Development of underground facility information collection technology based on 3D precision exploration (3차원 정밀탐사 지하시설물 정보 수집 기술 개발)

  • Jisong RYU;Yonggu JANG
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.26 no.4
    • /
    • pp.56-66
    • /
    • 2023
  • Safety accidents are increasing, such as changes in groundwater levels due to construction work or natural influences, or ground cave-ins caused by soil runoff from old water supply and sewage pipes. In addition, underground facility management agencies must make efforts to improve the accuracy of underground information through continuous investigation and exploration in accordance with the Special Act on Enhanced Underground Safety Management. Accordingly, in this study, we defined the configuration of equipment and data processing method to collect 3D precise exploration underground facility information and developed 3D underground facility information collection technology to ensure accuracy of underground facilities. As a result of verifying the developed technology, the horizontal accuracy improved by an average of 6cm compared to the existing method, making it possible to acquire 3D underground facility information within the error range of the public survey work regulations.

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

Passenger Car Equivalents of Various Vehicle Types on Expressway Work Zones (고속도로 공사구간에서의 차종별 승용차환산계수)

  • 강승규
    • Journal of Korean Society of Transportation
    • /
    • v.14 no.3
    • /
    • pp.61-73
    • /
    • 1996
  • The objective of this paper is to estimate the PCE(Passenger Car Equivalents) of various vehicle types on expressway work zones. Headway samples of 5,359 vehicles were collected in 6 work zones in the Kyungbu Expressway between September and November of 1995. Average headways of 8 vehicle types based on the vehicle classification method of the Department of Construction and Transportation were calculated. A statistical test of effects of the types of the preceding vehicles were performed for the average headways between a vehicle type preceded by other vehicle types. The results show that the effects of the type of preceding vehicles are significant (exceeded 5% and 10% significance levels) and the PCEs of heavy vehicles on expressway work zones are higher than that of basic expressway section. Therefore, different adjustment factors should be applied for heavy vehicles in estimating saturation flow rates of expressway work zones. The study also derives an equation to determine PCEs of these vehicle types.

  • PDF

A Study on Level-of-Service Changes of Expressway in Accordance with the Revision of Traffic Capacity at Work-Zone (교통용량 개정에 따른 고속도로 공사구간의 서비스 수준에 대한 연구)

  • Ryu, SungWoo;Park, Kwon-Jea;Han, SeungHwan;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.16 no.3
    • /
    • pp.109-117
    • /
    • 2014
  • PURPOSES : This study analyzes the available working time at work-zone on the Expressway in accordance to the new capacity manual. METHODS : Sensitivity analysis on variables were conducted to calculate the adjusted capacity at work-zone based on previous researches. RESULTS : The main factors which affect available working time at the work-zone were its capacity, number of lanes, terrain and lane width. Other factors have minimal effect on the available working time. Based on the analysis, a calendar of lane closures was suggested. CONCLUSIONS : A series of studies concluded that the capacity at work-zone in the new capacity manual reduced to 76-82% of the existing manual. As such, the available working time decreased. Furthermore, the factors affecting the available working time needs to be considered when making a plan to rehabilitate the distressed pavement.

Repair of Seonjingang Bridge in Namhae Highway Route Deteriorated by Chloride Attack (남해고속도로 섬진강교 내염보수공사 시공)

  • Han Bog Kyu;Chi Han Sang;Cheong Hai Moon;Ahn Tae Song
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.355-358
    • /
    • 2005
  • Corrosion of reinforced concrete structures in marine environment is one of the most important mechanisms of deterioration. Under Korean highway bridge, the time for the steel reinforcement in the concrete to exhibit initial signs of corrosion is within three decades. Therefore, 'SUM JIN' highway bridge, located in a corrosive marine environment on the south of Korea, had been examined the current condition of the steel reinforcement corrosion in concrete by half-cell potentials, chloride contamination of concrete and so on. According to the tests, the protecting film around the reinforcement is deteriorated and corrosion activity developed in tidal zone. The purpose of this paper is to report the effects of 'SUM JIN' highway bridge damaged by chlodide attack and to present the results of repair of 'SUM JIN' highway concrete bridge in domestic marine environment.

