounted for the largest proportion in the range of 250 to 850 ㎛ and the degree of its proportion had an effect on the particle size distribution curve. The particle size distribution of the collected sediments showed a similar distribution at all sites. Below 75 ㎛, the removal efficiency of SDR showed a constant value around 40%, but above 75 ㎛, it increased as the particle size increased. The removal efficiency was 82-90% (average 86%) for gravel, 66-93% (average 79%) for coarse sand, 35-92% (average 64%) for fine sand, 29-69% (average 44%) for very fine sand, 19-58% (average 40%) for silt loading, 10-59% (average 40%) for TSP, 13-57% (average 40%) for PM10, and 15-61% (average 38%) for PM2.5. SDR removal efficiency showed an average of 69% for the four highways. It was found that if the amount of SDR was less than 100 g/m2, it was affected by the road surface condition and had a large regional deviation. As such, the amount of SDR and the removal efficiency increased. The fine particles, which have relatively low removal efficiency, contained a large amount of pollutants, which is an important factor in water and air pollution. Therefore, various measures to improve the removal efficiency of fine particles in SDR by road sweeping are needed.

Experimental Study for Weed Control on the Shoulder of Expressway (고속도로 길어깨 구간의 잡초발생 억제 시험에 관한 연구)

  • Park, Jong-Chul;Jeon, Gi-Seong;Hur, Young-Jin;Kim, Kyung-Hoon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.23 no.6
    • /
    • pp.43-55
    • /
    • 2020
  • The study was performed in order to derive the management methods of revegetation space on embankment upper in the shoulder of expressway. The pilot study was conducted in 2013 on the test road section of the Jungbu Inland Expressway (Smart Highway) and continues to be monitored until 2020. In the test, three commonly used methods for weed control were applied. In the early two to three years, most of the methods were effective in controlling weeds. However, at the end of six years, weed suppression effects were different for each treatment. Vegetation coverage was 90% in the untreated control, 70-80% wood chip mulching method, 50-60% solidification method, and 20% sheet mulching method. The sheet method was found to be the most effective given the low vegetation coverage was effective in controlling weeds. The wood chip mulching method is promoting weed growth over time, and weeds are invading as the effect of soil hardening is reduced in the place where the soil hardener is treated. Among the methods applied in the test, mulching the sheet is the most effective, but it is important to use a durable sheet. In the future, it is necessary to find ways to control weeds on road shoulders, considering both economic and environmental aspects. For the proper management in the shoulder of expressway set target zone is needed. Clear standards for weed control on expressway should be established. And the technology to be applied must be durable for 3 years or more and must be able to suppress the amount of weeds to a level of 20% or less.

Tracing the Distribution of Deicer around Highway Areas using Sodium Adsorption Ratio (SAR) of Soil (고속도로 주변 토양의 나트륨흡착비(SAR)를 이용한 제설제 분포 추적)

  • Cho, Sunghyen;Lee, Dongguen;Shin, Gunhwan;Choi, Cheonil;Lee, Goontaek;Kim, Dosoon;Lee, Byeongduk
    • Journal of Soil and Groundwater Environment
    • /
    • v.27 no.3
    • /
    • pp.22-40
    • /
    • 2022
  • The goal of this study was to estimate the possible scattering distance of deicer from the highway and the impact range of deicer on soil quality in terms of plant growth. Among the major elements (Ca2+, Cl- and Na+) of deicer, Ca2+and Cl- are usually applied as fertilizer to soil. Therefore both elements (Ca2+and Cl-) were not appropriate for a tracer of deicer at the agricultural area. In this study, SAR (sodium adsorption ratio) of soil was proposed as an alternative tracer to confirm the distribution of the deicer around the highway areas. Because deicer is the main anthropogenic source of Na+ around the highway areas and does harm to the physical properties of soil and plant growth through the destruction of soil aggregate, SAR would be an recommendable tracer to access the distribution of deicer as well as adverse effect on soil quality at highway areas. The influence range of deicer based on SAR of soil was estimated to be less than 20 m distance from the highway even though the possible flying distance of deicer was found to be more than 100 m from the highway. However the deicer seriously deposited within 10 m from the highway.