• Title/Summary/Keyword: 건축비용절감

Search Result 135, Processing Time 0.026 seconds

The study on Analysis of Influence factors on Items in Apartment House Maintenance Cost (공동주택 관리비 항목별 영향요인 분석 연구)

  • Lim, Nam-gi;Park, Chan-jeong;Jung, Sang-jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.1
    • /
    • pp.155-162
    • /
    • 2002
  • In this research, I finally came to a conclusion analyzing the connection among managing of each items in management expenses, the size of each complex and stories, and the term of using. (1) In the managing cost regarding to the management manner, although the managing cost of self-governing management is less imposed than the one of commission management, there is slight difference between those Costs. And it is more important to consider the effectiveness of management than to emphasize reduction of management cost. (2) The higher the stories, the higher the managing cost of elevator per the unit area. It Is caused by the fact that the father the distance of the elevator operating, the higher the electric charges. (3) The third of one of total management cost goes to pay the personnel expenses. So I found that the effective management of the expenses is available to reduce management cost. (4) The higher the stones, the lower the cost of personnel expenses including the cleaner cost. (5) The sum of costs assigned in repairment and management increases in proportion to the term of using. The costs assigned in special repairment and management are interacting to each other. (6) To reduce the management cost, we have to cut down the personnel in security guard that occupies one third of total management cost with application to the joint security system and operation of the self-governing guard. Through this process, it will be easy to accomplish the rationalization of contract with an outside order. Because the improvement of management service is not only the responsibility of owner but also the one of dwellers. And it Is imperative to realize the importance of cooperation and trust between the owner and dwellers. And the establishment of effective managing system which has convenience and rationality must be settled without delay.

Adjustment of Contract Price according to Introduction of Pay Adjustment (건설공사 지불규정제도 도입에 따른 공사비조정방안)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.175-180
    • /
    • 2010
  • Despite continuous efforts by the construction industry to achieve better quality, it doesn't seem that much has been improved. This is mainly because current specifications do not satisfy a change in the market environment, which is that a higher level of quality is now demanded by users. Quality improvement efforts have been satisfied merely to meet specifications. On the other hand, advanced countries have been experienced great success in their construction techniques and have reduced costs by introducing apay adjustment system to the construction industry, in which compensation is based on performance. Following their example, Koreashould introduce such a pay adjustment system in order to motivate the members of our construction industry to achieve better quality and a higher level of construction techniques. However, there has been a lack of a rational approach to the development of a system for cost coordination, as well as performance and quality inspection. Thus, in this study a legal and logical plan was developed that can be used to adjust the construction cost, along with the performance inspection of quality results, in order to introduce a pay adjustment system that is appropriate for domestic regulations.

Importance and Performance Analysis on Factors of PC Component Allocation and Loading Planning (IPA를 통한 PC부재 할당 및 적재 계획 시 고려사항 분석)

  • Jang, JunYoung;Cho, Kyeong Woon;Koo, Choongwan;Lee, Chansik;Kim, Taewan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.53-62
    • /
    • 2021
  • PC component allocation and loading plan can contribute to reductions in carbon dioxide emission and energy use of vehicles and total project costs with increased utilization of vehicle loading space. The study derived 18 considerations that PC construction plant managers and site managers take into account when they plan allocation and loading of PC components. Then, IPA (Importance and Performance Analysis) was performed to assess importance and performance of the 18 considerations. Results show that in the PC component allocation planning, considerations regarding the number of vehicles and existence of yard for storing PC components have not been taken into account well by the managers. In the PC component loading planning, PC component loading direction has not been reflected well by the managers although it is considered important by them. Recently, ill-planning issues of PC component transportation, such as inefficient use of vehicle space and loading with low stability, are frequent due to various types of PC components produced. In this context, if the results of this study are reflected in the development of component allocation and loading planning, vehicle management of PC projects would be more efficient, thereby leading to economic project management.

