• Title/Summary/Keyword: 건축물 시설안전대응

Search Result 14, Processing Time 0.018 seconds

A Study on the Methods of Initial Response Wooden Cultural Asset Architecture by Fire (목조 문화재 건축물의 화재로 인한 초기 대응 능력에 관한 조사 연구)

  • Lee, Sungwoo
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.9
    • /
    • pp.112-121
    • /
    • 2019
  • Title of management of cultural asset architectures made of wood managed by nation or local government is separated and there is a high concern about the disappearance of many national cultural asset architectures by fire. This study investigated the effectiveness of major installed appliances in terms of disaster prevention, and problems by early suppression in the event of fire and by mobilization of fire engines in depth. Also, this study derived problems by conducting an in-depth individual interview on interested parties for installation of fire extinguishing system by related law and to improve system to make realistic maintenance. As a result, it was identified that they have reached the positive aspects of protecting cultural asset architectures from disaster as fire by maintaining and managing facilities by establishing proper disaster prevention measures because they are surrounded by mountain or buildings are contiguous. Wooden cultural asset architectures are often excluded from regulation for installation of fire-fighting facilities under the Fire Services Act because most of wooden cultural assets are detached buildings, occupy small area, and are one-storied architecture. The best method is having extinguishing ability themselves according to the manual by making fire manual as management policy before the outbreak of fire. This study intends to suggest a follow-up study for practical considerations to establish or designate a professional management agency for them to protect important national cultural heritage buildings at the state level before they are destroyed by fire.

Schematic Design Study for the Reconstruction of Hongpa Primary School (서울 홍파초등학교 재건축 계획 설계 연구 요약)

  • Shim, Woo-Gab;Kim, Seung-Je
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.4 no.1
    • /
    • pp.53-64
    • /
    • 1997
  • 지난 20여년간의 비약적 경제 성장을 통하여 우리 사회는 모든 물리적 측면에서 양적인 성장과 질적인 발전을 거듭하여 왔다. 이러한 경제 성장기를 거치면서 우리의 삶은 다각도에서 변화를 겪었으며 건축환경에도 많은 변화가 있었다. 정보화, 세계화라는 시대적 흐름은 우리의 생활자체를 급속도로 변화시키고 있으며 업무용 시설을 포함한 모든 건축물이 대형화, 고층화 뿐 아니라 정보화, 현대화되고 있다. 그러나, 교육의 중요성과 이를 뒷받침해 줄 학교 시설의 중요성에도 불구하고 교육환경의 질적 개선은 상대적으로 낙후되어 있는 상황이라고 할 수 있다. 교육개혁위원회의 교육개혁방안이 계속적으로 나오고 있고 서울의 불암초등학교를 필두로 한 시설 현대화 시범학교가 시도별로 마련되고는 있지만 전반적인 교육 환경은 아직 열악한 상태이다. 특히 구도심부에 위치한 초등학교의 경우, 준공된 후 30년 이상 경과된 학교 건물을 사용하고 있는 경우가 적지 않아 안전상의 문제마저 안고 있는 실정이다. 따라서, 건물의 내구 연한이 그 한계에 달해 가고 유지보수비용이 계속적으로 늘어 경제성을 잃어 가고 있는 학교들을 대상으로 한 재건축과제가 신설 학교의 신축 또는 기존학교의 이전 못지 않은 주요 과제로 대두되고 있다. 더욱이 기존 학교의 재건축사업은 수업을 진행시켜가며 철거 및 신축공사가 단계적으로 수행돼야 한다는 어려움을 갖고 있다. 본 연구는 초등학교의 재건축을 위한 기본적인 자료를 정리하고 배치 및 평면 계획을 중심으로 한 계획 대안을 작성, 검토하여 대안별 장단점을 분석한 후 가장 바람직하다고 평가되는 안을 제시하는 것을 연구의 범위로 하였다. 계획안의 작성에 앞서 실시된 문헌조사 및 실측조사를 통하여, 신축되는 홍파초등학교에 필요한 시설의 내용 및 규모가 산정되었는데 특기할 사항은 좁은 대지임에도 불구하고 가능한 체육관 시설을 포함시키고자 하였다는 것이다. 홍파초등학교 부지는 $8,960m^2$ 정도밖에 안되는 좁은 부지로서 운동장도 제대로 확보할 수 없는 상황이었으나 체육관의 높은 활용도 및 장래의 필요성을 고려하여 소규모라도 계획되는 것이 바람직하다고 판단하였다. 열린교육에의 대응, 제반 특별교실의 확충, 식당 및 지하주차장의 확보 등 모든 시설이 현재 및 장차의 사용에 적합하도록 계획하여 현 시설의 1.5배 정도의 연면적을 갖는 신축 계획안을 작성하였다. 서울대학교와 광운대학교에서 분담하여 실시된 계획안의 작성을 통하여 총 4개의 계획안이 도출되었으며 이 대안들을 채광 및 환기, 학년별 zoning, 기능별 zoning, 열린교실의 정도, 지역사회에의 개방성, 재건축 공사의 용이성, 규모, 옥외공간의 활용성, 동선 계획, 조형성 등 10개 항목을 기준으로 평가하였다. 이러한 비교분석을 통하여 결론적으로 제1안을 최적안으로 제시하게 되었으며, 이를 바탕으로 구체적인 최종 설계안이 도출되기를 기대하는 바이다.

