• Title/Summary/Keyword: 계약금액의 합리적 조정

Search Result 4, Processing Time 0.017 seconds

The Rationalization of Contract Sum Adjustment through Case Study of Price Fluctuation Adjustment based on Index Adjustment Method (물가변동조정 사례분석을 통한 지수조정방법기반 계약금액조정 합리화방안)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.70-78
    • /
    • 2011
  • In case of long time progressive construction work, we need contract sum adjustment due to escalation for a period of works and the process of applying, consistent and obvious criterion is required. In this study, it were attempted to figure out problem and study this rational improvement by giving examples based on core activities of escalation adjustment. Based on literature study and legal system analysis, we classified processes of contract sum adjustment for escalation and defined 20 core activities for each process. From this measured variable, we carried out case study by giving 37 examples of escalation. As a result of case study, problems of each process was found and we suggested rational improvement. As this study, providers will be able to waste budget and the other will be given smooth escalation adjustment.

A Study on Recoverability of Opportunity Profits Loss upon Time-Delay in Construction Contract (건설공사의 공기지연과 기회이익의 손실보전에 관한 연구)

  • Chun Jae-Youl;Lee Kyung-Kook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.359-364
    • /
    • 2003
  • The loss of potential opportunity profit which is consisting in the partial markups of the corporation would taking placed in related with the time-delay deeply, has customarily disregarded in contract adjustment under the principles of denial of cost accounting method, declined conjecture in the point of benefits and protection of the law in scope of compensation and the restricted conditions of constant contract. It is being resulted from that the policies of the general principles of accounting standards which is subjected to ask an objective data and evidence, and the denial system as a debt derived from imperfect legal theory applied by current law. Therefore, it is necessitated to find if any irrationality in the positive system is and further to draw an improved reasonable measures to adopt by review of constant system preparing tile reasonableness with the method of suitable quantification devices provided that any time-delay is induced by the party.

  • PDF

The Rationalization through Comparative Analysis of Price Fluctuation Adjustment Method (물가변동 조정방법의 비교분석을 통한 합리화 방안)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.67-76
    • /
    • 2012
  • There are index adjustment method and item adjustment method in estimation methods for price fluctuation rate of public constructions. A relevant regulation has put item adjustment method as a principle, but in most construction, contract sum adjustment has been made by index adjustment method. Hence, this study, by figuring out width and causes of the gap between index adjustment method and item adjustment method through direct comparative analysis, solved inequality caused by difference between them and suggested a rational way against irrationality of each method. For building operations of public housing construction, a detailed fluctuation rate by index adjustment method and item adjustment method of construction cost elements of the same construction, that is, direct material cost, direct labor cost and historical construction cost was estimated to analyze difference between two adjustments and establish its cause. Across the analysis, it was found that fluctuation rate by item adjustment method was estimated lower than that by index adjustment method and difference between methods for estimating fluctuation rate of quotation unit price and application of index unrelated to construction type and construction nature are main causes of the difference. This study has a significance in that, for smooth contract sum adjustment between contracting parties, it practically proved the real difference between adjustment methods by conducting comparative analysis of the difference in direct correspondence way.

Economic Welfare Study on Seasonal and Time Period Electricity Pricing (계시별 전력가격에 대한 경제적 후생 연구)

  • Yoo, Young-Hoon;Kim, SungSoo
    • Environmental and Resource Economics Review
    • /
    • v.14 no.2
    • /
    • pp.519-547
    • /
    • 2005
  • The aim of this study is to analysis how economic welfare lost happens within the present korea seasonal and time period electricity pricing system and find out reasonable electricity price system acceptable during the transitional period of korea electricity industry restructuring To analyze economic welfare lost in the electricity industry, in advance seasonal and time periodic 9 demand curves(summer, spring &fall, winter/peak-load time, middle-load time, low-load time) and one market supply curve are made and then using these demand and supply curve, seasonal and time periodic market equilibrium prices is calculated. Finally, comparing these market equilibrium prices with present regulated classified seasonal and time periodic prices, the whole economic welfare lost in the electricity industry is calculated. The result of this study shows that in 2002, the total economic welfare lost in electricity industry is 137,770 million Won and under present price system, the worst welfare lost is happening seasonally in spring & fall, time periodically in the middle-load time. Specifically analyzing the characteristics of welfare lost, especially on the industry customers and service customers which are applied in seasonal and time periodic pricing, for the industry customers, the welfare lost calculated in this class occupies 51% of the total welfare lost in the whole electricity industry and the worst welfare lost is happening seasonally in spring & fall, time periodically in the middle-load time. For service customers, the welfare lost calculated in this class occupies 13% of the total welfare lost in the whole electricity industry and the worst welfare lost is happening seasonally in summer, time periodically in the peak time Finally, this study was made based on the year of 2002 and KEPCO has practiced two times of rate change until now. The result of rate change was positively analyzed in the direction of economic welfare improvement(welfare improvement achieved by 16.3% compared to 2002 result).

  • PDF