Status of Economics Analysis Using LCC in Turn-Key Project : Focus on Landscape Architecture (설계시공일괄발주(턴키) 설계에서 LCC를 활용한 경제성 분석 실태: 조경분야를 중심으로)

  • Yoon, Yong-Han;Kim, Jeong-Ho
    • Journal of Environmental Policy
    • /
    • v.10 no.4
    • /
    • pp.39-59
    • /
    • 2011
  • In this article, I would like to analyze the conditions in applying the LCC method for each construction type by selecting 10 apartment complexes among the Turn-key projects which have been ongoing for the last 5 years. In addition, this article will identify the problems to the application of double landscape architecture and suggest improvement measures. Among the 10 case targets, a total of 151 LCC analyses were conducted, and the average application ratio placing for each construction type was shown in the following order: architecture (34.4%)> electricity (21.2%)>machine (18.5%)>civil engineering (13.2%)>landscape architecture (12.6%). As numbers show, landscape architecture was the lowest. The ratio of LCC reduction amount was shown in the following order: machine (32.1%)> architecture (23.9%)>electricity (23.4%)>civil engineering (17.5%)>landscape architecture (3.1%). The field of landscape architecture had a reduction amount that was about 5 to 6 times lower than civil engineering which had a similar number of LCC analysis cases. The total LCC analysis items of landscape architecture was 19, including 15 double packing material, 1 building covering, 1 grass planting, 1 planting infrastructure, and 1 facility. The following measures were suggested to promote LCC analysis in landscape architecture: first, set an analysis item that considers the construction expense ratio of landscape architecture; second, legal regulation of landscape architecture and expansion of its application; third, prepare VE/LCC standards which are suitable for landscape architecture.

  • PDF

A Study on Energy Efficiency Improvement through Building Insulation Diagnosis (건축물 단열 진단을 통한 에너지 효율 개선에 관한 연구)

  • Cho, Kwangmoon
    • Journal of Internet of Things and Convergence
    • /
    • v.7 no.3
    • /
    • pp.9-14
    • /
    • 2021
  • This paper discovers the energy loss factors through the insulation diagnosis of houses or buildings, and proposes directions for energy efficiency improvement. The energy efficiency factor of a building consists of insulation diagnosis, thermal bridge diagnosis, window diagnosis, airtight diagnosis, and equipment diagnosis. Among the residents and facilities in the energy welfare blind spot, an energy efficiency diagnosis was conducted for one senior citizen building located in Naju-si, Jeollanam-do, and energy efficiency diagnosis was conducted after insulation was installed. Energy measurement, diagnosis and analysis were performed using the IoT-based integrated wired/wireless energy diagnosis platform, Energy Finder. As a result of comparison, an overall energy saving rate of 16.38% was achieved. Annual heating energy consumption per unit area decreased from 333.51kWh before construction to 277.35kWh after construction, and annual cooling energy consumption per unit area decreased from 5.51kWh before construction to 5.22kWh after construction. The annual primary energy consumption per unit area decreased from 464.52kWh before construction to 403.69kWh after construction, and the annual energy cost was reduced from 3,063,307.14 won before construction to 2,641,072.49 won after construction. The additional improvement work is needed on the standards affecting energy efficiency other than insulation.

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

Thermal Insulation and Flame Retardant Properties of Cement Based Super Light-weight Inorganic Thermal Insulation using 100㎛ Grade Glass Bubble (100㎛급 글라스 버블 혼입 시멘트계 초경량 무기 단열재의 단열 및 난연특성)

  • Son, Bae-Geun;Song, Hun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.4
    • /
    • pp.642-649
    • /
    • 2021
  • Energy saving standard for buildings are strengthened, the application of exterior insulation finishing system and thickness of insulation materials are increasing. Most buildings with exterior insulation finishing system is applied organic insulating material. Organic insulating material have workability, economic feasibility, reduction in construction cost, and excellent thermal insulation performance. However, Organic insulating material is very vulnerable to heat, so when a fire occurs, rapid fire spread and toxic gas are generated, causing many casualties. Inorganic insulating material can be non-combustible performance, but it is heavy and has low thermal insulation performance. Mineral wool has higher thermal insulation performance than other types of inorganic insulating material, but mineral wool is disadvantageous to workability and vulnerable to moisture. Glass bubble are highly resistant to water and chemically stable substances. In addition, the density of the glass bubble is very low and the particles are spherical, fluidity is improved by the ball bearing effect. Glass bubbles can be used with cement-based ino rganic insulating material to impro ve the weight and thermal insulatio n perfo rmance o f cement-based inorganic insulation. This study produced a inorganic insulating materials were manufactured using cement-based materials and glass bubble. In order to evaluate the insulation performance and flame retardant performance of cement-based super light-weight inorganic insulating materials using with glass bubble, insulation performance or flame retardant and non-combustible performance were evaluated after manufacturing insulating materials using micro cement and two types of glass bubbles. From the test result, Increasing the mixing ratio of glass bubbles improved the insulation performance of cement-based super light-weight inorganic insulating materials, and when the mixing ratio of glass bubbles was 10%, it sho wed sufficient flame retardant and no n-co mbustible perfo rmance.