  • PDF

The Influence of the Presence of Balconies on Flame Acceleration in Multi-unit Dwellings (공동주택의 발코니 유·무가 화염분출 특성에 미치는 영향 연구)

  • Kang, Youn-Gyu
    • Fire Science and Engineering
    • /
    • v.30 no.2
    • /
    • pp.1-6
    • /
    • 2016
  • We are living in the 21st century, a new era of high-technology. Due to movements in population towards certain preferred areas, caused by material and technological advancement, growth has occurredn beyond the metropolis, leading to the development of the so-calleda "megalopolis." This development has changed the culture of housing, notably the characteristics of high-rise buildings, and underground facilities (such as subways and shopping centers), and has generally enlarged the scale of the facilities. Due to the increase in the number of single-family households, - notably ones including only the nuclear family, there has been a growing overpopulation problem, with apartments and urban housing developments expanding at rates beyond institutional safety regulations. In this study, we analyze the phenomenon of fire spreading in apartment buildings through actual apartment fire case studies, including that of the MunjonPonpuri apartment building. It was found that the speed at which the fire spreads is lower in apartments without than in those with an extended balcony. Based on the findings from case studies and the test results, we propose a series of safety countermeasures and responses for apartment fires.

A Basic Study of Development of Post-disaster Refugees Housing Performance Index (재난대응 구호주거 성능지표 개발을 위한 기초연구)

  • Nam, Hye-Ryeong;Lee, Won-Hak;Kang, Su-Min;Kim, Sung-Tae;Cho, Young-Jun;Lee, Byung-Yun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.744-754
    • /
    • 2017
  • In this study, an analytic hierarchy process (AHP) was conducted with the aim of developing a post-disaster refugee housing performance index system (PPS) to improve the post-disaster refugee housing (PRH) performance criteria for the foundation of quality-based development. The PRH was defined as a mid-term temporary housing facility that is used for a certain period before the permanent housing is established. The safety, rapidity, reusability, habitability, and economy were derived from major performance factors through prior research. A hierarchical PPS was organized by linking the major performance factors with the whole life cycle process of PRH. The priority of each performance index of PPS was determined quantitatively using the analytic hierarchy process through an expert survey. Based on AHP analysis, the performance criterion of the total weight 1-10 ranking and the performance criterion of the first rank in each category were classified into the essential performance criterion (must be achieved) and the others were classified into the recommended performance criterion (optional achieved) and the performance index was constructed considering all stages of PRH development. With the completion of the PRH performance index, it is expected that victims will be able to secure stable residence and return to their daily lives quickly.