  • PDF

A Study on the Traffic Flow Characteristic Analysis and Applicability of Work Zones (도로 공사중의 교통류 특성분석과 적용성에 관한 연구 -고속도로를 중심으로-)

  • Lim, Chae-Moon;Lee, Ju-Ho;Lee, Young-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.5 no.4
    • /
    • pp.329-337
    • /
    • 2002
  • It is the actual condition that the increasing traffic delay and accident caused by inefficient management on various construction by occupying the roadways. Since almost roadway improvements are for the public convenient, negative effects by them are ignored. But now due to the increase of traffics demand and limitation of road supply, the positive management scheme and treatment plan on the constructions must be considered. Thus, to the extent of this study divides uninterrupted flow into freeways and the Highway, yielding the time spread between under construction and not, that is delay time, we build capacity and delay model in the change of traffic volume and occupying length.

  • PDF

Results of Fatigue Test of Lead Rubber Bearing (지진격리장치(LRB)의 피로시험 결과)

  • 이민구;강형택;유환구
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.03a
    • /
    • pp.442-448
    • /
    • 2003
  • 최근 장대교량의 건설이 증가하고 지진에 대한 관심이 고조되면서 교략의 내진설계와 면진설계가 교량설계의 주요항목으로 자리잡게 되었다. 특히 최근 ILM교량과 같은 다경간 장대교의 경우 지진시 교량의 상부구조와 하부구조를 격리시켜 주기를 변화시키는 LRB를 이용한 면진설계가 주로 이루어지고 있다. 그러나 아직까지 국내에는 Mt5의 거동과 기본성능에 대한 실험데이터가 절대적으로 부족하며, 따라서 그 특성을 엄밀히 검증하지 못한 채 고속도로 및 국도상의 교량에 LRB를 다수 사용하고 있는 현실이다. 본 연구에서는 실교량에 사용될 LRB에 대하여 기본성능 중의 하나인 피로마모시험을 수행함으로써 온도하중과 같은 반복하중에 대한 LRB의 피로거동을 모사하고 피로시험 전.후의 기본성능의 변화를 파악하였다. 이러한 LRB의 기본성능에 대한 실험온 LRB의 성능에 대한 검증과 함께 LRB의 거동에 대한 불확실성을 줄일 수 있는 기본 자료로 축적할 수 있으며, 현재 한국도로공사 도로교통기술원에서 마련중인 지진격리장치(LRB) 성능시험기준(안)의 정립에 기초 자료로참고하고자 한다.

  • PDF

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume (BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용)

  • Jung, Guk-Young;Woo, Jeong-Won;Kang, Kyeong-Don;Shin, Jae-Choul
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

An Expressway Path Travel Time Estimation Using Hi-pass DSRC Off-Line Travel Data (하이패스 DSRC 자료를 활용한 고속도로 오프라인 경로통행시간 추정기법 개발)

  • Shim, Sangwoo;Choi, Keechoo;Lee, Sangsoo;NamKoong, Seong J.
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.3
    • /
    • pp.45-54
    • /
    • 2013
  • Korea Expressway Corporation has been utilizing vehicles equipped with dedicated short range communication (DSRC) based on-board equipment (OBE) for collecting path travel times. A path based method (PBM) estimates the path travel time using probe vehicles traveling whole links on the path, so it is not always possible to obtain sufficient samples for calculating path travel time in the DSRC system. Having this problem in utilizing DSRC for travel time information, this study attempted to estimate path travel time with the help of a link based method (LBM) and examined whether the LBM can be used for obtaining reliable path travel times. Some comparisons were made and identified that the MAPE difference between the LBM and the PBM estimates are less than 3%, signaling that LBM can be used as a proxy for PBM in case of sparse sample conditions. Some limitations and a future research agenda have also been proposed.

Feasibility Study the Assessment Factor of Quality Performance Index in Expressway Concrete Pavement (고속도로 콘크리트 포장에 대한 품질평가지수 평가인자의 적정성 검토)

  • Lee, Seung Woo;Kim, Gyung il;Ko, Dong Sig;Hong, Seung Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.133-141
    • /
    • 2017
  • Traffic volume increases according to highway expansion and industrial development which causes repetitive defect and durability degradation on pavement. The research of quality assurance system used abroad has introduced Korea. Korea Expressway Corporation (KEC) has developed a Quality Performance Index (QPI) that quantitatively assesses the level of quality of the final product, and practical applications. Assessment factor on concrete pavement consisted of pavement thickness, compressive strength, IRI and spacing factor. Assessment factor on concrete pavement is determined by empirical evaluation factor from abroad. In this study, analysis of evaluation factors of concrete pavement by using pavement life prediction simulation and measured data were evaluated with consideration of feasibility of the assessment factor. Pavement life, performance and durability are affected by pavement thickness, compressive strength, IRI and spacing factor in assessment factor on concrete pavement, QPI.