A fundamental study on the minimize wear of slurry shield TBM sludge bend pipe (이수식 쉴드 TBM 배니곡관 마모 최소화를 위한 기초 연구)

  • Soo-Jin Lee;Hyeon-Do Kim;Yong-Woo Kim;Sang-Hwan Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.3
    • /
    • pp.243-254
    • /
    • 2024
  • Currently, due to industrial development in domestic regions, buildings are saturated not only in major city centers but also in surrounding urban areas. Accordingly, people's attention has focused on underground spaces, and tunnels are being widely used, especially in urban development. Research on tunnels and tunnel excavation methods is actively underway. However, there is a lack of research on the wear and tear problems of sludge discharge pipes when using a slurry shield TBM. Therefore, in this paper, the L-shaped bend pipe used in the existing sludge discharge pipe was transformed into a T-shaped bend pipe to move sludge. As a result, it was confirmed that compared to the L-shaped bend pipe, the impact of the T-shaped bend pipe on the bend pipe when discharging sludge was reduced. Based on these results, it is expected that wear of the sludge discharge pipe can be minimized by using a T-shaped bend pipe when using slurry shield TBM equipment. This is expected to ultimately lead to economic benefits, such as reducing costs due to replacement of curved pipes or additional welding during tunnel construction.

Heating Energy Saving and Cost Benefit Analysis According to Low-Income Energy Efficiency Treatment Program - Case Study for Low-Income Detached Houses Energy Efficiency Treatment Program (저소득층 에너지효율개선사업에 따른 난방에너지 절감 효과 및 경제성 분석 - 저소득층 단독주택 단열개선을 중심으로 -)

  • Kim, Jeong-Gook;Lee, Junghun;Jang, Cheolyong;Song, Doosam;Yoo, Seunghwan;Kim, Jonghun
    • KIEAE Journal
    • /
    • v.16 no.5
    • /
    • pp.39-45
    • /
    • 2016
  • Purpose: The purpose of this study is to analyze the energy saving and cost benefit analysis of the Low-income Energy Efficiency Treatment Program supported by KOREF(Korea Energy Foundation). This program was launched in 2007 and performs building energy retrofit for the low-income and energy poverty houses. Method: Energy simulation and cost benefit analysis were accomplished for the low-income detached houses. The structure of detached house was a lot og block structure, wood frame (single glass) and concrete roof. Baseline model of the low-income detached houses was proposed. Result: Annual heating energy consumptions were decreased by about 3.2% with the window system replacement(Case 1), 9.3% with reinforcement of insulation(Case2), and 12.5% with both(Case 3) compared to those of baseline model. The construction cost will be recouped within 5 years for the Case 1, 3 years for the Case 2, and 3 years for the Case 3. Case 3 was the most cost beneficient construction method in the analyzed cases in this study.

A Study on Smart Home Power-Control System with Power-Saving Green Adapter (전력절감 그린어뎁터를 이용한 스마트홈 전력 통제시스템)

  • Yoo, Seung-Jae;Park, Hee-Dong;Kim, Song-Gang
    • Convergence Security Journal
    • /
    • v.13 no.4
    • /
    • pp.85-92
    • /
    • 2013
  • Today we have an obligation to pass the beautiful earth and enrich people's lives to next generations. According to the keynote, governments have a lot of resources to support the smart grid policies. Also the demand of the implementation of smart home applied the concept of smart grid is increasing rapidly. But the construction of smart home is centered on a new public housing except the pre-existing house which is counted for most of more than 90% of total. In this study, we suggest the implementation solution to make smart-homelike for the pre-existing houses without additional wiring or construction. We develop the technology reducing the unnecessary standby power 800mW to 20mW drastically. If we apply this technology, by the power off of main IC the actual power depends on the consumption of minimal devise located on the AC input side. Then the standby power becomes approximately 20mW(110ac).